Services

Outside Plant Engineering In Telecom, Surveying ,Fiber Optic Knowledge

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Summary:

Once the Housing diagram received from the concerned municipality where the network is to be constructed ,survey the nearest main route from the point of presence from where the network will be extended to complete the requirements of the client .during the time of survey point out each and every requirement which is to be executed to complete the execution of job in an proficient manner,for example high directional drilling, thrustboring, 2 ways , trenching etc and submit the survey to the higher authority for suggestions.once the higher authority is satisfied with the details they will forward it to the design department for preparing ready engineering document(RED binder) which to be submitted to the client for approval.once the client approved the RED then the PRO team will apply for permission where the work is going to be executed.

Work History

OSP SUPERVISOR

OMAN FIBER OPTIC CO.SAOG

From July 2013

Working as an osp supervisor currently handling projects for omantel FTTH

OSP INSPECTOR

Detacon Al saudia Telecommunication Limited

June 2009 - June 2012

Worked as an osp inspector in implementation department for MOBILY FTTB, FTTH,METRO,LDN projects in JEDDAH western region,

FIELD ENGINEER

KAL CABLES PRIVATE LIMITED CHENNAI

June 2008 - June 2009

Project: COMMUNICATION ANTENNA TELEVISION SYSTEM(CATV)

DUTIES AND RESPONSIBILITIES:
.
- Surveying the route with the contractor to expand the fiber network
- Lead in site changes on plan against in actual implementation and endorse to our Engineering for approval after survey is completed.
- Coordination with our subcontractor and Site Acquisitions personnel in terms of ROW problems..
- Lead in Preliminary Acceptance in Civil and Electrical testing and monitor clearing such as rectification of punch list if deficiencies are complied and submit for request for inspection with clients for their approval.
- Lead in PAC in works acceptance checklist and conducting testing of equipment inside indoor/Outdoor cabin such as Insulation test, voltage test and grounding earth system testing for Civil works and insure that will comply on the require passing data and witnessed by the client.
- Coordinate all rectification works based on the checklist given and inspection and provide photo to be submit to the FO representatives for signing and approval.
- Prepare all documents with respective via checklist binders as required prior to submission on PAC.
- Coordinate all respective subcontractors in submission of PAC scheduling by tracking down each site upon submitting each rectification photo and forward it to our clients for FAT clearing scheduling.
- Direct monitoring / to liaise project site clearing of punch list per site in Civil works with subcontractors and coordinate the date scheduling and upon confirmation of customer for FAT punch list site clearing.

ASSISTANT SITE INCHARGE

EMIRATES PETROLEUM PRODUCT OIL CORPORATION

November 2006 - May 2008

DUTIES & RESPONSIBILITIES
• Monitoring of site sales activities
• Preparing all the data sheets after finishing the shifts
• handing over the amount to the manger
• preparing of shift schedules to the staffs
• surveying the stocks remaining and placing the order for the required materials

OSP SUPERVISOR

SUMANGALI CABLE VISION

October 2004 - November 2006

Project: fiber expansion project

Qualifications & Certifications

DHARMAMURTHY RAO BAHADUR CALAVALA CUNNAN CHETTY'S HIGhEr SECONDARY SCHOOL CHENNAI

AALIM MUHAMMED SALEGH POLYTECHNIC Chennai

electronics &communication

aalim Mohammed salegh polytechnic Chennai

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?