Narayanasamy - Cswip 3.1 Welding Inspector - Rakkiyapalayam, Avinashi, Tamil Nadu 641663, India

Nirmal Kumar Narayanasamy

Rakkiyapalayam, Avinashi, Tamil Nadu 641663, India

Services

Cswip 3.1 Welding Inspector

Summary:

WPS Preparation, Welder Qualification, Welding Qualification, Welder performance analysis, new welding process training and implementation

Work History

Project QA/QC In-charge

Mechanical Contracting and Services Company W.L.L.

August 2011 - August 2011

Organization : Mechanical Contracting and Services
Company W.L.L Bahrain
Present Position : Project QA/QC In-charge
Period : Aug 2011 to Still
Projects : Banagas Compressor Station (CS9),
Tatweer Pipelines for Rental Compressor
Phase II, Tatweer Phase II Compression
Project
Client : Banagas, Tatweer Petroleum, Exterran

Jobs Responsibilities

 Works as a Project QA/QC In-charge Responsibilities include preparation and implementation of Project Quality Plans, Inspection Test Plans for each activities and Establishing NDE procedures, Welding Procedure Specifications, Conducting Procedure qualification Test (PQR Test), Qualifying Welders

 Coordinating and Ensuring stage inspections for all the process activities as Material Receiving inspection, fabrication of piping and structural steel at various stages including fit-up, welding visual, painting, hydro testing, pneumatic testing etc.

 Coordinating and Ensuring stage inspections for all Civil activities with discipline Inspector

 Review and Approve the Subcontractor Procedures like NDT Procedure, PWHT procedure etc.,

 Coordinating all the Non-destructive testing and PWHT activities

 Coordinate with Client/Third party Inspection for stage wise inspection as per Inspection test plan.

 Monitor and control the welder performance and Welding repair rate, taking necessary action to reduce the repair rate.

 Liaise with project personnel in taking appropriate corrective and preventive action for non- conformance’s identified in the company.

 Preparation of Hydro test packs and reviews of the same before releasing for Hydro Test.

 Preparation of quality control dossiers upon completion of all the project activities.

QC Engineer

Bonace Engineers Pvt LTd

April 2011 - May 2011

II.Organization : Bonace Engineering-Mumbai
Position : QA/QC Engineer
Period : April 2011 to May 2011
Project : Reliance Petro Chemical Plant-
Patalganga Shutdown Work
Client : Reliance Petro Chemical

Jobs Responsibilities

 Conducting Welder Performance Test as per international code and project requirement (codes like ASME, ISO, and AWS).

 Reviewing of fabrication drawings.

 Conducting stage wise inspection like edge preparation, Fit up, inspection during/after welding and preparing relevant inspection documents.

 Performing weld audits during welding to confirm the parameters as per relevant WPS.

 After Visual Inspection, organizing for NDT, PWHT as per the Project & Drawing requirement.

 Evaluation and interpretation of NDT techniques (LPI, UT, RT and MPI).

 Visual inspection of Column, Heat exchanger, Vessel,
Tanks.

 Witnessing Thickness Survey of Column, Heat exchanger, Vessel, Storage Tanks.

 Witnessing Hydro test of Heat Exchanger, Vessels, and Storage Tanks.

QC Engineer

Interface Technical Inspection

February 2008 - January 2011

III.Organization : Interface Technical Inspection
services, Dubai , UAE
Position : QC Engineer
Period : Feb 2008 to Feb 2011

Clients

1. Lamprell Energy Ltd - Dubai from Feb 2008 to December 2008 and March 2010 to Jan 2011

Project Involved

 Livorno Top Side Modules (LNG Offshore Topside Modules) – OLT & Saipem

 Frade Topside Modules – SBM

 FPSO Ocean Modules – Chevron

 Olowi FPSO Modules - SBM

 Seajack - self propelled jack up vessel - Chevron

2. Gulf Spic – Fujairah from Feb 2009 to Aug 2009

Project Involved

 Fujairah – F2 new build Power Plant for Fujairah Government / ALSTOM

3. AST Overseas – Murray Roberts JV

Project Involved

 ADCOP Offshore Pipeline Facility from Aug 2009 to Nov
2009. This is a Sub Marine Cross Country Pipeline Project for ADCOP.

4. Maritime Industrial Services - Sharjah

Project Involved

 New Build offshore Drilling Rigs for Nobel Denton from Nov 2009 to Mar2010.

Jobs Responsibilities

 Conducting stage wise inspection like edge preparation,
Fit up, inspection during/after welding and preparing relevant inspection documents.

 Performing weld audits during welding to confirm the
parameters as per relevant WPS.

 After Visual Inspection, organizing for NDT, Post Weld heat Treatment as per the Drawing requirement.

 Evaluation and interpretation of NDT techniques (LPI, UT, RT and MPI).

 Conduct Line walk and Reinstatement for pipeline and conform to Drawing requirement.

 Co-ordinate and organize with Third party and Project Client for stage wise inspection and approval.

 Preparation of final document as per the Quality control Plan and organizing for approval from the Client/Third party inspection agency.

qc engineer

Lamprell

January 2008 - January 2008

Piping Line walk and reinstatement and test pack coordination and completion,

QC Engineer

Yogashri Heavy Engg (P) Ltd

July 2003 - February 2008

IV. Organization : Yogashri Heavy Engg (P) Ltd, Hosur,
India – 635126
Position : QC Engineer
Period : July 2003 to Feb 2008

Major Project involved
 Separator for BHEL- Hyderabad,
 Furnace Shutdown Gate for BHEL-Ranipet
 Dished End and Pressure Vessel for L&T Powai, L&T Kanchipuram
 Pressure Vessel for ISRO Through Venkateshwara Hi-tech Engg.,
 CM Tripper 20000 Ton for Nayveli Lignite Corporation of India- Thyssen Krupp
 Equipment like Extractor, Toaster, Dryer, Cooler for Desmet Chemfood Engg
 Tobacco Dryer for Indian Tobacco Company

Jobs Responsibilities

 Reviewing of fabrication and machining drawings.

 Preparation of Quality Control Plan for Drawing/Client
requirement and coordinating for approval with Client/Third Party Inspection agency.

 Preparation of Welding Procedure Specification (WPS), conducting PQR test and Welder qualification test (WQT) as per Drawing Requirement and respective codes like ASME, ISO, AWS

 Inspection of incoming material, co-relate with Mill test certificates and conforming to International Standard

 Preparation of Cutting plans as per drawing requirement.

 Conducting stage wise inspection like edge preparation, fit up, inspection before, during/after welding and preparing stage wise inspection document.

 Performing Weld audits to confirm the parameters as per relevant WPS.

 After Visual Inspection, organizing for NDT, Post welds heat Treatment as per the Drawing requirement.

 Evaluation and interpretation of NDT techniques (LPI, UT, RT and MPI).

 Organizing Periodic calibration of Measuring instrument and gauges.

 Conducting Pneumatic testing and Hydro testing as per drawing requirement.

 Preparation of final document as per the Quality control Plan and organizing for approval from the Client/Third party inspection agency.

Qualifications & Certifications

Bachelor of Engineering in Mechanical

Tamilnadu College of Engineering, Bharathiyar University, Coimbatore

THSS Avinashi

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?