Khandge - Civil Engineer - New Delhi, DL, India

Nilesh Khandge

New Delhi, DL, India


Civil Engineer

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Work History

1) Company Name- Larsen & Toubro Limited.
Project Name-Four laning of Amravati-Jalgaon section ofNH-6 in Maharashtra to be executed on BOT basis on DBFOT pattern under NHDP pattern IV.
Name of Client- NHAI
Designation- Senior Engineer.
Stretch Length- 484 KM
Project Cost- 5000 Cr.
Work Profile-Execution of Structure.
Work Executed:-
1) Construction of PSC (Post-Tensioned) Pre Cast 'I' Girders:-
Role performed were-
❖ Construction of foundation for Gantry crane & erection of same.
❖ Construction of I girders as per drawing and design.
❖ Stressing of same girders as per drawing.
❖ Erection of girders.
❖ Construction of ROB, MNB, Culverts etc.

2) Company Name-J.Kumar Infraprojects Ltd. (Mumbai)
Project Name-Milan ROB-Construction of Road Over Bridge on Milan Subway along with vehicular underpass at Santakruz (E)
Name of Client-MMRDA (Mumbai Metropolitan Regional Development Authority)
Designation-Junior Engineer.
Bridge Length-0.689m
Project Cost- 39 Cr.
Work Profile-Execution on site.

Work Executed:-

2) Construction of PSC (Post-Tensioned) Cast-in-situ 'I' Girders:-
Role performed were-
❖ Trestles erection for I-Girder bottom.
❖ RL checking of erected trestles.
❖ Checking of steel as per drawing.
❖ Checking profiling of HDPE pipe as per drawing.
❖ Getting checking done from PMC and concreting of the same.
❖ Arrangement of stressing setup and get stressing (post-tensioned) done in the presence of consultant's Engineer.

3) Casting Yard-Casting of Segments as Match Casting for Segmental Bridge:-
❖ Arrangement and leveling of Straight and Curve bed as per drawing.
❖ Shutter & reinforcement checking as per drawing.
❖ Dispatching of segments from casting yard to site as per launching sequence.

4) Flyover at Kapurbawadi Junction on Thane Ghodbundar Road:-

❖ Erection of Box Girder segments.
❖ Dry matching of segments.
❖ Wet matching of segments.
❖ Bearing fixing as per drawing and traffic direction given.
❖ Pedestal steel checking and grouting.
❖ Stitch preparation,...


Construction of MILAN ROB including Underpass.

Post tentioned I Girders were their with fabricated girders on ROB section.
Bridge length was 0.699 Km.

Qualifications & Certifications

Business Management

MIT College of Management

Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Nilesh Khandge provides the following services:

Supported Countries
Choose your country