Milanov - Geologist - Sofia Center, Sofia, Bulgaria

Nikolay Milanov

Sofia Center, Sofia, Bulgaria

Services

Geologist

Summary:

Europass
Curriculum Vitae


Personal information
First name(s) / Surname(s) Nikolay Milanov
Address Stara Zagora (Bulgaria) General Stoletov 28 en.A fl.7 ap.7
Telephone(s) Mobile +359879681366
E-mail(s) nikolay.m.milanov@abv.bg
Nationality Bulgarian,
Date of birth
Gender Male

Desired employment / Occupational field Geologist , Underground construction

Work experience

Dates 01/2007 - 12/2010
Occupation or position held Engineer Geologist(32month) and Organisation, coordination and planning(16month)

Main activities and responsibilities
Hydro power plant ,,Tsankov kamak’’ -130m double arch dam with 3 rows grout curtain up to 80m,every block had 1 or 2 core drilling – sum 2000m borehole logging(tested with water pressure test(Lu)), ,,Gashnya’’ full supported highly karsted valley for prevention filtration from reservoir - 1100m long,120 000m² shotcrete,50 000 nos anchors up to 12m,landslide and block slide area ,and also bottom are covered with geomembrane. Pentstock -tunnel with 60m vertical shaft and 540m inclinend area for derivation water from reservoir to turbine, tectonic treated material-supported with Swellex , arc and still pipe 5,4m²(8mm). Powerhouse station with 40l/s water debit on excavation stage, after that consolidation grouting up to 40m.20 km New Road (up to 7% inclination) with quantity of excavation work 3Mio m³, quantity fill works 700 000m³(tested), 6600m Concrete Retaining walls up to 8 m high, 2800m Soil Retaining walls up to 20m high, slope protection with anchors up to 18m(IBO) and (SN).

Acceptance of base before concreting, orientation of anchors, measurement of piezometers , decision for drainage and preparation of documents – part Geology
Name and address of employer

Dates
Ocupation or position held


Main activities and responsibilities
Na

Work History

Senior expert

From June 2013

1. Development, management and implementation of programs/ projects financed by EU funds
2. Waste management:
- Remediation of contaminated municipal areas
- Landfilling of waste
- Treatment and transportation of industrial and hazardous waste
3. Screening of project proposals applying for funding from the Enterprise
4. Preparation of technical documentation
5. Participation in public procurement evaluation committees
6. Communicating with state and local authorities, Ministries, NGOs and private companies

Ministry of Environment and Water,
Environment

Mud Engineer, Technologist Trenchless Technology

SPR, Microtunneling

September 2012 - November 2012

Method statement, execution data, drilling profile, reaming forces.
Construction machinery - Bulgaria, Kazanluk 6100 Central Post Box 71

Main activities and responsibilities

Procurator

November 2012 - February 2013

Offers, Technology, Experts, Government schedule of execution
Geoprouchvane - Bulgaria, Yambol, Yambolen street 13

Type of business or sector
Dates

Occupation or position held

Main activities and responsibilities


Name and address of employers

Type of business

Work experience abroad

Dates
Occupation or position held

Main activities and responsibilities


Name and address of employers

Type of business


Consultancy projects

Construction, Searching of mineral and industrial materials

Engineer Geologist

May 2011 - February 2012

Tunnel, Markovec' in Republic Slovenia - 2,2km highway, 2 tube with 7 cross passage(20m), largest profile up 130m², in sediments. Executed heavy support with still arches -21mm and 1m concrete bottom, shallow overburden area up to 8m in urban area. Inner lining concrete 20 cm.

Preparation of documents, face mapping, weekly report, measure control system ( extezometers, piezometers, inclinometers).Modelling of massif.
Alpine Bau GmbH
7, Poduevo, 1680 Sofia (Bulgaria)
Construction


Geological investigation of relocation road Kalotina - Sofia (34km)
Analyze of intense strain of tunnel KET2-KET3 in mine Elacite
Documents and design of hydro drillings ( Government regulation)

Engineer Geologist

(32month) and Organisation, coordination and planning(16month)

January 2007 - December 2010

(32month) and Organisation, coordination and planning(16month)
Main activities and responsibilities
Hydro power plant, Tsankov kamak'' -130m double arch dam with 3 rows grout curtain up to 80m, every block had 1 or 2 core drilling - sum 2000m borehole logging(tested with water pressure test(Lu)), , Gashnya'' full supported highly karsted valley for prevention filtration from reservoir - 1100m long, 120 000m² shotcrete, 50 000 nos anchors up to 12m, landslide and block slide area, and also bottom are covered with geomembrane. Pentstock -tunnel with 60m vertical shaft and 540m inclinend area for derivation water from reservoir to turbine, tectonic treated material-supported with Swellex, arc and still pipe 5,4m²(8mm). Powerhouse station with 40l/s water debit on excavation stage, after that consolidation grouting up to 40m.20 km New Road (up to 7% inclination) with quantity of excavation work 3Mio m³, quantity fill works 700 000m³(tested), 6600m Concrete Retaining walls up to 8 m high, 2800m Soil Retaining walls up to 20m high, slope protection with anchors up to 18m(IBO) and (SN).

Acceptance of base before concreting, orientation of anchors, measurement of piezometers, decision for drainage and preparation of documents - part Geology

Name and address of employer

Dates
Ocupation or position held


Main activities and responsibilities
Name and address of employer
Dates
Ocupation or position held
Main activities and responsibilities
Name and address of employer

Alpine Bau GmbH
7, Poduevo, 1680 Sofia (Bulgaria)

Qualifications & Certifications

Russian and English

Secondary education - High school

organisation

Russian school

University of mining and geology

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×