Isaac Gem - Rope Access Technician/NDT Inspection - Vilseck, BY, Germany

Orogun Isaac Gem

Vilseck, BY, Germany

Services

Rope Access Technician/NDT Inspection

Summary:

Rope access is all about using rope techniques to get to hiding and inaccessible areas in order to get a particular job done while NDT means Non destructive Test method.

Work History

NDT INSPECTOR/ROPE ACCESS LEVEL 2

TOTAL EXPLORATION & PRODUCTION NIGERIA LIMITED

From May 2013

PROJECT: OFON 2
General maintenance.
NDT Inspections using Rope Access techniques.

MECHANICAL INTEGRITY ENGINEER/ROPE ACCESS LEVEL 2

MOBIL PRODUCING NIGERIA LIMITED

From February 2013

PROJECT: EDOP, UBIT, ETIM, EKPE , ADUA & OSO PRODUCTION PLATFORMS
Ultrasonic Inspections of Risers and pipeline using Rope Access
General and close Visual Inspections of Risers.
Dimensional measurement of Riser as required by the client

ROPE ACCESS LEVEL

TOTAL EXPLORATION & PRODUCTION NIGERIA LIMITED

October 2012 - December 2012

2
PROJECT: AKPO FPSO FULL FIELD SHUT DOWN
General maintenance and Rope Access work throughout the FPSO.
Installations & Removal of chain blocks, beam clamps, stand by rescue and other related jobs.
Standby Rescue for tank entry and filling of Oxygen gas cylinders

MECHANICAL INTEGRITY ENGINEER/ROPE ACCESS LEVEL II

TOTAL EXPLORATION & PRODUCTION NIGERIA LIMITED

May 2012 - June 2012

PROJECT: USAN FPSO HUCK UP
Hulling of load, Installations & Removal of beam clamps, chain blocks and general
rope access work.
Perssivation of stainless steel pipes, pressure vessel & boilers using Rope access.
Insulation of pipes using Rope Access.

MECHANICAL INTEGRITY ENGINEER/ROPE ACCESS LEVEL II

TOTAL EXPLORATION & PRODUCTION NIGERIA LIMITED

March 2012 - April 2012

PROJECT: USAN FPSO HUCK UP
Pulling of electrical and generator cables on height using Rope Access.
Hulling & Installation of PSV valve on the tip of Flair.

MECHANICAL INTEGRITY ENGINEER/ROPE ACCESS II

TOTAL EXPLORATION & PRODUCTION NIGERIA LIMITED

January 2012 - February 2012

PROJECT: USAN FPSO HUCK UP
General maintenance and Rope Access work throughout the FPSO.
General & Close Visual inspection and Ultrasonic Testing storage tanks (crude, water ballast,
Void e.t.c) on the FPSO.
Re-tagging of Life boats .i, e changing the names of the life Boats.

NDT INSPECTOR/ROPE ACCESS II

CENTURY ENERGY NIGERIA LIMITED

July 2012 - August 2012

PROJECT: MYSTRAL & AMANDA PANANDA FPSO
Ultrasonic thickness gauging and general/close Visual inspection of Crude tanks,
water ballast tank, void tanks. Etc.

NDT INSPECTOR/ROPE ACCESS LEVEL 2

TOTAL EXPLORATION & PRODUCTION NIGERIA LIMITED

From December 2011

PROJECT: AMINAM, ODUDU & OFON PRODUCTION PLATFORMS
Friction test on Hellidecks
MPI & Visual Inspection on the pad eyes of the lifting point of the Hellidecks

MECHANICAL INTERGRITY ENGINEER/ROPE ACCESS II

TOTAL EXPLORATION & PRODUCTION NIGERIA LIMITED

October 2011 - November 2011

PROJECT: USAN FPSO HUCK UP AND COMISSIONING
General maintenance and intervention team, Rescue and Rigging and Hulling.
Standby rescue for personnel entering tanks.

NDT INSPECTOR/ROPE ACCESS LEVEL 2

TNL

From November 2011

PROJECT: BALTIC RIG.
Ultrasonic thickness gauge Inspection on main Deck Plate of Changing Room.
Ultrasonic thickness gauge Inspection on steel area under the Radiator.
Magnetic particle Inspection on Mud pump1 crank Shaft and lifting Pad eye above mud pump 1.

MECHANICAL INTEGRITY ENGINEER/ROPE ACCESS II

MPNL

From September 2011

PROJECT: OSO RODUCTION PLATFORM
NDT Inspection of condensate & gas injector risers.

MECHANICAL INTEGRITY ENGINEER/ROPE ACCESS II

12. TOTAL EXPLORATION & PRODUCTION NIGERIA LIMITED

July 2011 - August 2011

PROJECT: AMENAM PRODUCTION PLATFORM (AMP1 CRANE 20T)
Eddy current Inspection on the boom, pedestrian and other parts of the crane as specified by the client
MPI and DPI Inspection on pedestrian bolt and nut, the boom welds and other parts as required by the client

MECHANICAL INTEGRITY ENGINEER/ROPE ACCESS II

APNL

From June 2011

PROJECT: SENDJE BERGE FPSO
Ultrasonic and Visual Inspection of ballast and crude tanks

MECHANICAL INTEGRITY ENGINEER /ROPE ACCESS LEVEL 1

14. CHEVRON NIGERIA LIMITED

February 2011 - April 2011

FEB-APRIL 2011
POSITION: MECHANICAL INTEGRITY ENGINEER /ROPE ACCESS LEVEL 1

PROJECT: (ESCAVROS)
A. OKAN PRODUCTION PLATFORM (JK 68 &48).

Welding and installation of bracket on top of Helideck.
Surface preparation of Risers for clock spring installation
General and close Visual Inspection on Risers.


B. DELTA SOUTH PRODUCTION PLATFORM. (jk 17,5,10,22 &28)
General and close Visual inspection on Risers and pipelines.
Installation and clamping of Rings for long range Ultrasonic Inspection
C. MEREN 2, PARABE, AND ISAN WEST PRODUCTION PLATFORMs
Taking Dimensional length of Risers and replacement of Nuts and Bolts on flanges

NDT INSPECTOR/ROPE ACCESS TECHNICIAN

15. CHEVRON NIGERIA LIMITED

October 2010 - November 2010

PROJECT: (ESCAVROS)
PENINGTON PLATFORMS, JACKET 113, ECHO & KILO).
Visual, Close Visual, and Ultrasonic Inspection on risers & pipelines using Risers
Using Rope Access

NDT INSPECTOR/ROPE ACCESS TECHNICIAN

16. MOBIL PRODUCING NIGERIA LIMITED

July 2010 - August 2010

PROJECT: ERHA NIGERIA DEEPWATER (FPSO).
Ultrasonic, Eddy current, magnetic and visual inspection on high pressure vessels,
pipelines and Risers Using Rope Access.

NDT INSPECTOR/ROPE ACCESS TECHNICIAN

17. MOBIL PRODUCING NIGERIA LIMITED

May 2010 - June 2010

PROJECT: ERHA NIGERIA DEEPWATER (FPSO).
Ultrasonic, Eddy current, magnetic and visual inspection on high pressure vessels,
pipelines and Risers Using Rope Access.

NDT INSPECTOR/ROPE ACCESS TECHNICIAN

18.MOBIL PRODUCING NIGERIA LIMITED

February 2010 - March 2010

PROJECT: ERHA NIGERIA DEEPWATER (FPSO).
Ultrasonic, magnetic and visual inspection on broken water Casin using Rope Access.

NDT INSPECTOR/ROPE ACCESS TECHNICIAN

19. TOTAL EXPLORATION & PRODUCTION NIGERIA LIMITED

January 2010 - February 2010

PROJECT: UNITY FSO
Close Visual, magnetic particle and eddy current inspections on water tank Using Rope Access.
PROJECT: OFON PRODUCTION PLATFORM.
Visual and magnetic particle inspection on crane Using Rope Access.
Close visual inspection on telecommunication mast Using Rope Access.
PROJECT: ODIDI PRODUCTION PLATFORM.
Close visual inspection on telecommunication mast Using Rope Access.
Visual & Ultrasonic inspection on bridge Using Rope Access.
PROJECT: AMINAM PRODUCTION PLATFORM.
Ultrasonic inspection on AMP1 production pipelines Using Rope Access.

MECHANICAL INTEGRITY ENGINEER/ROPEACCESS

20. CHEVRON NIGERIA LIMITED

May 2009 - November 2009

PROJECT: (ESCAVROS) OKAN, EWAN, MEREN, MEJE PLATFORMS AND JACKET)
1. Installations of clock spring and plithcosmith clamps on Risers Using Rope Access.
2. NDT inspections on Risers and pipelines Using Rope Access

MECHANICAL INTEGRITY ENGINEER/ROPE ACCESS I

21. SHELL PRODUCTION AND DEVELOPMENT COMPANY

November 2008 - March 2009

PROJECT: SEA EAGLE FPSO.
Wiring and installation of fire wire heat detector throughout the
FPSO Using Rope Access.

PROJECT OFFICER

22. ASSOCIATED DRILLING AND GEOTECHNICS NIGERIA LTD

March 2007 - September 2008

Novem Plaza, Second Floor, Wing C, 3-9, olukole-osho street, Ikeja, Lagos. Nigeria.
POSITION: PROJECT OFFICER.
RESPONSIBILITY
1. Geological and geophysical investigation of Site before commencing any work.
2 .Supervision of investigation of Sub Soil
3. Supervision of Drilling and construction of Bore Hole
4 Environmental Services in order to ensure those activities on site do not have negative effect in the environment.
5. Taking logistics of Materials needed for every project

RESEARCH OFFICER

23. UNIVERSAL TRADING COMPANY ENGINEERING LIMITED

July 2006 - February 2007

Plot 3, Block D, Amuwo Odofin, Apapa - Oshodi Express Way, Lagos.
POSITION: RESEARCH OFFICER.
JOB DESCRIPTION:
Ascertains where Perkins Generators are used and who uses them
To find out the competitive level of the product in the market.
Makes recommendations of the findings to the management for action.

Physics Teacher

24. NATIONAL YOUTH SERVICE CORPS

March 2005 - March 2006

SS 3
Further Mathematics Teacher SS 2 and SS 1
Mathematics Teacher SS 2

Qualifications & Certifications

Geophysics

University of Lagos

Geophysics

Ambrose Alli University

identification and management

1. Nigerian institute

Ebor Secondary School Ebor

Isero Grammar School

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?