Loading...

Please wait ...

CSR Consultant and Associates logo logo
C

CSR Consultant and Associates

Multiple locations

(4)
This professional is currently unavailable.
You can request reply and they will reach out as soon as they can.

About

An ISO 9001:2015 certified company with dynamic conglomerate of 15 licensed Engineers with 1100 plus Structural Audit projects dedicated towards the Building Civil repair; in and around Mumbai, Thane and Navi Mumbai, Pune, Vapi region. We are BMC (MCGM), NMMC, KDMC and TMC approved Licensed Structural Engineers for carrying the Building Audits for your structures.

Show more

1 day response time

Videos (1)

See all

Reviews (4)

Leave a review
5/5

4 customer reviews

Loading...
24 June 2023

Honest, punctual and dedication towards work. Capable of handling challenging projects. Timely inspection by site engineer.

24 June 2023

Good & quality work within time

20 June 2023

I recently had the pleasure of engaging the services of a CSR, and I am delighted to share my positive experience in this review. The firm's exceptional expertise, professionalism, and dedication to delivering high-quality results surpassed my expectations. From their skilled team of professionals to their efficient project management, the structural repair firm proved to be a reliable partner for all my structural repair needs. More...

CSR Consultant and Associates
C

Reply from CSR Consultant and Associates

Thank you sirjee

20 June 2023

CSR has excellent project management skills, effective leadership, creativity, and communication. The most important skill they have is the ability to solve complex problems and they are involved in every stage. CSR is good in conducting on-site investigations and analyzing data. More...

CSR Consultant and Associates
C

Reply from CSR Consultant and Associates

Thank you for your special motivating lines.

Q&As

Providing technical solutions towards the Civil engineering practises to our clients who have been facing issues like RCC distress and seepages being faced by them.

Being a professional, it is our duty to provide best of the services at reasonable cost. This idea itself actually demanded us to start our consultancy services. With friends from similar background, was easy to learn.

For professional approach, without any hidden costs associated with our services. We at CSR never practice of unnecessary lowering civil repair and painting budgets to woo the members initially and then repent later.

Our services are at site with Clients location only.

Vaccination to entire staff and maintaining safe distance while interacting.

Services

a. Structural Inspection with visuals and tapping for External areas - Terrace area, Water Tanks, Parapet and Chajjas conditions, Plumbing condition, Common areas water logging, Common Passages, Dead wall water seepage, Drainage lines, Basement seepage and dampness, Plaster condition, Seepages at Wet and dry areas, Paint conditions, Plinth areas, RCC sunshades and others.

b. Inspection for Common Internal areas (including staircase, Basements, Commercial shops, Lobby and Passage) for identification of deficiencies / damages.
c. Inspection of property, structural and non-structural part of every flat and commercial establishment from inside. Noting damages for source analysis purpose.
d. Submit the report for the extent of damages, precautionary measures and repair measures towards restoration purpose.
e. Our specialization: Evaluate optimum repair work including estimation for various items works, different budget possibilities with various feasible alternative solutions available in the market. Suggesting best alternates after discussion with the owners.
f. By default repairs solutions for 10 years and 7 years, kind of repair works shall be provided.
g. “Proforma B” format in the structural audit report as per Municipal guidelines shall be incorporated in report.
h. Attaching photographic evidence for the condition of specific damages along with appropriate remarks.

a. Supervision of entire project from start to completion of work.
b. Co-ordinate periodic meetings of Contractor with Committee members.
c. Check Quality, Running bill measurements and certify the billing accordance with the advice.
d. Check Quantity periodically for budgetary purpose.
e. Keep checks on schedule and budget intermediately and keep the Client updated.
f. Keep the Client posted for any deviation in the working and take final call after discussion with them.

STEP-2 FREEZING SCOPE OF WORK AND TENDER MANAGEMENT
a. Final preparation of BOQ in agreement with the Managing and Repair committee.
b. Preparation of tender document along with Technical specifications.
c. Post opening of sealed tenders, submission of comparative statement for offers from various bidders received.
d. Scrutinize the Profiles, Techno-commercial offers, Terms and conditions laid; if any by the participants.

STEP-3 SELECTION OF CONTRACTOR, NEGOTIATIONS AND AGREEMENT MAKING
a. Arranging one to one meetings of Managing / Repair Committee with Contractors
b. Contract negotiation and finalization of contractor with agreed terms and conditions.
c. Issue draft for Letter of Indent (LOI) and finalize for mobilization of work
d. Draft agreement between Society and Contractor as binding document.
e. Plan time Schedule and work force requirement details with the Contractor.

STEP-4 MOBILIZATION, SUPERVISION, QUALITY CHECKS, QUANTITY CHECKS & SCHEDULING
a. Supervision of entire project from start to completion of work.
b. Co-ordinate periodic meetings of Contractor with Committee members.
c. Check Quality, Running bill measurements and certify the billing accordance with the advice.
d. Check Quantity periodically for budgetary purpose.
e. Keep checks on schedule and budget intermediately and keep the Client updated.
f. Keep the Client posted for any deviation in the working and take final call after discussion with them.
STEP-5
a. Closure of project with satisfactory letter from Society.
b. Service Warranties terms receivable from Contractor.
c. Settlement of final bill payment and retention amounts statement.
d. Statement for closure of project.

Checking of the terrace floors and suggesting methodogies for waterproofing of same as per the life expectancy.

FEASIBILITY REPORT FOR REDEVELOPMENT
a. Collating of various documents acquired by Society.
b. Evaluating Plot Potential, surrounding valuation and specific points.
c. Find section plans from Municipal Corporation for road widening and other relevant details.
d. Evaluate the FSI availability, TDR costings as per latest DCR2034.
e. Statutory requirement of documentation.
f. Studying of approved Building Plan for current erected Structure.
g. Evaluating the potential of plot with respect to size and as per DCR2034 rules.
h. Evaluating construction cost, margin cost, new developed saleable cost.
i. Evaluate the saleable component and other amenities.
j. Mapping of new areas with existing carpet areas of each Owners.
k. Check the fungible areas, available fungible as per new DCR.

Twitter