Hengky Iriawan - Quality Inspector - San Francisco, CA, USA

Octovius Hengky Iriawan

San Francisco, CA, USA

Summary

my ability:
auto cad 2d,3d
english
document
management
inspection
good communication
self motivation
ms.office

Services

Quality Inspector

Work History

NDT Plan and prepare Manufacture Data

March 2012 - November 2012

Responsible for monitoring and inspection of pipe spools and structural, documentation and
Coordination with Client for final inspection.
Prepare and monitor Welder Test, running WPS, NDT Plan and prepare Manufacture Data
Record.

CONSTRUCTION SUPERINTENDENT

GOLAR LNG

December 2011 - February 2012

Project PERTAMINA, Offshore, Java Sea
December 2011 up to February 2012
To plan daily activities based on weekly schedule from client for erection and welding of
Mooring Dolphin (MD) and Breasting Dolphin (BD).
Fabrication of temporary working platform as preparation for erection MD and BD.
Monitoring tools/consumables and equipment to maintain schedule to reach optimal daily
progress including monitoring wave/wind chart and actual weather condition.
Coordination with scaffolding/rigging supervisor and chief of mechanic/electric to assist the
Construction activities.

PROJECT COORDINATOR

PT.INDORAYA PERKASA

August 2011 - December 2011

subcontractor of PT.TOP GREAT ENGINEERING, T.Uncang, Batam
Mud Tank 1000HP & 1500HP Project, PERTAMINA
August 2011 up to December 2011
Scheduling and planning.
Preparation of working area in workshop.
Organizing supervisor to prepare all equipment, tools/consumables and other thing which can
support the construction progress.
Monitoring work progress in fabrication , assembly and erection of structure, piping and mechanical including leak test.
Daily activities report to client.
Preparation of progress report for monthly invoice.

5. SITE COORDINATOR
PT.INDO SUMMIT SEJAHTERA (Transerve group)
GORGON Project at Saipem Eni Australia
Location at PT.HANJUNG Lampung, Indonesia.

Barro island, Australia

February 2011 - April 2011

Monitoring all supervisors in fabrication and assembly of Jetty for Barro island, Australia.
Controlling progress accordance with weekly schedule.

6. PIPING ENGINEER
(Test Package Specialist)
PT.REKADAYA ELEKTRIKA
PLTU 2 x 7 MW , Tanjung Balai Karimun Kepri
October 2010 - January 2011
Prepare Test Package of Piping System for preparation of Hydro test and pneumatic test
And reviewing Piping and Instrument Diagram, Isometric, establish the contents of test package.
Line check to make sure the outstanding of material for each lines on site, scheduling of priority lines for test package, etc.

7. QA/QC INSPECTOR
PT.ASL MARINE
Bully Canister Project for Frontier Drilling,
Castoro Otto Repair for SAIPEM
Normand Clough Project
Dredger cutter section of DEME Project
Location on ASL Yard Tanjung Uncang-Batam Island
February 2009 - August 2010
Responsible for monitoring and inspection of pipe spools and structural, documentation and coordination with Client for final inspection.
Prepare and monitor Welder Test, running WPS, NDT Plan and prepare Manufacture Data
Record.

8. SENIOR QC INSPECTOR
PT.ROYSCAN ENGINEERING
Foster Wheeler project,
Located at PT.Rotary, T.Uncang- Batam Island

QC ENGINEER

SWIBER OFFSHORE CONSTRUCTION PTE LTD

(Owner Representative)
SWIBER OFFSHORE CONSTRUCTION PTE LTD
Graha Pena, Batam Center-Batam Island, Indonesia
I. Nu Coastal Accommodation Module
II. Spreader Bar for WHP Jacket Project of Conoco Phillips.
III. Submersible Conversion Launch Barge Project.
January 2008 up to July 2008

• Monitoring all quality and progress of project which is constructed by contractor.
• Review all documents related to QC Department:
Steel Structure, Piping, HVAC, Electrical, Insulation and Painting.
• Advise/assist contractor to solve any problem regarding construction activities.

11. SENIOR QC INSPECTOR
GLOBAL PROCESS SYSTEM PTE LTD
Sekupang-Batam Island, Indonesia
I. Maari Field Development Project

QC COORDINATOR

PT.NINDA PRATAMA VRIESINDO

September 2008 - December 2008

September 2008 - December 2008
Responsible for monitoring and inspection of pipe spools, documentation and coordination with Client for final inspection and release spools before sent to Singapore.

9. QC COORDINATOR
PT.NINDA PRATAMA VRIESINDO
Assigned to Saipem Eni Australia, Sekupang - Batam island
I. BP Tangguh Project for Refurbishment of Buoyancy Tanks.
II. Blacktip Project for Fabrication of Installation Aids:
- Intermediate Abandonment and Recovery head
- Laydown Head
- Pulling Head
- Temporary Pig launcher
- Flange Protector
- Arrow Head
- And Fabrication of New Buoyancy Tanks.

QC Inspectors

July 2008 - September 2008

for implementation of Specification and Procedures

The activities are consist of:

- Material Traceability, Fit up inspection, Visual inspection
- Monitoring NDT activities and reports
- Inspection of Hydrostatic Testing
- Coordination with Client and Third Party based on Inspection and Test plan
- Delegation of document control for collecting and organizing all inspection reports
- Establish the Manufacture Data Reports
- Submitting Daily Reports to Project Manager
- Internal and external meeting.

II.Montara Field Development Project

NDT Control

November 2006 - November 2007

Monitoring MODULE for Piping and Structural which include:
Prepare/Review Weld Map, Monitoring of Welding activities, Dimensional Control,
NDT Control, and Piping Spool fabrication/erection.
• Witness welder qualification test.
• Material Traceability Report, Structural and Piping Summary Sheet.
• Attending the Weekly/Monthly meeting with Client.

QC COORDINATOR

PT. YOOA

February 2006 - November 2006

• Preparation of Documents prior to replying the yard Questionnaire from Total E & I Indonesie as a qualification before starting fabrication and erection of Jacket and Platform.
• Preparation of project execution plan, work procedure, QC procedure which including in Quality Manual for Poleng Process Platform Project.
The client is Kodeco Energy Limited.
• Prepare fabrication procedure of steel structure of Low Density Polyethylene Project and scheduling. The owner is AMIR KABIR PETROCHEMICAL COMPANY, IRAN.
• To follow up bidding status for each potential Project.
• Establish Weld Map/NDT drawing of six legs Jacket.
• Project progress control, etc.

QC INSPECTOR

PT. INDOSAKTI MITRATAMA, Sub

May 2005 - February 2006

• Preparation of welder qualification test.
• Daily monitoring of steel structure fabrication and erection for MODULE R1 - R7
• To assist the construction manager in case of project progress control.

PIPING INSPECTOR

PT. NIPPON STEEL BATAM, Offshore

December 2004 - April 2005

• Review request for daily fit-up inspection.
• Ensure correct material that is supplied to fabrication activities.
• Visual inspection, NDT request, monitoring PWHT, controlling all inspection request/ report.
• Data input for history sheet prior to hydrostatic test, etc.

WELDING INSPECTOR

PT. SAMUDRA FERRO ENGINEERING

April 2004 - September 2004

Handling welder qualification test, NDE requirements, controlling welder
performance records, monitoring welding activities for pipe spools fabrication in work
shop.
• Attending the weekly meeting with client "PT.PUPUK KUJANG".

PIPING DESIGNER

PT. MITSUBISHI CHEMICAL ENGINEERING INDONESIA

December 2002 - March 2004

• The establish of a Drawing Office to work on maintenance shut-down by Bakrie Kasei.
• General pipe work design and detail design of internal pipe work and fitting.
• Site modification, re design of pipe work areas, include material handling.

17. QC INSPECTOR
PT. TRUBA JURONG ENGINEERING
Phase "A" Field Development,
Separator Project Exxon Mobil Oil Inc-Nangroe Aceh Darussalam
August 2002 up to November 2002

• Monitoring welding activities and piping progress.
• Request RT, PT, PWHT and monitoring rejection rate.
• Interpret RT Film together with Client and NDE company.
• Preparation of test packages.
• Monitoring hydrostatic testing.
• Preparation of hand over package for client " Exxon Mobil Oil Indonesia".
• Preparation of Manufacture Data Report (MDR).

DRAFTER

PT. IMAGIN TEKNIK KOJI

May 2001 - September 2001

• Field check, design piping & structure for shut down maintenance.
• To make revision drawing of Structure and arrangement drawing including P&ID.
• To make Piping Isometric Drawing.
• Preparation of Material Take Off.

PIPING QC

PT. GOODRICH ENGINEERING INDONESIA

July 1999 - October 1999

• Fit-up inspection for stainless steel pipe.
• Make sure all project requirements are achieved before spool released for Foster Wheeler as Client.

20. QUALITY CONTROL
PT. REKAYASA INDUSTRI
Geothermal Project
Pengalengan, West Java
November 1998 up to February 1999

• Daily welding report, Punch list, line check/tracing heat number.
• Preparing test package for hydrostatic testing.

21. WELDING INSPECTOR
TOYO ENGINEERING CORPORATION
Paiton Private Power Project Phase I
Paiton, Probolinggo - East Java

To witness

DAELIM INDUSTRIAL Co. Ltd

January 1998 - June 1998

Welder Qualification Test , Dye Penetrant Test.
• Monitoring Preheating , Post Weld Heat Treatment for heavy wall pipe.
• Inspection for Magnetic Particle Identification, fit-up for material of P8 and alloy steel.
• Visual Inspection of welding joints and ducting.
• All the above activities based on Daily Inspection Schedule.

22. WELDING INSPECTOR
DAELIM INDUSTRIAL Co. Ltd.
Olefins and Offsite and Utilities Project

Monitoring welder

Tuban Petrochemical Complex

October 1997 - December 1997

training prior to WQT.
• Monitoring Piping and Welding activities.
• To Prepare History Sheet/Daily Data Input
• To Witness Hydrostatic Testing of Underground Piping.

QC SUPERVISOR

Tifico - PSF Tangerang Project

June 1997 - September 1997

• Carry out visual inspection of welding joints, dye penetrant test.
• Supervise repairing of joints, fit-up inspection.
• Review Daily Welding Report, Visual Inspection, Controlling of NDT Requirements, Controlling of repair rate.

24. PIPING INSPECTOR (Owner Representative)
PT. POLYPRIMA KARYA REKSA
PTA Project, Anyer - West Java
August 1996 up to June 1997

• Monitoring all daily piping construction activities based on specification supported with piping in progress inspection check list.
• Fit-up inspection for High Hazard line.
• To take sample of material for mechanical test.
• Review test package, line checking for punch list.

WELDING INSPECTOR

PT. MESITECH MITRA PURNA BANGUN

• Monitoring welder activities as per WPS requirement.
• Monitoring NDT activities.
• Review Daily Welding Report.

PIPING SUPERVISOR

ABS Project

January 1996 - May 1996

• Assist subcontractor to perform piping construction activities accordance with project schedule.
• Line check for punch list.
• Review Test Package.
• Supervise Hydrostatic test.

PIPING INSPECTOR

PT. JAYA KENCANA

January 1995 - June 1995

• Ensure the correct material for fabrication of stainless steel and carbon steel pipe.
• Inspection of Fit-up for piping in workshop.
• Ensure all spools can be released for painting.

QC WELDING INSPECTOR

CAPC Project

December 1993 - December 1994

• Witness Welder Qualification Test, Fit-up Inspection, monitoring Preheating and Post Weld Heat Treatment, Inspection of Dye Penetrant Test, Hardness test, Visual Inspection for welding.
• Monitoring all welding activities for various material such as Duplex, Alloy steel especially for Cracking area of Cross Over and Radiant Coil.

29. PIPE FITTER
PT. KOMARITIM
Maxus Maintenance Service
Pabelokan Island and Widuri Process Platform (Offshore)
July 1993 up to August 1993

• Pipe spools and support fabrication.
• Pipe spools and supports installation on platform.
• To carry out the Hydrostatic testing.

PIPE FITTER

PTA Plant Project

January 1993 - April 1993

• Piping fabrication.
• Piping installation
• Support fabrication

31. PIPE FITTER
PT. BINA KOSNTRINDO NUSA JAYA
Gema sembrown, Sunda Straits
Fabrication Yard, Anyer - West Java
October 1992 up to December 1992

• Steel structure fabrication.
• Structure installation to UNOCAL 76 platform
• Pipe spools installation to platform.


I am awarded that statement mentioned above are true

Mobile: +62812-76913459

Projects

aplng

now i am testing engineer

Qualifications & Certifications

Education

Senior High School

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Supported Countries
Choose your country

×