Hakim - Land Surveyor - Navi Mumbai, MH, India

Nazir Hakim

Navi Mumbai, MH, India

Services

Land Surveyor

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Summary:

Hi, I am in to Gas pipeline (Cross-Country), Cadastral Survey, Topo Crophical Survey & Reconnaissance surveys. From Last 10 years.
I can prepare, L-Section, Cross-section, Alignment sheets , cadastral map & Land Acquisition Statement

Work History

Survey Manager

Reconnaissance survey NGPL( Numailghar

February 2011 - March 2011

for Gas Authority of India
Ltd.

• Reconnaissance survey OVPL (Oduru-Vizag Pipeline)

Authority of India Ltd

March 2011 - March 2011

Reconnaissance survey Raniganj (ESSAR CBM) to Kolkotta

Authority of India Ltd

April 2011 - April 2011

Authority of India Ltd

May 2011 - June 2011

Covering length of 47.935Km. dated
08.06.2011 for GAIL (India) Limited, New Delhi.

• Reconnaissance Survey for Zimbabwe - Mozambique
Slurry Pipeline Project covering 475.5Km in Country
Zimbabwe & Mozambique under Work Order No.
ZIM/SLPL/004 Dt. 29.07.2011 For Essar Projects

• Detailed Topographic survey, boundary location, and contour survey by using total station for your proposed
University site located in the vicinity of Karajat Taluka,
Raigad district for area about 600 Acres for Reliance
Group.

• After Completion of site preparation of alignment sheet,
Cross section, laq and cadastral maps for BCPL (74.80km)
For Essar Projects.
• Total responsibility of road survey from Rugudi to
Dabuna preparation of alignment sheet, Cross section, laq and cadastral maps For Essar Projects.
• Total responsibility To club the data of KVPL route
survey from the sub Contractors. preparation of alignment sheet, Route maps, Cross section, laq and
cadastral maps For Essar Projects.

5
• Total responsibility Of topographical survey for RIGHTS
(Railway) fror CST - Panvel, Panvel - Virar, Seawoods to
Airport (Ulwe).


Present Responsibility
• Total Responsibility For Annual Rate Contact for Two Years for Detail Survey for
Various pipeline for GAIL (India) Limited, New Delhi,
Ref. No. Foi. GAIL/ND/PROJ/C&P/RC SURVEY/012-50/066 DATED 21.12.12
• Total Responsibility of Survey in ONGC Uran
• Total Responsibility of Survey in Jamnagar Plant


Contact details of my Employer
Period Employers address

Survey Manager

Gail India limited

February 2010 - June 2010

Preparation of Alignment sheets, cross section , rout map for Gail India limited for VBPL, KBPL & LJPL projects

Survey Manager

Authority of India Ltd

January 2010 - April 2010

Reconnaissance survey NTPC To Tivandram 120km In
Kerela. during the period 01.07.2010 to 15.17.2010 for Gas
Authority of India Ltd.

Survey Manager

Reconnaissance survey SPPL

September 2010 - November 2010

for Gas Authority of India
Ltd.

4

Authority of India Ltd

December 2010 - December 2010

Kalamboli

July 2009 - August 2009

Headed The Survey team for 25km Existing Road Survey
From Chalk to Proposed Reliance site at Vengaon Karjat
For RGTIL during 15.09.2009 to 12.10.2009.

• Headed The Survey team for Topographical Survey & contour survey for Proposed Reliance site at Vengaon

Survey Manager

Karjat for RGTIL

October 2009 - December 2009

Headed the survey team ,Preparation of Alignment
sheets, cross section , rout map for proposed Slurry

Survey Manager

SPPl

May 2008 - March 2009

Headed the survey team for detailed survey contour
drawing & Computation of earth work with different
datum's for deciding balancing cutting & filling of plot & Preparation of L-section along proposed boundary wall
For for MAHA TRANSCO (MAHARASHTRA STATE
ELECTRICITY TRANSMISSION CO. LTD.) at proposed

(V)) / Head

Nos

February 2007 - June 2007

Navi Mumbai.

• Headed the survey team for Detailed Feasibility study and preparation of report of 220kv Transmission line from
Dronagiri-Ulwe-Kharghar & Dronagiri-Apte-Kalamboli
covering length 85km Under W.O.No. SZ4 / 53504148
dated 07.03.2007 during the period 15.03.07 to 14.04.07 in
Uran, Panvel area Raigad District. For Navi Mumbai SEZ
Private Limited (Reliance).

• Carry out traverse, topographical survey, measurements of hutment area and providing the information of hutment in the prescribed Proforma of hutment on and along Tansa
Trunk Mains & Reservoir in N ward under work order No.
ACN/13117/MN dated 03.08.2007 in Mumbai covering an area 125895 Sq.m for Brihanmumbai Mahanagarpalika
(BMC), Mumbai.

• Headed the survey team for Topographical survey, contour
survey and site clearing by cutting and removal of grass,
plant and vegetation etc of the proposed plot for CISF
housing in the western sector at Anushaktinagar, Mumbai
covering an area 32603 Sq.m under W.O.No. DCSE / CPE
(V)) / Head (PCD) / CISF - SC / 286 dated 20.10.2008 during the period 20.10.2008 to 19.11.2008 for BARC,
Mumbai.

• Headed the survey team for Topographical survey & contour
surveying for oil pipeline passing through DAE property at
Anushaktinagar, Mumbai covering an area 228037 Sq.m under W.O.No. DCSEM/ESD/TTM-II/113 dated 07.10.2008 during the period 07.10.08 to 15.01.09 for BARC, Mumbai.

• To carry out total station survey of Crompton Kanjur
Nalla System in Catchments Area No.306 and Kannamwar
Nagar Nalla System in Catchments No.307 of Eastern
Suburbs in S/Ward and inventory of adjoining
structures/hutments on or along above system for 66000 Sq.m and length 10.3 Km of various nala section for
Brihanmumbai Mahanagarpalika (BMC), Mumbai


• Preparing a 0.5m contour map of 1:1000 scale of Bhivpuri
Ghat section in AutoCad showing all topographic and ground features for RGTIL during 09.10.2008 to 10.11.2008

• Preparation of Alignment sheets, cross section , rout...

Survey Manager

Reliance Industries Limited

From June 2006

01.06.06 for Reliance Industries Limited.


• Headed the survey team for Topographical survey, contour
survey and respective site clearing for identified blocks in

DCSE/Head

IIT

November 2006 - December 2006

during the period 12.12.06 to 11.02.07 for
BARC, Mumbai.

• Headed the survey team for Detailed traverse, topographical
survey, contour survey, measurements, demarcation and preparing site plans of each dump site work also involved
collection/obtaining of village maps, 7/12 extracts, 6
extracts, form 8A & gat book plans from concern authorities and also preparation and submission of all drawings & data in Maharashtra covering an area 275 Acres of EWPL
Project under W.O. No.XX8/3597139 Rev-0001 dated
13.10.2006 for Reliance Gas Transportation & Infrastructure Company Limited

• Headed the survey team for Carrying out detailed
assessment survey of existing various plants at Ex.NOCIL to locating reference points on existing equipments, plants

2
structure outline at Reliance for relocation of the same to
Gandhar by using total station Survey points taken 16127

Survey Manager

Gammon India Limited

From February 2005

Preparations of route map, cadastral map & LAQ statements for water pipeline route at landfall point, Kakinada in Andhra
Pradesh covering length 14km under W.O. No.
OG8/3575159 dated 07.05.2005 for Reliance Industries
Limited.

• Preparation of Drawings for Detailed traverse, topographical
& contour survey at Bhivpuri Ghat, Raigad & Pune districts in Maharashtra covering an area 1kmx2km i.e. 500 Acres of
EWPL Project under W.O. No.GT/XX1/3579045 dated

Survey Manager

Reliance Gas Transportation & Infrastructure Company Limited

From June 2005

30.06.2005 for Reliance Gas Transportation & Infrastructure Company Limited.


• Headed the survey team for Detailed Engineering route
survey including soil investigation and soil Resistivity survey for HPCL connectivity project in HPCL Refinery Mahul
covering length 05km under W.O.No.PS4 / 3603724 dated

data entry operator

Heena

From March 2004

communications. (Reliance recovery office)
(April 2002 till December 2003)

Languages Known: Marathi, Gujarati, Hindi, Bihari, Punjabi & English.



Age: 29 Yrs

Address of: Victory Aura Co. Ho. Society.
Communication Apartment No.: 702, Plot No.: 192 & 193, Sectec-3,
Ulwe, Navi Mumbai - 410 206
Contact No.: +919769255266
+918080637052
Email: mr.nazir.hakim@gmail.com

Other Activities: • Positioned as Student Leader for F.G.Naik College.
• A part of F.G.Naik Cricket team and Football team.
• Taken Part in Various Debate and Speech
Competitions.


1
Projects Associated
Period Projects

No. GM//C&P

Preparations

of route map, cadastral map & LAQ statements for DUPL's customer in Taloja / Navi Mumbai / Patalganga /
Kalyan / Shahad area covering length 68km under W. O.
No. GM//C&P/04-05/C-227 dated 25.11.2004 during the period 01.12.2004 to 31.12.2004 for Gas Authority of India
Ltd.

• Preparation of as built and topographical survey from HLPL
Hazira terminal to GSPL terminal Mora covering length
18km Under W.O. NO. GIL/CEPL/LOI/MSA/02 dated

Survey Manager

M.S.ssociates

2/9,D-28&30,
Sector-48 Nerul,
Navi Mumbai-400 706

Qualifications & Certifications

St. Xaviers High School

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Nazir Hakim provides the following services:


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×