Ramagiri - Project Sales - HVAC - Hyderabad, Andhra Pradesh, India

Omprakash Ramagiri

Hyderabad, Andhra Pradesh, India

Summary

Hi! This is OMPRAKASHH, I got a wide range of experiences in HVAC industry in different areas including HVAC Designs, Drafting for Clean rooms & Validation, Central Air Conditioning Systems, Material Planning & Project Estimation / Tendering. I have proved myself in Project Sales at Blue Star Malaysia branch & met beyond the annual target of RM30 Million.

Services

Project Sales - HVAC

Summary:

Project Sales for Air-Conditioning & Mechanical Ventilation services for multistory commercial buildings like Offices, Hospitals, University Buildings, Shopping Malls & Hotels etc., on turn-key basis for Centralized or District cooling systems.

Work History

Bangsar South Club House

Multi Purpose Water Cooled Package - 4.90
224.46


PROJECTS HANDLED IN 2010 (BLUE STAR, MALAYSIA)
Sl No Project Name Job Type System Capacity (TR) Value in Million (RM) Remarks
1 UiTM Phase-1&2 University Water Cooled 250 5.70
2 DBKL Offices Air Cooled 300 3.00
3 Temerloh Hyper Market Hyper Market Water Cooled 500 3.39
4 Ventilation System for Brunsfield Block C, D & E Ventilation - - 3.25
5 Re Tendering - Crest World Wide Offices Water Cooled 1300 12.85
6 Klang Specialist Hospital (Heathcare Services) Hospital Water Cooled 1080 8.30
7 KL Sentral Lot-A (MRCB) Offices Low Side of District Cooling - 58.00
8 HUKM University Low Side of District Cooling - 6.50 Successful
9 Desa Park City Hospital Hospital Water Cooled 1000 11.03

KL Sentral Lot-G (Tower-1 & 2)

Offices Low Side of District Cooling - 20.55 Successful
13 KL Sentral Lot-G (Tower) Hotel Low Side of District Cooling - 9.80
14 Scenic Point Development Service Apartment Air Cooled - 14.07
179.44

Engineer

Tendering & Sales, Blue Star M&E Engineering Sdn Bhd, Malaysia

December 2009 - February 2013

Sr. Engineer - Projects

M&W Zander Facility Engineering (India) Pvt Ltd

January 2009 - November 2009

Hyderabad.

Engineer - Tendering & Sales

Blue Star M&E Engineering Sdn Bhd

December 2009 - February 2013

Malaysia.

The Organization is specialized in providing the Air-Conditioning & Mechanical Ventilation services for multi storey commercial buildings like Offices, Hospitals, University Buildings, Shopping Malls & Hotels etc., on turn-key basis for Centralized or District cooling system applications.
I have been recruited for Engineer - Planning, but adopted for Tendering & Sales (Estimator) to achieve the target of RM30 Million (US $10 Million) for the year.
My role involves review the draft tender drawings & documents for preparation of the technical & commercial bids, understand the type of project & system implemented, review of drawings to identify any difference between drawings to tender specification and raise queries against specification & raise request for information for any discrepancy / missing information from consultant, preparing the tender notes from tender documents & drawings, undertake review and generation of Bill of Quantity against system drawings along with a team, identify material types & quantities and prepare equipment lists for cost estimation for ducting, piping, grills, diffusers, valves & other items involved, sending enquiries to vendors for quotations of various materials and equipments to evaluate the same against tender specifications, preparing comparisons for various items based on the quotations with reference to the specifications & cost. Preparation of project cost & review with higher management (reporting boss) & getting approval to proceed for preparation of technical details & schedule of prices / tender cost summaries for final submission of the tender, also attending for tender clarifications / amendments during tender evaluation stage for winning the job.
Refer the attached list of projects handled during the year 2010 - 2013.

I have also involved in site execution for a period of 3 months for the project Capital Square Tower during its completion stage for attending defects in air distribution system like...

Sr. Engineer - Projects

M & W Zander Facility Engg. (I) Pvt Ltd., Hyd

January 2009 - December 2009

Projects:
➢ University of Hyderabad., Hyderabad, India
Cleanroom & HVAC design for Class-100, Centre for Nano Technology area & Material Indenting.
System Description: The project consists of Nano fabrication area which is to be designed for Class-100 using UPLA filters (0.1 micron down to 99.9997% efficiency) and a pressure gradient of 45 Pascals and other Class-10K areas by using HEPA filters (0.3 micron down to 99.97%) efficiency with pressure gradient of 30 Pascals.
Total capacity is 70TR.
➢ Dr. Reddys Laboratories Ltd., Hyderabad, India
Cleanroom & HVAC design for Class-100K New Dispensing area & Air washer system design for Isoflorane block.
➢ Dr. Reddys Laboratories Ltd., Hyderabad, India
Design of Cleanroom & HVAC for Class-10K, Omeprazole area & WareHouse, Material Indenting, Site Co-ordination & Validation. Total capacity is 60TR.
Jan 2008 - December 2008 Sr. Engineer - Planning & Design: ETA Engineering Pvt Ltd., Hyderabad


Projects:
➢ Biological E. Ltd., Shameerpet, Hyderabad
HVAC design for sterile filling line of ISO-8, Heat load calculation for 85TR capacity, room data sheet preparation & drawings like Airflow schematic, ducting, piping, HEPA fixing details for Knife edge gel seal type filter, getting quotation for preparation of comparisons for vendor finalization, preparation of material submittal for HVAC items for approval. Total capacity is 85TR
➢ ICICI Bank Ltd., Gachibowli, Hyderabad
Type: 4B + G + 16 Levels
Capacity: 7750 TR
ETA Scope: High side MEP Installation Works (Equipments, Ducting, Piping & Insulation)
My scope involves material planning for the project asper the project schedule. Review the site progress and to update the client / project management group on weekly basis. I also involved in QC activities at different levels like receiving the material asper the material specification, make sure to store the material safely to meet the green building norms & to check the quality of work asper the specifications of the project.

Sr. Engineer

Planning & Design, ETA Engineering Pvt Ltd

January 2008 - December 2008

Hyderabad.

Design Engineer

HVAC, ETA LLC

May 2007 - December 2007

Dubai, UAE.

Design Engineer - HVAC

ETA LLC

May 2007 - December 2007

Dubai


Project: Dubai Marina Mall, Hotel & Hotel Apartments
Type: 2B + LG + G + Retail Mall (5 Levels) + Hotel (8 Levels) + Hotel Apartments (25 Levels)
Capacity: 8000 TR
ETA Scope: MEP Installation Works


MY SCOPE OF WORK:
➢ Distribution of 1738 Nos. of FCUs for different areas like Retail, Hotel & Hotel Apts.

➢ Chilled water piping quantity take off for ordering (89 KM rmt) & Piping insulation.

➢ Quantity take-off, ordering, material follow-up & distribution of Volume Control Dampers (Approx.6000 Nos.),

➢ Fire dampers (Approx. 4500 Nos.) Motorized Smoke Fire Dampers & Motorized Volume Dampers to the

respective location as per approved drawings for the project.

➢ Ducting, duct insulation & supporting accessories ordering.

➢ Quantity take-off for Control Valves & Fittings for AHUs & FCUs Valve Package & Riser Tapping etc.,

➢ Quantity take-off & ordering of Chilled water piping & pipe insulation.

➢ Quantity take-off & ordering of Grilles & Diffusers for the whole project.

➢ Co-ordination with material store departments for the above mentioned materials.

➢ Preparation of site requisitions for materials required for the project.

➢ Supervising progress of HVAC works.

Engineer - Projects

M&W Zander Facility Engineering (India) Pvt Ltd

January 2004 - May 2007

Hyderabad.

Engineer - Projects

M & W Zander Facility Engg. (I) Pvt Ltd., Hyd

January 2004 - May 2007

The Organization is specialized in Consulting, Design, Build & Validate the Cleanroom facilities on turn-key basis for advanced technology fields like Scientific Research and Development, Micro Electronics, Life Sciences, Biotechnology and Pharmaceutical applications.
As a Projects - Engineer my role involves Conceptual & detailed Cleanroom & HVAC design engineering for Pharmaceutical, Biotech & Semiconductor facilities, which includes Modular Wall panel & Ceiling panel system design, cGMP layouts, Detailing for HVAC low side design such as Load calculations, Preparation of room data sheets, Equipment selection, Preparation of drawing like Airflow schematics, Ducting layouts, Piping schematics, Filter fixing details. Calculating & locating electrical light fixtures for the facility, Preparation of material specification & BOQs for purchase department, Co-coordinating the project design with site engineers & Conducting Cleanroom & HVAC system airside validation.

Projects:
➢ Dai-Ichi Karkaria Limited., Hyderabad, India
cGMP layout development, HVAC & Modular wall & ceiling panel system design for Class-100K powder processing bulk drug unit and system validation.
➢ Nicholas Piramal (I) Pvt Ltd., Zaheerabad, India
Cleanroom & HVAC design for Class-100K IBU Pharma bulk drug area & Air washer system design for Isoflorane block.
➢ Dr.Reddy Laboratories Ltd., Hyderabad, India
Cleanroom & HVAC design for Class-10K TE-TF & Module-5 blocks
➢ Tibrewala Electronincs Ltd., Hyderabad, India
Cleanroom modular paneling & HVAC design for Class-10K & Class-100K areas and system validation.
➢ Shantha Biotechnics Pvt Ltd., - Hyderabad, India
HVAC design, Modular Wall & Ceiling panel system for E & F blocks of Biotech Plant.
➢ Sri Krishna Drugs Ltd., Shamshabad
HVAC design for Bulk Drug facility of Class-100K area & System validation.
➢ Indian Immunologicals Limited., Hyderabad
HVAC & Modular Wall & Ceiling panel system design for Class-10K In-Activation block.
➢ Nektar...

CAD Engineer

TriGeo Image Systems Pvt Ltd

October 2002 - December 2003

Hyderabad.


Software Knowledge:
➢ Operating Systems: Windows
➢ Packages / Languages: Auto CAD, Auto LISP & C Programming Language

Projects Experience with Employers

Parade Hotel, Perak

From February 1992

10 Kiara Seleksi Office Towers-A&B Split System - 2.92
11 Parade Hotel, Perak, Ipoh Hotel Water Cooled 400TR x 2# 8.50
252.356


PROJECTS HANDLED IN 2011 (BLUE STAR, MALAYSIA)
Sl No Project Name Job Type System Capacity (TR) Value in Million (RM) Remarks
1 Glomac Damansara Office Water Cooled 1200 10.20
2 MITI Head Quarter Office Water Cooled 3200 28.00
3 Azlan Shah Airport, Ipoh Airport Air Cooled 200 1.80
4 LCCT at KLIA, KL Airport Low Side of District Cooling - 65.20
5 Plaza 33 Office Tower Office Water Cooled + VRF 2200+450 8.90
6 YNH Renovation Works (Office to Service Apts) Service Apartment VRV - 3.65
7 Rawang Specialist Hospital Hospital Water Cooled 750 7.76
8 IBU Towers (A&B) Office Water Cooled 2775 45.80
9 St. Regis Hotel (6 Star Hotel), Kuala Lumpur Hotel Water Cooled + VRF 2400+1100 41.10 Successful

Hotel Perdana

From May 1990

Puteri Horbour Mall & Hotel Low Side of District Cooling - 17.10

Ceylon Hills Tourist Hotel

From April 1972

Hospital at Lower Perak, Perak Hospital Air Cooled 300 2.43

Qualifications & Certifications

Mechanical Engg

Kakatiya Institute of Technology & Science, Kakatiya University

Mechanical Engg

State Board of Technical Education

Board of Secondary Education