Oluwasegun - Radio Frequency Engineer - Doha, Qatar

Palmer Oluwasegun

Doha, Qatar

Services

Radio Frequency Engineer

Summary:

Installation,Integration and Upgrade of BTS
I also confure and installed Microwave point to point installation

Work History

INSTALLATION ENGINEER

Etisalat Dubai UAE Project

PROJECT EXPERIENCES
Primary Duties and Responsibilities:


➢ Supervising Riggar for proper Installation and consider all parameter were well taking.
➢ Supervision of New Green Field /rooftop RBS 6000series Installation.
➢ Troubleshooting of Microwave and RBS installation in faulty conditions
➢ Integration of 3G mobile system/cross connection to the network
➢ Alarm defining/Alarm clearing in all new installation.
➢ Installation( Site Support Cabinet)
➢ Commissioning and troubleshooting of site.
➢ Installation of new cabinet.
➢ Site Auditing and site Upgrading.

BTS /Transmission Installation Engineer

DRFCO Group of Companies

PROJECT EXPERIENCES

BSS/RF/Transmission/Installation Engineer

Erricsson Cotonou

PROJECT EXPERIENCES

INSTALLATION ENGINEER

MTN Benin Project

Primary Duties and Responsibilities:
➢ Installation of RBS 6000 series
➢ Installationof PBC 6500, PBC05/ZTE
➢ Integration of 2G and 3G.
➢ Alarm defining/Alarm clearing
➢ Installation( Site Support Cabinet)
➢ Commissioning and trouble shouting of site.
➢ Installation of new cabinet.
➢ Installation of traffic Node
➢ Configuring of Radio links
➢ Site supervision.
➢ Site Acceptance
➢ Preparation of SID

BSS MAINTENANCE ENGINEER MTN

GLO Maintenance Project

Primary Duties and Responsibilities:
➢ 2G / 3G RBS Maintenance
➢ ZTE / Huawei Hybrid Installation
➢ ZTE / Huawei Hybrid Supervision
➢ Site Trouble shooting
➢ AVR Expertise/ maintenance
➢ PHCN Inspections
➢ RBS Swap and Upgrade.

MICROWAVE INSTALLATION ENGINEER

March 2010 - June 2011

Primary Duties and Responsibilities:
➢ Installation and Configuration of new Microwave point to point installation.
➢ Transmission Network installation/Technical site survey (TSS) for planning and Path Survey to verify the planned topology based on the actual condition
➢ Line-of-sight (LOS)/Transmission Path survey using balloon, roaming and observation with the use of GPS for the implementation of microwave transmission links
➢ Working with the Implementation team to perform construction design to specify the minimum antenna height for tower construction
➢ Report daily project update to the project manager
➢ Perform Path Survey for MW to ensure good quality of LOS
➢ Collect nominal of proposed site and those of the nearest locations to which customer proposes the LOS connectivity & Verification
➢ Record latitude, longitude, building data, obstruction data and surrounding terrain data on the LOS Survey template

INSTALLATION ENGINEER

Airtel Project

Primary Duties and Responsibilities:
➢ Installation of RBS Node B/ SSC
➢ Installation( Site Support Cabinet)
➢ Commissioning and trouble shouting of site.
➢ Installation of new cabinet.
➢ Installation of virgin Site.
➢ Site supervision.

Project Cordinator

TSSR SURVEY. ZTE/MTN Swap/Modernisation Project

March 2010 - June 2011

Primary Duties and Responsibilities:
➢ Site auditing and Design.
➢ Give details of all equipment.
➢ Escalate any issues relating to RF
➢ Planning and design of new equipment and were to be installed.

MW LOS SURVEY ENGINEER

NSN/ Etisalat

March 2009 - June 2010

Primary Duties and Responsibilities:
➢ Transmission Network Survey/Technical site survey (TSS) for planning and Path Survey to verify the planned topology based on the actual condition
➢ Line-of-sight (LOS)/Transmission Path survey using balloon, roaming and observation with the use of GPS for the implementation of microwave transmission links
➢ Working with the Implementation team to perform construction design to specify the minimum antenna height for tower construction
➢ Report daily project update to the project manager
➢ Perform Path Survey for MW to ensure good quality of LOS
➢ Collect nominal of proposed site and those of the nearest locations to which customer proposes the LOS connectivity & Verification
➢ Record latitude, longitude, building data, obstruction data and surrounding terrain data on the LOS Survey template
➢ Generate LOS Path Profile for the proposed Link using Path Loss 4.0, MapInfo and Google Earth
➢ Conduct Path Flash and Mirror test to further verify LOS clearance

RF Engineer for South-West

NSN MTN

March 2009 - December 2010

region in Nigeria conducting 2G and 3G drive tests using Ericsson TEMS Data collection 9.0,11 and 11.04 involving 2G frequencies scanning.

RESPONSIBILITIES:
➢ Conducting 2G Drive test with RF frequency scanning using Z750i UE.

➢ Identifying and making recommendations towards resolutions of areas of inference, swap sector, Cell dominance issue, etc.

➢ Conducting Cluster DT in idle, dedicated and packet mode in order to detect and correct major network coverage and call quality issues related to Rx_level, Rx_Qual, SQI, Call drop, Interference, swap sectors, overshooting, GPRS Attach/Detach, RAU failure, PDP Context failure, etc

Field TSS Survey Engineer

TSS

June 2008 - April 2009

conducting Preliminary Site Survey for virgin, already acquired and Backbone sites.

RESPONSIBILITIES INCLUDE:
➢ Conducting Preliminary Site Survey for virgin and already acquired sites
➢ Working with EMTS SAQ, MW LOS/RF Planning Engineers to ensure proper planning.
➢ Collect list of Nominals to be surveyed, from the customer. In case of new town surveys where Nominals are not provided, Aster will survey the town and provide a nominal for suitable site location
➢ Use the survey report template forwarded by the customer
➢ Identify physical location of the proposed nominal and locate 3 candidates (maximum) for each nominal, as per search ring size suggested by the customer
➢ Survey the site for RF suitability
➢ Record Latitude and Longitude, building height etc. of the proposed candidates
➢ Estimate and provide required GSM Antenna heights and orientation, proposed tower / pole location (s) will also be marked on a rough sketch of the building (rooftop) or ground site (for each candidate)
➢ Take site photographs (360 degrees panoramic view and building / site elevation) for each candidate as given in the survey template by you
➢ Record physical addresses of the candidates and site owner / manager contact details (where available)
➢ Complete the Site Survey Candidate evaluation report
➢ Provide up-to-date reports within time limit

Qualifications & Certifications

Osun State polytechnic Iree

Osun State Polytechnic Iree

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?