Helgeland - HVAC Management & Lead - Tønsberg, Norway

Niels Helgeland

Tønsberg, Norway

Services

HVAC Management & Lead

Summary:

I am an energetic HVAC professional with over 19 years of combined experience within the HVAC environment. Greenfield & Brownfield experience, I have experience working with a diverse population of nationalities and educational backgrounds, both as a professional person and in private life.

I am innovative, preventive, strategic‐thinking, solution oriented with good interpersonal communication skills and I easily adapt, learn and utilize new systems pretty fast. I am skilled in relationship building with clients, and across organizations and teams.

I am comfortable with assessing needs, generating options, and implementing solutions in collaboration with colleagues or on my own. I am experienced in consulting and managing projects from the requirements gathering/needs identification, detail engineering phase through commissioning and completion.

Work History

External Hire Principal engineer Mechanical / HVAC / Civil & structures- HVAC, Statoil ASA

Statoil

From September 2013

09.2013 External Hire Principal engineer Mechanical / HVAC / Civil & structures- HVAC, Statoil ASA. (Sector: Energy / Oil-Brownfield, Specialization: HVAC, Role: External hire Principal Engineer knowledge responsible)
Client: Kårstø (Gas process plant) / Mongstad (Oil refinery-light products) - Norway & Kalundborg (Oil refinery Heavy products) Denmark.

Statoil ASA's HVAC Technical Support - representative, Third party verification and LCI. Making shore that any internal modification or delivery to Statoil ASA is according to their Technical rules and regulations on top of the NORSOK Regulative.
HVAC - Detail Engineering and LCI support to internal and external deliveries to Statoil ASA.
Main Tasks: Removal, phasing out R22 as cooling media. By means of retrofitting existing equipment (R427a) or new direct expansion units and water based chillers with or without fire retardant glycol solutions for process and HVAC equipment.

Senior Engineer / HVAC, Permanent employee

Dovre Group ASA

From September 2013

Senior Engineer / HVAC, Permanent employee
Client: Statoil

External Hire Principal HVAC Engineer

Mongstad

From September 2013

Statoil ASA. Client Statoil Mongstad.
HVAC Control of the Multiconsult consultancy studies and detail engineering related to the out phasing of R22 as a cooling media. NORSOK specifications and according to Statoil's Technical Requirements for Mongstad.
Removal of 2*175kW R22 complete decommissioning.
Installation of 2*245kW Ammonia water chillers (redundancy package). With all necessary safety procedures & equipment needed to satisfy Statoil's TR's & complete LCI.

09.2013 Mongstad Train 6100 propene facility - Out phasing of R22 cooling media.
(OIL Refinery), Statoil ASA. Client Statoil Mongstad.
HVAC study and detail engineering related to the out phasing of R22 as a cooling media. Removal of R22 with complete decommissioning of gas.
Replacement - Installation of new R427a. With all necessary safety procedures & equipment needed to satisfy Statoil's TR's. 1 to 1 functional change & complete LCI.
This not as the preferred way of action for this facility but as the only financially viable option at the time.

09.2013 Mongstad Remaining DX units - Out phasing of R22 cooling media.
(OIL Refinery), Statoil ASA. Client Statoil Mongstad.
HVAC study and detail engineering related to the out phasing of R22 as a cooling media. NORSOK specifications and according to Statoil's Technical Requirements for Mongstad. Removal of 9* R22 complete decommissioning.
Replacement - Installation with 7 * 407c DX units. With all necessary safety procedures & equipment needed to satisfy Statoil's TR's. 1 to 1 functional change & complete LCI.

External Hire Principal HVAC Engineer

Kårstø

From September 2013

Kårstø Control of the finalisation of the new NLB laboratory.
(Gas Processing plant), Statoil ASA. Client Statoil Kårstø.
HVAC studies and detail verification of delivery by AF group.

Statoil ASA. Client Statoil Kårstø.
HVAC study and detail verification of Aibel consultancy analysis. Regarding Natural ventilation.

External Hire Principal HVAC Engineer

Kalundborg

From September 2013

09.2013 Kalundborg Main Control Rom - Out phasing of R22 cooling media.
(OIL Refinery), Statoil ASA. Client Statoil Kalundborg. TFA.
HVAC Control of the consulting companies studies and detail engineering related to the out phasing of R22 as a cooling media. NORSOK specifications and according to Statoil's Technical Requirements for Kalundborg.
Removal of existing R22, decommissioning and complete installation of new 407c chiller package. EU. Rules and regulative's.
With all necessary safety procedures & equipment needed to satisfy Statoil's TR's & necessary LCI documentation.

Senior HVAC Engineer

Aker Solutions - Engineering and Technology

August 2012 - September 2013

(Sector: Energy / Oil-Greenfield, Specialization: HVAC, Role: knowledge responsible)
Project Edward Grieg work for Kværner - Client Lundin.
HVAC Engineering and design control of feed. NORSOK specifications Lundin's Technical Requirements.(Composing) Documentation, D & ID Drawing HVAC, P& ID Drawing, Potable water, Central Vacuum Cleaning and Sewage water. Implementing name changes for Dampers in Lundin's code manual Lunas (Lundin's Technical Requirements). Super user (LCI) in Comos.

(Senior), HVAC Engineer

Valemon Project., Agility Group

August 2011 - August 2012

(Sector: Energy / Oil-Greenfield, Specialization: Mechanical technology, Role: knowledge responsible and short terme Lead responsibility)
Project VALEMON work for Samsung Heavy Industries - Client Statoil HVAC Engineering and design HVAC Package / Equipment responsible Refrigeration Engineering- DX units NORSOK specifications Statoil TR Requirements Layout & Outfitting, LCI in Statoil's Stid Tag/Doc.

Service Engineer / HVAC Lead / Project Manager

YIT

February 1998 - May 2011

ABB B.S. AS, YIT AS. (Sector: Property / Estate, Specialization: Energy systems, Role: Specialist-Consultant- knowledge responsible, service technician, service Engineer & Project leader)
My first solid customer service was with this background my former employer Felleskjøpet fish feed. (Noraqua, Ewos etc.)
I was because of my interest in new technology quickly involved in the work of the companies building and construction department, where I for 3 years only worked for them.
This gave me a unique opportunity to participate in most of the things
related to delivery, launch, commissioning and fixing faults in new
HVAC systems and related building automation.
Based on my good will and the ability to generate enthusiasm in my surroundings I became more engaged in being a role model and a coach to co-workers when it came to problem solving and as a consultant to the HVAC service department. Making sure we stood out from our competitors.
My work included sale and design of HVAC systems, technical improvements, heat pumps, automation, frequency converters / drives, different types of cleaning of polluted/process air through different types of filter medias and electrostatic filters, moist controllers, remodelling jobs, climate, fungus and water damage analysis and other energy-relevant low voltage products.
This alone, along with colleagues, customers and external suppliers like Halliburton, Sweco, Statoil, Schlumberger, Telecom Lab, Exxon mobile, etc.
This means contact with most types of people and personalities, organizations, implementing the "we" structure in all of my colleagues, other staff / subject groups to make sure we fixed, solved and developed our knowledge base through our deliveries.
I ended my career in YIT AS in 2011 as I went on to seek new challenges within the Oil and Gas industry.

Project mechanic

Laerdal Medical

November 1997 - February 1998

Medical (Sector: Medicinal sector, Specialization: Mechanical technology, Role: Co-worker)
Constructed fixing / lifting tools for robots related production machines, service-related maintenance performed on the die-casting machines and related robots, made / created equipment for machine operators to simplify their everyday life.

Production Technician

Noraqua Innovation

June 1995 - January 1998

Ewos Innovation (Sector: Other production, Specialization: Mechanical technology, Role: Technical specialist knowledge responsible)
Helped build and pilot plant from day 1. When the structural building was up. Electric motors, controllers / converters, load cells, calibration, ventilation, heating, cooling, hydraulics, pneumatics and cable sizing / routing. Had in connection with this job a valid blue boiler certificate in addition to various courses in the steam and water treatment. Operation of production facilities for technological development of research food and equipment for the fish feed sector.

Projects

Edward Grieg - Lundin

Project Edward Grieg work for Kværner - Client Lundin.
HVAC Engineering and design control of feed. NORSOK specifications Lundin's Technical Requirements.(Composing) Documentation, D & ID Drawing HVAC, P& ID Drawing, Potable water, Central Vacuum Cleaning and Sewage water. Implementing name changes for Dampers in Lundin’s code manual Lunas (Lundin’s Technical Requirements). Super user (LCI) in Comos.

VALEMON - STATOIL

Project VALEMON work for Samsung Heavy Industries - Client Statoil HVAC Engineering and design HVAC Package / Equipment responsible Refrigeration Engineering- DX units NORSOK specifications Statoil TR Requirements Layout & Outfitting, LCI in Statoil’s Stid Tag/Doc.

Qualifications & Certifications

Maskinteknikk - Produksjon og Energi

Stavanger Tekniske Fagskole

General upper secondary school

Mechanical technology

General upper secondary school

Mechanical technology

General upper secondary school

mechanical engineering

Godalen Secondary school

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×