Harish - STLC - Bangalore, KA, India

Niveditha Harish

Bangalore, KA, India

Services

STLC

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Work History

BTS - Transport Test Engineer

Client - Nokia Siemens

From June 2011

June 2011 - Present
Nokia Siemens Networks specializes in mobile broadband. It operates at the forefront of each generation of mobile technology from GSM to LTE. Flexi Transport module (FTM) is the transport module of NSN 3G BTS. The basic functionality of the product is call processing and sending, receiving and forwarding of Data and voice Traffic. Flexi Transport module provides the physical Iub interface towards the Radio Network Controller (RNC). The Iub interface towards RNC shall be Ethernet, PDH (E1/T1) or Flexbus.

Roles and Responsibilities: (Project Engineer)
Value addition -
➢ Improvement in the quality of manual testing by conducting brain storming
➢ Escape Defect Analysis done to reduce the number of defects raised by the competitive teams
➢ Test case allotment to the team by careful selection in defect prone areas

Other roles -
➢ Involved in new feature discussion with the team and the clients for understanding of business requirements.
➢ Requirement Mapping.
➢ Preparation of test strategy
➢ Writing of test cases from the requirement documents received from client.
➢ Peer test case reviews
➢ Creation of the test environment for the test case execution.
➢ Baseline up gradation on Unix platform.
➢ Regression testing for the features.
➢ End to end testing of the BTS and the RF module.
➢ Usage of Unix commands in each feature testing.
➢ Verification of system components namely hardware, software and communications; are capable of performing under expected normal conditions as well as under possible abnormal conditions.
➢ Stability tests and performance tests for Operational and Maintenance purposes.
➢ Verification of the software, to be easily installed in the live environment.
➢ CR modification and execution.
➢ Revision of the existing test cases in order to modify according to the present conditions and ensure completeness.
➢ Tracking and Verification of the defects till the closure.
➢ Root cause analysis for the defects.
➢ Preparation of metric...

Projects

Manual Testing

 Improvement in the quality of manual testing by conducting brain storming
 Escape Defect Analysis done to reduce the number of defects raised by the competitive teams
 Test case allotment to the team by careful selection in defect prone areas

Qualifications & Certifications

Information Science and Engineering

Don Bosco Institute of Technology

VVS Sardar Patel High School

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?