Cruz - Project Management - Manila, NCR, Philippines

Nelson Cruz

Manila, NCR, Philippines

Services

Project Management

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Summary:

1. Engineering Services fulfillment/delivery – control over engineering activities such as Site surveying,
Equipment installation, Equipment Commissioning and Testing including commitments with clients customer
2. Project Control & Management – Scheduling, Planning and Responsibility Matrix and survey, installation,
testing, materials and logistics forwarding including delivery of equipments to site.
Supervision and control of subcontractors to strict compliance with the relevant and pertinent conditions
stated on the Project contract.
3. Expertise in resource scheduling, allocation and deployment. Analyze project cost against allocated
Operational and Capital expense budget.

Work History

Assumes Project team leader during mobilization to site

Project Implementation Management

Supervised equipment installation, site survey, project planning including logistics management.
Assumes Project team leader during mobilization to site.
Assumes Quality Assurance supervision on site during implementation and site completion to minimize
re-mobilization to site due to poor workm anship quality
Implements Sweep Testing of Broadband Equipment to ensure and certify that the equipment is fully
operational.

FTTH / OSP Project Manager

Wuhan Fiberhome International Technologies Phils

From November 2013

National Capital Reg,
Philippines


1. Engineering Services fulfillment/delivery - control over engineering activities such as Site surveying,
Equipment installation, Equipment Commissioning and Testing including commitments with clients
customer
2. Project Control & Management - Scheduling, Planning and Responsibility Matrix and survey,
installation,
testing, materials and logistics forwarding including delivery of equipments to site.
Supervision and control of subcontractors to strict compliance with the relevant and pertinent conditions
stated on the Project contract.
3. Expertise in resource scheduling, allocation and deployment. Analyze project cost against allocated
Operational and Capital expense budget.

Project Manager

ECI Telecom Philippines Inc

October 2012 - April 2013

Smart - ECI Fiber Switch Project South Luzon, Central Luzon, Visayaz and Mindanao


- Apollo 9624/9608 Fiber Switch Installation
- Technical Site Survey and Site Survey Report
consolidation,
- Equipment Software Commissioning,
- Equipment Network Integration to SMART Network, - Equipment Nodal Acceptance Testing,
- Equipment Provisional Acceptance Testing
- Materials Logistics Management.


Project Coverage On the following areas
- Davao Area
- Laguna and Batangas Area
- Cavite Area
- Bulacan Area
- Pampanga and Bataan Area

Wireless Project Manager

e-Formula Technologies

April 2012 - July 2012

(3 months ) e-Formula Technologies
Project Manager Globe NEMESIS WIRELESS Project


Globe - Huawei NEMESIS WIRELESS Project in NCR (CAMANAVA Area),
-Expansion of Globe Wireless 2G and 3G Facilities under the Globe NEMESIS Project
-Survey for New Location of Huawei BTS Equipment and Antenna
-Site Acquisition for New Equipment Location on Existing Globe BTS Sites
-Installation of New Huawei BTS Equipm ent, Antenna and Datacom Equipm ent (Hot Swap, Cold
Swap and Change out)
-Power and Grounding installation
-Commissioning of BTS Equipment and Datacom Equipment
-Site Clearing and Acceptance

OSP Project Manager

Philko Ubins Ltd. Corp

May 2011 - April 2012

Project Manager PLDT MSAN Outside Plant Project Cebu


PLDT - Huawei MSAN OSP Expansion Project in 5 areas in Cebu,
-Montserrat Lapu-lapu City - MSAN Outdoor Cabinet Installation, Aerial Copper Secondary Cable
Installation and Fiber Optic Cable, Termination and splicing 1.5 km.
-Bougainvillea Lapu-lapu City - Aerial Copper Secondary Cable installation and Fiber Optic Cable,
Termination and splicing 1.0 km.
-Bogo City 1 - Aerial Copper Secondary Cable installation and Fiber Optic Cable, Termination and splicing
1.3 km.
-Bogo City 2 - MSAN Outdoor Cabinet Installation, Aerial Copper Secondary Cable Installation and Fiber
Optic Cable, Termination and splicing 1.6 km.
-Bogo City to Daan Bantayan - Aerial Copper Secondary Cable installation and Fiber Optic Cable,
Termination and splicing 34 km.
-Daan Bantayan - Aerial Copper Secondary Cable installation and Fiber Optic Cable, Termination and splicing 1.4 km.


Project Manager DTPI FMC Outside Plant Project NCR

DTPI - Huawei MSAN OSP Rehabilitation Project in 3 Rizal Cities


-9 sites in Cainta Rizal - MSAN Outdoor Cabinet Installation, Aerial Copper Secondary Cable Installation and Fiber Optic Cable, Termination and splicing.
-1 Site in Antipolo City - MSAN Outdoor Cabinet Installation, Aerial Copper Secondary Cable Installation and Fiber Optic Cable, Termination and splicing.
-6 Sites in Angono City - MSAN Outdoor Cabinet Installation, Aerial Copper Secondary Cable Installation and Fiber Optic Cable, Termination and splicing.
-1 Site in Morong City MSAN Outdoor Cabinet Installation, Aerial Copper Secondary Cable Installation and
Fiber Optic Cable, Termination and splicing.


Project Manager ECI Electric Coop BPLCI - ECI GPON Outside Plant Project Ilocos Norte


-Bangui Ilocos Norte - Installation of Aerial Fiber Optic Cable, Termination and splicing of 21 km. Aerial
FOC, Installation of GPON Equipment CO and Installation of Pole Mounted GPON Wifi Cabinet and antenna.

Project Manager

B87 Technologies Inc

February 2011 - May 2011

February 2010 - Present


Project Manager Globe/MEC ADX DDF Expansion Project

Project Manager

Huawei Technologies Phil. Inc. (Huawei)

January 2008 - October 2010

(2 years 9 months ) Huawei Technologies Phil. Inc. (Huawei)
January 2008 - July 2010


Project Manager Digitel MSAN Project

Installation, Commissioning and Network Integration of the following Equipments; MA5100 Big DSLAM
(AccessNetwork), UA-5000 MSAN (Multi Service Access Network), CX-300 and 200 (Datacommunication),
OSN-1500,2000,3500 (Transmission Optix)


Supervised equipment installation, site survey, project planning including logistics management of Digitel
MSAN Phase 2 Project, ADSL 12th Roll Out, ADSL 14th Rollout.
Assumes Project team leader during mobilization to site.
Assumes Quality Assurance supervision on site during implementation and site completion to minimize
re-mobilization to site due to poor workm anship quality
Implements Sweep Testing of MSAN, DATACOM, OPTIX and DSLAM Equipment to ensure and certify that the equipment is fully operational.

Senior Technical Engineer

Digital Telecommunications Philippines

August 2000 - December 2007

(7 years 4 months ) Digital Telecommunications Philippines
August 2000 - January 2008


Senior Technical Engineer

Test Equipm ent Repair Administration


Facilitate and Control Evaluation, repair and rework of defective items
Preparation of MRF for repair Facilitate and Monitor Approval of MRF through SAP PM Module PR
Creation of approved MRF
Monitoring of PO Creation and PO Approval through SAP PM Module
Receipt of Repaired Items for testing


Copyright @ 2014 JobStreet.com
Facilitate and Control Acceptance Testing of Repaired Items
Preparation of Acceptance Test Report


Data Management of SAP PM and MM Data base, Repair Monitoring Database and MRF Monitoring
Database.
Purchasing Support

Supervising Project Engineer

Philippine Cable Network & Construction Inc

June 1999 - August 2000

(1 year 2 months ) Philippine Cable Network & Construction Inc.
June 1999-August 2000


Supervising Project Engineer

Outside Plant Implementation Construction
Material Estimate cost Estimator.
Project Cost Estimator.
Right of Way Coordinator, Site acquisition and Permitting Engineer
Field Surveyor
Material Inspection Engineer
Project Coordinator
Project Engineering Drafting Design


Projects and Scope of Work

PILTEL, Metro Manila Fiber Optic Cable Expansion Project; pole erection, aerial cable installation and underground cable installation


SUBICTEL, Underground Fiber Optic cable Installation Project; underground duct construction and cable
installations.


BELTELELECOMS, Cell site Construction Project; estimate of under ground fiber optic cable installation


GLOBE TELELECOMS, Cell site Construction Project; cell site construction project estimate

Section Head

EVER SHOPPERS INC

March 1998 - June 1999

(1 year 3 months ) EVER SHOPPERS INC.
March 1998 - June 1999


Hardware Section Selling Supervisor

Selling, Inventory, Merchandising Control
Customer service and interface administration

Qualifications & Certifications

Engineering

Polytechnic University of the Philippines

Civil Engineering

Polytechnic University of the Philippines

Camp Gen. Emilio Aguinaldo High School

Primary School

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Supported Countries
Choose your country

×