Ravichandran - Project Manager,Construction Manager - Mogappair East, Chennai, Tamil Nadu, India

Natarajan Ravichandran

Mogappair East, Chennai, Tamil Nadu, India

Services

Project Manager,Construction Manager

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Summary:

Qualified Civil Engineer having exposure to construction supervision and construction management includes quality control for the construction of major infrastructures such as Buildings, concrete dams, marine works, Roads, Highway projects, bridges and all kinds of piling works (sheet Piles, bore Piles, Contiguous piles, Secant piles, Shoring works, Anchoring works etc.), Diaphragm wall, soil treatment (vibro compaction),raft foundation including piling works for 55 floors multistoried commercial and residential building, Pipe lines (Storm water/Sewerage/Water line through open cut excavation and micro tunnel) Utilities related works. Have an overall experience of over 20 years in India, Oman, Qatar and United Arab Emirates all with reputed contractors and consultant. This broadly encompasses construction and project management, project planning, scheduling and monitoring, resource planning and liaison with clients, consultants, contractors and site reconnaissance, quantity surveying, material testing, quality control and quality assurance, implementation of safety plan and risk assessments, identifying and computing the extra items, drafting and project reports etc.

Work History

CONSTRUCTION MANAGER

Gulf Petro Chemical Services & Trading.LLC

May 2011 - April 2013

PROJECT LOCATION MUSCAT, OMAN.
PROJECT UNDERTAKEN Bousher Waste water scheme project, Contract.2

Responsibilities
● Responsible to organize the overall execution and safety & quality standards
● Ensure the relevant permissions/NOCs are available and valid for the work on hand
● Ensure the compliance to the Method statement and the client's procedures and relevant specifications.
● Ensure and implement the necessary manpower and equipment to the team to carry out the construction activities.
• To organise the engineering department and to ensure the timely availability of construction information for all departments at a zero defect.
• Optimisation of all resources with a view to control cost and maximizes productivity
• Provide technical guidance to the site, and resolve critical site issues.
• Own the project programme and ensure timely delivery in terms of cost, specifications, and client satisfaction.
• Achieve milestone dates.

Project cost: Fifty millions omani riyal.

Scope of Works: construction of lifting stations, sewer pipe line net works and to connect the properties through open cut excavation and Microtunnels.

Micro tunneling: For the sewer lines with depth of more then seven metres to twelve metres
connecting with deep polycrete manholes.
Laying of GRP pipes of dia varying from 300 mm to 1400mm to connect with HDPE Manholes. Construction of Storm drain Channel, road gullies etc.
Construction of irrigation main lines and laterals with required number of washout, air valve, and flow meter chambers for the plantations of the city.

And all type of reinstatement works.

CONSTRUCTION MANAGER

BURHAN INTERNATIONAL CONSTRUCTION CO

January 2010 - March 2011

PROJECT LOCATION DOHA, QATAR.
PROJECT UNDERTAKEN STORM WATER NETWORK, SEWARAGE LINE
NETWORK (OPEN CUT AND MICROTUNNEL)
AND WATER PIPE LINE NETWORK. WITH
DEVELOPMENT OF ROADS.


Role Objective
• To provide a safe working environment for all employees, including subcontractors, suppliers, clients and visitors.
• Own the project programme and ensure timely delivery in terms of cost, specifications, and client satisfaction.
• Provide technical guidance to the site, and resolve critical site issues.
• To optimise utilisation of men, material, equipment and staff.
• Be completely accountable for development, motivation and assessment of supervised staff and labour resources.
• Manage, improve and build relations with Clients, and consultants and have the ability to accept and promote change for favourable business gains.
• Control and direct the work of all site based operations
• Close coordination with all departments to ensure uninterrupted progress on site
• Optimisation of all resources with a view to control cost and maximizes productivity
• To achieve a 'right first time' philosophy on site
• Own the project programme and ensure timely delivery in terms of cost, specifications, and client satisfaction.

CONSTRUCTION MANAGER

DUTCO BALFOUR BEATTY LLC

January 2008 - December 2009

UAE
PROJECT UNDERTAKEN CONSTRUCTION OF BRIDGE ACROSS
EXPRESSWAY AND DRYDOCK MARINE
INFRASTRUCTURES


Role Objective
• To organise the engineering department and to ensure the timely availability of construction information for all departments at a zero defect.
• Achieve milestone dates.
• Consolidate a reputation for innovative engineering, technical expertise and professionalism.
• Achieve zero defects in works and that of subcontractors
• Champion the culture of continual improvement particularly with regard to safety, quality and best practice.


Key Responsibilities
• Direct work sequencing to expedite project delivery.
• Ensure all technical information is available when required for the delivery of design and/or construction.
• Participates in the planning and formulation of design alternatives and solutions for major construction projects; provides conceptual estimates, feasibility studies, and cost estimates, and may coordinate the production of basic design plans and construction documents.
• Application of engineering principles in the preparation of calculations/drawings/sketches and resolution of engineering challenges within specific knowledge areas.
• Implementing engineering systems, documentation and controls by compliance with Health & Safety legislation, Company and industry Standards.
• Monitor subcontracts and subcontractors
• To direct and supervise planning and construction activities on site
• Have in-depth knowledge and understanding of various engineering disciplines including planning, QS, QA/QC, materials, plant and equipment, formwork, false work, scaffolding and shoring.
• To promote forward thinking and strive for engineering excellence.
• Motivate train and retain the best engineering staff
• Create a working environment that recognises and develops engineering talent
• Create a challenging and harmonious working atmosphere.
• Set SMART objectives for self and for the construction team.
• To be seen as an ambassador for the company...

Qualifications & Certifications

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?