Damle - Remote Sensing - Jabalpur, MP, India

Niranjan Damle

Jabalpur, MP, India

Services

Remote Sensing

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Summary:

Remote Sensing & GIS

Work History

Assistant Professor

Department of Civil Engineering

From August 2011

with Gayn Ganga
College of Technology, Jabalpur
Gyan Ganga College of Technology is pioneer engineering college in jabalpur.

Team Leader / Technical Support

Gorakhpur Nagar Nigam, Uttar Pradesh

December 2009 - March 2010

Title: Property survey and conversion of Land base data to GIS Platform for Tax Collection Gorakhpur Nagar Nigam, Utter Pradesh, India.
Client: Gorakhpur Nagar Nigam, Uttar Pradesh Duration: Dec'09 - Mar'10
Role: Team Leader / Technical Support Team Size: 18
Technologies: AutoCAD Map, Micro station V7, Geomedia 6.1
Summary: The project involved creating 1:1000 s Land base maps with major themes like Streets, lanes, buildings and other relevant features for GIS, Tax collection system for Gorakhpur Nagar Nigam using IKONOS data.
Responsibilities: Handling the team with all Technical and administrative support.
Achievements: Successfully delivered the Land base data of GNN.

Team Leader/Technical Support

EON

July 2008 - December 2009

Team Size: 15
Technologies: Micro station V7, Small World
Summary: The project involved creating one GIS asset data model for Central Networks by capturing the varying West data sources into the East's version of GE Small World and realigning it to Ordnance Surveys Master Map Topography Layer and providing a means of cross referencing to the existing network connectivity model. The West Electrical network data will be captured from Composite Main Records (CMR) and supplementary FRAMME Models into the GE Small World GIS data format. Backlog updates that are formed due to the freeze of data for the conversion will also be carried out .Scope also include adjusting the geographical position of the CMRs against the new Ordnance Survey Master Map Topography mapping prior to conversion to meet E.ON's Positional Accuracy Improvement plan (PAI).
Responsibilities: Handling the team with all Technical and administrative support.
Achievements: Successfully delivered around 4 Batches of Data to EON Central Networks U.K.

Management Associate

ROLTA India Ltd

April 2007 - September 2011

Mumbai
ROLTA is one of the largest GIS installations in Asia has qualified staff and management team. ROLTA has provided GIS mapping conversion services for over 20 countries with multi-million dollar projects executed around the world. As a CMM-L5 and ISO9000 and ISO27005 certified company, any product developed by ROLTA goes through a number of specified graded steps or cycles.

Team Leader/Technical Support

EON

September 2007 - July 2008

Team Size: 25
Technologies: Small World
Summary: Electrical Utility GIS Data of EON (East) is to be realigned according to their new land Base in Small World. The East geographic data will be re-positioned against the new Ordnance Survey Master Map Topography mapping which has been processed and adjusted for PAI. The relationship and alignment of dimension features must be maintained although a set of standards and rules.
Responsibilities: Handling the team with all Technical and administrative support.
Achievements: Successfully delivered around 20 Batches of Data to EON Central Networks U.K.

Team Leader/Technical Support

Department of Settlements, Revenue & Land Records Government of Mizoram, India

April 2007 - September 2007

Title: DLRS Mizoram GIS Data Base Creation Duration: Apr'07 - Sep'07
Client: Department of Settlements, Revenue & Land Records Government of Mizoram, India.
Role: Team Leader/Technical Support Team Size: 20
Technologies: Micro station 7, Geomedia 6.1, Arc GIS 9.1.
Summary: The project is part of DLRS Mizoram GIS programme. GIS database creation for Base Map with help of SOI Toposheests, Contour mapping at 10m intervals, Image Interpretation for natural resources like Inland water bodies (Static-Ponds, Reservoirs, Lakes) , Inland water bodies Dynamic-Perennial / seasonal streams, River), Land use/Land cover mapping using high-resolution Quick Bird Satellite data. Micro Station is used for data capture and Base map creation then Data Geomedia 6.1 is used for data Migration on 1:2000 Scale.
Responsibilities: Handling the team with all Technical Support and administrative support.
Achievements: Successfully delivered around 1000 Sq.M Area.

At DHV India (P) Ltd., New Delhi

GIS Specialist

DHV India (P) Ltd

October 2005 - March 2007

New Delhi
A premier engineering consultancy firm providing cutting-edge services and sustainable solutions across Water & Sanitation, Transportation, Infrastructure (Aviation & ITS), Irrigation & Water Management and Spatial Planning & Urban Development. A wholly owned subsidiary of the DHV Group of Companies, which is amongst the top 5 consulting firms (in aviation sector) and amongst the top 10 (in water sector) in the world and operates in more than 75 countries.

GIS Specialist

Utter Pradesh Irrigation Department & World Bank

November 2005 - March 2007

Title: Project Management & Monitoring Information System for U.P Irrigation Department "World Bank" Funded Project
Client: Utter Pradesh Irrigation Department & World Bank Duration: Nov'05 - Mar'07
Role: GIS Specialist Team Size: 3
Technologies: Arc View GIS 9.1, Arc IMS 9.1, Arc SDE 9.1. AutoCAD Map 6, MapInfo, Arc Info.
Summary: The project is part of World Bank-Uttar Pradesh Water Sector Restructuring Project (UPWSRP) and is being developed for UP Irrigation Department to manage the different project activities & monitor the progress time to time. This project is part of the project activates performed in U.P irrigation Department. The project will include planning, scheduling & budgeting of activities, allocation of responsibilities and update & monitor the status of activities. Different Social, Environmental, Agricultural, Economical & Irrigation related parameters will also be monitored through the system. In addition to this a GIS Web based System is also being developed for Executive of PACT (Project Activities Core Team) part of UP Irrigation Department, to view different type of maps and quarries to control & monitor project progress. As well as to see the impact of rehabilitation programme implemented for domains through Key performance Indicators identified for progress monitoring.
Responsibilities: Preparation of Inspection Report, Requirement gathering, System Requirement Study & Specification, Detailed Design Document preparation for GIS & GIS Database Design and creation, Preparation of Thematic Maps for representation of different Key Performance indicators.
Achievements: Successfully Digitised and created different base maps to represent the Key Performance Indicators on the base maps.

At Indian Resources Information and Management Technologies Ltd.

Handled project on Remote Sensing and GIS domain.
Managing Project on different fronts as middle Level Manager.
Requirement gathering / analysis, Field Investigation, Logistic Support.
Tender...

Team Lead/ Project Lead

Gas Authority of India Ltd

December 2004 - October 2005

Responsibilities: As a project lead I have to support to my team to gather different NOC's
Achievements: Successfully 300 NOC from different t Departments of central & state government.

Team Lead/ Project Lead

Geological Survey of India

December 2004 - October 2005

Bhopal, Jabalpur, And Raipur Duration: Dec'04 - Oct'05
Role: Team Lead/ Project Lead Team Size: 5
Technologies: Arc View GIS, MS Excel, Ms Word, Ms Access, AutoCAD Map 6
Summary: The GIS Database is being created to keep a record of geological mapping done on 1:50,000 scale in Geological Survey Of India By Different Geologist and preparing Geodatabases and integrating them for web based GIS system to publish & sale the maps on internet for GSI future requirement.
Responsibilities: Scanning of Geological maps and Survey of India Top sheet, Digitization, Geo-referencing, Attribute Attachment, Edge matching, Map Composition.
Achievements: Successfully digitised and completed 120 geological maps & Survey of India Top sheets.

Project Lead, Material Engineer, Geologist

Madhya Pradesh Rural Road Authority

Duration: 2002-2005
Role: Project Lead, Material Engineer, Geologist Team Size: 15
Technologies: Arc View GIS, Auto Plotter, Auto CAD Map 6, MS Excel, Ms Word.
Summary: The Pradhan Mantri Gram Sadak Yojana (PMGSY) was launched by the Govt. of India to provide connectivity to unconnected rural Habitations as part of a poverty reduction strategy. Government of India is endeavouring to set high and uniform technical and management standards and facilitating policy development and planning at State level in order to ensure sustainable management of the rural roads network.
Responsibilities: Transit Walk, First Stage Report, Soil Sample Collection, Laboratory Tests for Soil Analysis, Topographical Survey, Survey Data Analysis and preparation for detailed estimation and report Generation, Printing and Submission, Field Verification.
Achievements: Successfully finished the detailed project report for 1500 Kms. in different districts of Madhya Pradesh.

Team Lead, Resource Scientist

Tata Chemicals Ltd

Team Size: 10
Technologies: Arc View GIS, MS Excel, Ms Word, AutoCAD Map 2
Summary: GIS are computerised systems that record, store, analyse and produce maps and geographic products based on information obtained from different sources. These help farmers adapt quickly to changing conditions. The result: healthier crops, higher yields and enhanced incomes for farmers. Using GIS to maximise profits. The precision-farming project leverages satellite and information technology to serve the needs of Indian farmers. The operation involves combining satellite maps, census data, and socioeconomic and other data collected within the GIS to create a valuable agricultural database .Information and the spatial data generated by the GIS facility are correlated with socioeconomic information, such as the name of the owner of a plot, the crop grown on it, the number of members in the family, the family's level of education, its annual income, and so on. Both raw and processed data are fed into the GIS, which then becomes the basis for providing quality decision-support for the agronomy services.
Responsibilities: Digitized around 100 Village Cadastral maps and attributes attachment, Edge matching, Map Composition etc.
Achievements: Successfully digitised completed about 100 Village Cadastral maps of U.P.

At National Centre for Human Settlements & Environment, Bhopal

Remote Sensing Scientist & Field Investigator

The Integrated Watershed Development Programme

Jhabua District, Madhya Pradesh
Client: The Integrated Watershed Development Programme Duration: 2002-2003
Role: Remote Sensing Scientist & Field Investigator Team Size: 5
Technologies: Visual Interpretation of Satellite Imageries, Arc View GIS, MS Excel/Word, AutoCAD Map.
Summary: Two small watersheds - once densely forested - in central Jhabua District, in western Madhya Pradesh, adjacent to Gujarat and to Rajasthan. Large-scale deforestation caused severe effects in the ecosystem, climate and populations. Widespread soil erosion, overgrazing and inappropriate land use resulting in barren landscapes. Breakdown of self-sufficient autonomous lifestyles with forest clearance; Seasonal migration of men in search of employment. Development of an integrated approach to the problems based on community needs. Protected afforestation on community land. Distribution of seedlings to encourage planting on private land. Soil and water conservation. Pasture improvement through planting pasture grasses. Water harvesting. Distribution of subsidised fuel and energy saving devices. Integration of land-use innovations with measures to improve community livelihoods. Promotion of alternative income generating activities to reduce poverty and discourage seasonal migration.
Responsibilities: Digitization relevant Toto sheets of Survey of India, Preparation of Different Thematic Maps such as Geological Map, Geomorphologic map, Structural Map Hydrogeomorlogical, Land Use/ Land Cover Map, Slope Map, Drainage Map, map, based on Visual interpretation of relevant Remote Sensing Satellite data & GIS Database creation for Watershed in District of Jhabua (M.P). On the basis of these maps and database watershed characterisation and decision on various aspect was taken to improve the conditions of watersheds.
Achievements: Successfully completed given assignment.

Resource Scientist

Indian Resources Information and Management

August 2000 - October 2005

Technologies Ltd., Bhopal
The organisation has been established to offer high quality services relating to all aspects of environment, encompassing the subsystems of land, water, air and vegetation. It is equipped with sophisticated infrastructure to carry out ground surveys, laboratory analyses, in situ quality estimation of soil, water, and ambient air, photogrammetric measurements, aerial photo-interpretation and Satellite remote sensing application in visual and digital modes and (GIS).

Investigator

National Centre for Human Settlements

August 2000 - October 2005

Environment, Bhopal
NCHSE was established to act as a nodal centre for applied research in global field of human settlements and their interaction with the environment.

Team Lead, Resource Scientist

IN-RIMT, Hydrabad, Bhopal

Hyderabad Duration: 2000-2001
Role: Team Lead, Resource Scientist Team Size: 6
Technologies: Arc View GIS, Auto CAD Map 6, MS Excel, Ms Word, Ms Access.
Summary: Project is a national mission with an objective of creating scientific database for ground water using remote sensing technology. Involved in the generation of ground water prospect maps at 1:50,000 scale for the state of Madhya Pradesh.
Responsibilities: Visual interpretation of Imageries for Geological maps, Geomorphologic maps, Hydrological maps, Structural Maps, Hydrogeological maps, Field investigation, Field data Collection, Secondary data incorporation, Digitization of thematic maps, GIS database creation. To take maps for quality checking, Finalization of maps, Printing etc.
Achievements: Successfully completed 25 sheets.

Team Lead, Resource Scientist

District Rural Development Authority

Raisen M.P Duration: 2000-2001
Role: Team Lead, Resource Scientist Team Size: 6
Technologies: Arc View GIS, MS Excel, Ms Word.
Summary: For Community Betterment, Make Better Environment. The mission has attempted to integrate the concerns of poverty reduction and environment regeneration through a strategy of participatory watershed management. Mission has been premised on the understanding that the livelihood security crisis that people faced in environmentally degraded lands was the result of a distortion in the relationship between people and their natural resource base. It has recognised that techno centric regeneration programmes that visualised picture post-card environmental changes were unrealistic and instead transformation could be worked only by strategies that addressed people's livelihood concerns. Therefore Mission has adopted direct participation by the people as a key strategy.
Responsibilities: Visual interpretation of Imageries for Geological maps, Geomorphologic maps, Hydrological maps, Structural Maps, Hydrogeological maps, Forest maps, Field investigation, Field data Collection, Secondary data incorporation, Digitization of thematic maps, Digitization of mazmuli Maps, Village cadastral maps, Merging different Scale mapson one scale of Village GIS database creation, Quality checking, Finalization of maps, Printing etc.
Achievements: Successfully completed 45 Topo sheet sheets.

Title: Preparation of Cadastral GIS Database

Project Fellow

CSIR

July 1997 - June 1998

Bhopal
KEY ACCOUNTABILITIES:

Managerial:
• Monitoring projects with respect to cost, resource deployment, time over-runs, quality compliance and manpower planning to ensure timely execution of projects.
• Conducting project review meetings for evaluating progress & taking adequate corrective actions.

Functional:
• Handling client interaction for requirement gathering, system analysis and finalisation of technical documents; involved in technical document presentation.
• Preparing Tender Document, Techno-financial Tender document preparation; financial management.
• Managing project on different fronts as Middle Level Manager.
• Responsible for requirement gathering / analysis, Field Investigation, Logistic Support.
• Generating detailed project reports for different projects.

Technical:
• Generating graphs and maps with the help different software.
• Organizing and preparing other documentation related to GIS.
• Overseeing the preparation of hard copies of collected data like maps, drawings and sketches.
• Communicating with users to find out project requirements, data needs and required output.

Project Fellow

RRL, Bhopal,CSIR

At Regional Research Laboratories (CSIR), Bhopal
Title: The Integrated Sericulture Farm Development Programme for District of Madhya Pradesh & Chhattisgarh India.
Client: Department of Sericulture, Madhya Pradesh, India Duration: 1997-1998
Role: Project Fellow Team Size: 10
Technologies: Visual Interpretation of Satellite Imageries, Arc View GIS, MS Excel, Ms Word, AutoCAD Map.
Summary: The project is aimed to increase the area under sericulture in Madhya Pradesh and Chhittisgarh, the State Governments is focusing on bringing new areas under sericulture and improving the quality of silk produced in the State. This programme was implemented to benefit the poor and marginal farmers living in the villages. To help these community govt is providing land and other necessary assistance to established sericulture farm by cooperative basis. For olive plant farming which is the basic food to nurture the worms who produces silk, water is one of the basic requirements for olive plants to grow, for this different water conservation structure is to build as per location.
Responsibilities: Satellite Image interpretation for Hydrogeomorphological map preparation, field investigation and field data collection, Geophysical investigation and data preparation, Site Selection for different water conservation structure, geotechnical investigation etc.
Achievements: Successfully mapped and prepared detailed project reports.

Qualifications & Certifications

Environmental Management & Sustainable Development

Barkatuallha University

Barkatuallha University

Geology

Rani Durgavati University

Rani Durgavati University

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?