Having Experience of 30yrs in civil construction work in Jaypee group.

Work History

Senior Project Engineer (Shift In charge) Civil

Jai Parkash Associates Limited

February 2001 - March 2008

who is appointed as Contractor in Civil works and Hydro-Mechanical Equipment in Baglihar Hydro-Electric Project (J&K).

Notable Highlights:
❑ Project Details:

• Baglihar Hydro-Electric Project is conceived to harness a part of vast hydro-electric potential of river Chenab in the state of Jammu & Kashmir.

• The Project comprises construction of a 143.00mt high concrete gravity Dam with an Intake structure for delivering the water to an underground power station of 3 x 150 MW through a head race tunnel of 10.50m circular diameter, 2.07 km in length, 85m high surge shaft, three numbers pressure shafts, power house complex consisting of 3 cavities for housing turbines and generating equipment, one for transformer and one for collection gallery. A huge quantity of 24 lacs cum of concrete will be required for construction of various works of the project.

Client: Jammu And Kashmir State Power Development Corporation
Consultant: Lahmeyer International GmbH, Germany who is appointed as
Engineer In-charge for Design and Engineering in civil works.
Contractors: Jaiprakash Associates Ltd.


• Supervision for all kinds of civil and underground works at Dam and Powerhouse sites including grouting works and treatments of cavities and shear zone for tunnels.

• Civil assignments with Geo-technical as well as geological supervision including support design/ installation of instruments in three underground caverns, power house cavities, mass concreting and preparation for the reinforcement works etc.
• Responsible for quality of concrete, cement, fine and coarse aggregate, admixtures, shotcrete, grouting etc. I also witness the routine testing of compressive strengths of concrete, cement and cores of the concrete and shotcrete.

• Our supervision also includes the site inspection before the commencement of the dam lift concrete, checking of reinforcement and its disposition, checking of the alignments of various dam structures like dam galleries, abutment galleries, staircase...

Project Manager

Jaiprakash Associates Ltd

May 1997 - January 2001

Project: Dulhasti Hydro Electric Project (J & K)
Client: N.H.P.C.

Notable Highlights:
❑ Project:

• Dul Hasti Hydro-Electric Project is conceived to harness a part of vast hydroelectric potential of river Chenab in the state of Jammu & Kashmir.

• The Project comprises construction of a 71.00mt high concrete gravity Dam with an Intake structure for delivering the water to an underground power station of 3 x 130 MW through a head race tunnel of 7.30m circular diameter, 10.568 km in length, 95m high surge shaft, One number pressure shafts, Francis turbines and generating equipment, A huge quantity of 7.5 lacs cum of concrete will be required for construction of various works of the project.

❑ Duties and Responsibilities

• Billing In Charge responsible for Prepared of company bill and summit to N.H.P.C., Measurement & Payment, Extra Item, Escalation, Coordination with client and site Engineer, total project value 735 crores.

• Supervision of structural work like Dam, Power Intake, Head Race Tunnel, Desalting Basin etc.

• Verification of the Interim payment certificate prepared by the contractor for our respective sections as per approved drawings, specifications, and B.O.Q and contract agreement.

Resident Engineer

Jaiprakash Associates Ltd

June 1989 - May 1997

Project: Narmada Project
Client: Gujarat Government


Notable Highlights:
❑ Project:

• Sardar Sarover Hydro Electric Project is conceived to harness a part of vast hydro-electric potential of river Narmada in the state of Gujarat.
• The Project comprises construction of a 141.50mt high concrete gravity Dam with an Intake structure for delivering the water to an underground power station of 6 x 200 MW through a head race tunnel. Contract value 320 crores. Also situated there 250 M.W. Open ground Power House and Dam delivering of water through Penstocks to an open ground power station 5 x 50 MW.

❑ Duties and Responsibilities:

• Supervising the Main work, Contractor's work; ensuring conformity of work with Specifications; knowing thoroughly the Specifications requirements for the work being supervised; preparing the measurement books.
• We were also responsible for the verification of the interim payment certificate prepared by the contractor for our respective sites as per specifications, contract agreement, approved drawings and B.O.Q.
• Supervision of Site work like Reinforcement, Concreting, Embedded parts, and all embedded items related in dam blocks.
• Various activities involved were Grouting, Drilling, Rock bolting, Anchoring, plugging, Diversion, cofferdam etc.

Jaiprakash Associate

Construction Ltd

September 1987 - June 1989

Designation: Field Engineer
Client: Uttar Pradesh Govt.
Project: Lakhwar Hydro Electric Project

Notable Highlights:
❑ Duties and Responsibilities:

• Supervising the Contractor's work; ensuring conformity of work with Specifications; knowing thoroughly the Specifications requirements for the work being supervised; preparing the measurement books; keeping a daily diary giving the following information, weather conditions, location and type of work, work planned and achieved, reasons for delay or disruption, plant, labor and supervision, and other items relevant to the Contractor's performance and rate of progress.
• We were also responsible for the verification of the interim payment certificate prepared by the contractor for our respective sites as per specifications, contract agreement, approved drawings and B.O.Q.
• Supervision of Site work like Project Roads, Camp Construction, Retaining Walls, Drainage System of Road etc.
• Various activities involved were Construction of Road, Camp Building, Drains, Store Central Workshop, Annapurna (Mess), Field Hostels etc.

civil contractor

Self Employed

February 1985 - August 1987

in the Municipal Corporation of Jhansi (U.P.) there are a W.B.M. Road and concrete links road in new developed area, Drainage system, Water supply work.

Junior Engineer

Deisnation

May 1984 - January 1985

Client: P.W.D. Department (Govt. of Arunachal Pradesh)

Notable Highlights:
❑ Duties and Responsibilities:

Supervision of works, Construction of Road, Building & Water supply work, maintenance of High ways & Links road also. Prepared of measurement book and preparation of contractor's bill.

Junior Engineer

Jaiprakash Associate Pvt. Ltd

April 1983 - May 1984

Client: Gujarat Govt.
Project: Lakhwar Hydro Electric Project

Notable Highlights:
❑ Duties and Responsibilities:

Rock fill dam & Link Channel

Responsible for Execution of all the site work like Surveying, Planning, Excavation of channel, Labor planning Site management, coordination with client, preparation of sub contractor bill etc.

• Responsible for preparation of PRWs and Sub-Contractor's bills as per work orders issued by the Management and get the same approved from the Management for the final payment.
• Dealing with Client/Consultant for day to day work programme. Carry out joint measurements at site with Client/Consultant and preparation of the measurements for the claim.

• Prepare Daily Progress Report with all aspects. Prepare Weekly & Monthly Programme and deployment of manpower & resources as per programme to achieve the targets well in time.

Projects

Yamuna Express Way Mathura

having 5yrs exp.in construction of Expressway.

Qualifications & Certifications

Diploma in Civil Engineering

Diploma

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?