Pirvu - Welding Control AQ - Onești, Romania

Nicu Pirvu

Onești, Romania

Services

Welding Control AQ

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Work History

SC GIRONAP SA Onesti

company specializing in industrial construction and repair work, I was appointed Technical Welding and quality control, having the task of coordinating the work of welders in the company proceeded to authorize such welders have could perform the work of drinking water pipes pipe fitting and pipe, HDPE fitingurii fully documented and taught ISCIR authorization documentation repair and construction of water supply do I use welding, SRM, SRS, SD, standard basic materials used PE80 / PE 100, the thicknesses 8.2, the diameters > 90
Tue deals with authorization young welders preparing them for electric welding and oxyacetylene cutting and welding, and TIG welding specimens taken daily with dimensions 125 mm welds prepared to control the Rx and control, visual,
2009-2013 SC GIRONAP SA Onesti company specializing in industrial construction and repair work, I was appointed Technical Welding and quality control, having the task of coordinating the work of welders in the company proceeded to authorize such welders have could perform the work of drinking water pipes pipe fitting and pipe, PE-HD fitingurii fully documented and taught ISCIR authorization documentation repair and construction of water supply do I use welding, SRM, SRS, SD, basic materials used - PE80/PE type 100, the thicknesses 8.2, the diameters> 90
I participated in repair work in Onesti RafoSA changed plates, heat exchangers overhaul, replaced valves, fittings, thermocouple mounted by welding, repair and overhaul oil feed pipes 325x12 olt 45 k3, thickness measurement performed at various bends and surface pipe for determining wear, proceeding to replace various sections with preparation of the cuts, the isolation pipe cleaning and replacement cutting operation and support ring welded to the root of the root in TIG welding and electrical supertit 2.5 and superbaz 3.25

SC Gironap SA Onesti

Position: Responsabil tehnic autorizat ISCIR cu sudura instalatiilor metalice control si autorizare sudori
Work performed:pregatit si autorizat sudori, executat lucrarii de montaj conducte, confecti metalice, montat traseu apa conducta PE HD SDR 110X10

Technical Manager Authorised ISCIR hardware control and authorization welding welders

SC Gironap SA Onesti

Work Performed: prepared and approved welders, pipe installation work performed, manufacturing metal mounted water pipeline route HD SDR 110X10 Spoken Languages: Italian-right
English-Good
French-Good
Russian-right

Technical Manager RTS ISCIR

RAFO SA Onesti

welding supervisor is certified and pressure vessels and installation of high-ISCIR RSVTI I do and filling stations are in affiliation with RAFO SA Onesti, my duties were to inspect each filling station that must ISCIR bills to the documentation of vessels under pressure, environmental permits, also have to assist vessels revisions fuel and pipeline routes to be replaced, taking special measures gas removal, and check and replace all was recorded over a year as the defect liability and fuel depots in Craiova, Bucharest and Constanta entering the annual revisions, replacement valves, valve perform nondestructive U.S. and liquids penetrating the deposit vessels, ducts, 32x6, 133x6, 60x4 olt 45. Tue deals with authorization young welders preparing them for electric welding, oxyacetylene cutting and welding, and TIG welding specimens taken daily with dimensions 125 mm by two to inbinare electric, oxyacetylene and TIG their evil task to prepare in order to weld welding equipment to prepare and execute welds that were taught to me to control, visual, and Rx together then proceed to analyze defects and remedy them after they rebuilt NDT

Technical Welding and pressure control devices

RAFO SA Onesti

Work Performed: Repair and overhaul of lifts oil, steam, oil, salt, gas stations revisions
Worked in investment culvert pipe OL45 K III 325 x12 brine-Tg Ocna Chimcomplex Borzesti

Chief welding and control laboratory have participated

in the work of culvert pipe replacement saline salt mine Tg Ocna -SC Chimcomplex Borzesti a distance of 27 Km, x12 pipe diameter of 325 OLT 45 K, we participated during maintenance and warehouse facility in RAFO Onesti: Replace line 28 x4, 32x2,, 32 x6, 60x6, 133x6 OLT 45 K3, 10Cr Mo 10, 16 Mo 3 steel, brass, heat exchangers revision controlled pressure tightness and quality of welds, repaired and reconditioned support overhead pipes, replacement, maintenance steel plates, pots deposit reconditioned fuel replacement and weld new petal of olt 45 electric welding electrodes superbaz, supertit 2.5 and 3.25, control penetrant U.S. control and test pressure

Borzesti and was appointed head welding lab

Welding Institute Timisoara

, and I was busy preparing young people sweat after a year I was sent to cursurii specialization Welding Institute Timisoara resistant steels for welding training in use in power plants, I was appointed team leader and participated in revision thermal power plant boilers and boiler Borzesti 420t / h and we replaced the pipes from the boiler system based Ferb collectors up to 273 x32 OLT 45 mm K3 diameter pipes 28x4, 32x4, 60 x6, 72x6 133x6, 325x28 olt 45 k3 10 Cr Mo 10 Cr 16 Mo, Cr MOV 121 x20 welding technology that I used was purchased from mounting enrgo bucuresti manufacturer boiler flame was using heat treatment to small diameter pipes up to 60 x6 and cassettes for the treatment up to 133x6, above this size used thermal stations requiring special training and pipes so they wrapped cola asbestos soaked in water to completely molded pipe, and then mount the thermocouple in the execution of welding wire rope that was tied to the copper pipe in the diagram warming finish the treatment process approved and verified ISCIR
1985-1991 Also during this period I was appointed chief nuclear unit after the NDT I graduated range, Rx, liquid penetrant, magnetic particle and was certified in February Nevel this time I was certified ISCIR and Technical Welding and I coordinated welding of revisions from Galati where I replaced thermal heat pipe with diameter 325 x 32 mm 10CrMo 10 x20 Cr MoV121, OLT 45 K3, welding heat treatment was performed with the diagram of the welding process, welding WIG was done, I realized and checking welding NDT of welds made 10% range we also controlled penetrant pipes and nozzles planted in collector pipes and welds and nozzles for temperature control thermocouples, we performed 100 % U.S. control weld diameter 219 273 325, we conducted and papers while performing visual inspection of welds and in the end, we made Repartee card installation and performed the installation pressure test welded and repaired before the beneficiary and the inspector...

Chief welding laboratory

Work Performed: I coordinated and taught the beneficiary completed repairs to Borzesti thermal, thermal Braila, Galati Doicesti, constantly exchanging heat pipe system Ferb boilers 429 t / h
NDT Contract from Shell-location company Viperesti Buzau
Contract drilling control pipe installation AMOCO-ROMANIA

Qualifications & Certifications

Industrial High School in chemical refineries repair

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Supported Countries
Choose your country

×