Hussain - Socioligist - New Delhi, DL, India

Nasir Hussain

New Delhi, DL, India

Services

Socioligist

Work History

Social Development Specialist/Gender Specialist

Shah Technical Consultants Pvt. Ltd.

From November 2013

Location: Bhagalpur, Gaya, Muzaffarpur and Darbhanga

Client: Bihar Urban Infrastructure Development Corporation Ltd.

Main Project Features: Water Supply components include River Intake, Water Treatment Plant (including site filling and river protection works), Pumping Mains, and Overhead Reservoirs; distribution pipelines and consumer water meters.

Activities Performed:

Supervise and ensure timely implementation of Gender Action Plan of Water Supply and Sewerage subproject. Collect baseline data and monthly update on its implementation and prepare city level progress report in the prescribed format of the PMC.

Social Safeguard Specialist

Shah Technical Consultants Pvt Ltd

From November 2012

Name of Assignment or Project: Assam Urban Infrastructure Project (ADB Funded)
Location: Guwahati and Dibrugarh

• Prepare and implement ADB compliant resettlement plans related to all subprojects based on the approved framework.
• Organize workshops and community consultation during design and implementation phase.
• Carryout all required baseline surveys.
• Prepare due diligence report, sub project appraisal report, Resettlement Plan , RRP ,IPP and IPPF etc in accordance with ADB safeguard policies 2009.
• To ensure that all social safeguard documents (RP, IPPs) are approved by ADB, finalized, disclosed and implemented and to confirm that safeguard requirements are included in the bid documents and contracts. Prior to civil works, to ensure that EA has paid all compensation/relocation entitlements to affected persons in sections ready for construction.
• To ensure that PIUs submit monthly social monitoring reports. Based on review of monitoring reports, prepare corrective action plans, as necessary. Consolidate all monthly reports into semi-annual reports and submit to ADB.

Carrying out above activities for following components of Water Supply Subproject:

WATER SUPPLY:
(i) River Intake, (ii) Water Treatment Plant (WTP), (iii) Pumping Mains, (iv) Service Reservoirs, and (v) Associated Works, (vi) Distribution Pipelines and (vii) Supply of Water Meters

DRAINAGE:
(i) Desilting and Lining of the Town Protection Dyke Drain; (ii) construction of Household Drains, Internal Common Drains, and Roadside Drains; and (iii) Sluice Gates; (v) Main Outlet Channel and Beel area improvement with allied works; and (vi) Secondary Drainage

SOLID WASTE MANAGEMENT:
(i) Construction of Treatment and Disposal Site

SEWERAGE:
(i) Collection System; (ii) Pumping Stations and allied works; and (iii) Sewer Treatment Plant (STP)

SLUM IMPROVEMENT:
URBAN TRANSPORT

Ministry of Road Transport and Highways

From August 2010

Name of Assignment or Project: Preparation of Detailed Project Report for Rehabilitation and Upgrading to 2 lanes/2 lane with paved shoulders configuration and strengthening of Nauparha - Bango Munda Section (km 90 to km 158) of NH-217 in Orissa (World Bank Funded)
Year: Aug 2010 - Ongoing
Location: Titlagarh, Orissa
Client: Ministry of Road Transport and Highways
Main Project Features: Rehabilitation and Upgrading to 2 lanes/2 lane with paved shoulders configuration and strengthening of Nauparha - Bango Munda Section.
Position Held: Manager (Social Development)
Activities Performed: Work included
• Feasibility studies and detailed project design
• Develop tools for census and socio-economic study.
• Census & socio-economic study of likely affected household.
• Identification & assessment of NGO's in the concern area.
• Recruit & impart training to local enumerators for conducting survey.
• Collection and Review of secondary data from various sources for preparation socio-economic profile of the project area.
• Organize public meetings/Focused Group Discussions with the project affected person.
• Organize stakeholder consultations with concerned Govt. officials, NGOs and other local bodies.
• Identify critical stretches and suggest appropriate mitigation measures.
• Review the national and State Policies on Rehabilitation & Resettlement
• Prepare income restoration plan for project affected persons.
• Analysis of impact on focused Group like Gender specific, tribal and other deprived groups
• Data Analysis & Report Writing.
• Coordination between the Engineering, Environment & Social Departments to Rationalize the Resettlement Plan.
• Prepare Resettlement Plan with special focus on vulnerable population (SCs, STs, Aged, WHH, PH etc)
• Supervision & implementation of Rehabilitation plan.

Public Health Engineering Department

From June 2010

Name of Assignment or Project: Consultancy services for a Feasibility Report for Water Supply and Sewerage System in Ajmer and Pushkar Towns
Year: Jun 2010 - Ongoing
Location: Rajasthan
Client: Public Health Engineering Department (PHED), Rajasthan
Main Project Features: Design horizon-Year 2021 & 2039, Existing Population-4.85 Lakhs, Area Coverage 2021: 350 Sq. Km, Present Domestic Users: 90,798, Present Industrial Users: 917, Present Commercial Users: 2787, Length of Existing WS System: 2400 KM, Length of Sewage System: 115 KM, No of Surface Water Sources: One at Bisalpur Dam, No. & Capacity of WTP: 1 No. - 132 MLD at Kekri, 1 No. - 132 MLD at Kekri (Under Construction), No. of Sewerage Treatment Plants: 1 No. - 20 MLD at Khanpura
For Pushkar - Design horizon-Year 2021 & 2039, Existing Population-0.15 Lakhs, Area Coverage 2021: 75 Sq. Km, Present Domestic Users: 7798, Length of Existing WS System: 100 KM, Length of Sewage System: 10 KM, No of Ground Water Sources: 26 Tube Wells.

Position Held: Manager (Social Development)
Activities Performed: Work included
• Feasibility studies and detailed project design
• Develop tools for census and socio-economic study.
• Census & socio-economic study of likely affected household.
• Identification & assessment of NGO's in the concern area.
• Recruit & impart training to local enumerators for conducting survey.
• Collection and Review of secondary data from various sources for preparation socio-economic profile of the project area.
• Organize public meetings/Focused Group Discussions with the project affected person.
• Organize stakeholder consultations with concerned Govt. officials, NGOs and other local bodies.
• Identify critical stretches and suggest appropriate mitigation measures.
• Review the national and State Policies on Rehabilitation & Resettlement
• Prepare income restoration plan for project affected persons.
• Analysis of impact on focused Group like Gender specific, tribal and other deprived groups
• Data...

Uttarakhand Urban Sector Development Investment Program

UUSDIP

January 2009 - October 2012

Location: Dehradun
Client: Uttarakhand Urban Sector Development Investment Program
Main Project Features: Water Supply components include River Intake, Water Treatment Plant, Transmission mains, Distribution system.
Position Held: Manager (Social Development)
Activities Performed: Work included
• Feasibility studies and detailed project design
• Develop tools for census and socio-economic study.
• Census & socio-economic study of likely affected household.
• Identification & assessment of NGO's in the concern area.
• Recruit & impart training to local enumerators for conducting survey.
• Collection and Review of secondary data from various sources for preparation socio-economic profile of the project area.
• Organize public meetings/Focused Group Discussions with the project affected person.
• Organize stakeholder consultations with concerned Govt. officials, NGOs and other local bodies.
• Identify critical stretches and suggest appropriate mitigation measures.
• Review the national and State Policies on Rehabilitation & Resettlement
• Prepare income restoration plan for project affected persons.
• Analysis of impact on focused Group like Gender specific, tribal and other deprived groups
• Data Analysis & Report Writing.
• Coordination between the Engineering, Environment & Social Departments to Rationalize the Resettlement Plan.
• Prepare Resettlement Plan with special focus on vulnerable population (SCs, STs, Aged, WHH, PH etc)
• Supervision & implementation of Rehabilitation plan.

UP / Manager (Social)

SNC-Lavalin Infrastructure Pvt. Ltd

January 2007 - October 2012

India
Census and socio-economic survey, public and stakeholder consultations, site visits, status reports, LAP, RP, implementation & compensation.

Manager (Social Development)

SNC-Lavalin Infrastructure Pvt. Ltd.

January 2007 - October 2012

Location: Rajasthan

Client: Project Director, Rajasthan Urban Infrastructure Development Project

Main Project Features: Infrastructure development in the sectors of water supply, sewerage and drainage, solid waste management, city roads and transport and other infrastructure related to heritage, medical, fire-fighting alongwith tourism development in the cities of Churu, Sikar, Nagaur, Jaisalmer and Barmer.

Activities Performed: Work included

• Feasibility studies and detailed project design
• Develop tools for census and socio-economic study.
• Census & socio-economic study of likely affected household.
• Identification & assessment of NGO's in the concern area.
• Recruit & impart training to local enumerators for conducting survey.
• Collection and Review of secondary data from various sources for preparation socio-economic profile of the project area.
• Organize public meetings/Focused Group Discussions with the project affected person.
• Organize stakeholder consultations with concerned Govt. officials, NGOs and other local bodies.
• Identify critical stretches and suggest appropriate mitigation measures.
• Review the national and State Policies on Rehabilitation & Resettlement
• Prepare income restoration plan for project affected persons.
• Analysis of impact on focused Group like Gender specific, tribal and other deprived groups
• Data Analysis & Report Writing.
• Coordination between the Engineering, Environment & Social Departments to Rationalize the Resettlement Plan.
• Prepare Resettlement Plan with special focus on vulnerable population (SCs, STs, Aged, WHH, PH etc)
• Supervision & implementation of Rehabilitation plan.

(DPR) and Project Implementation Management of Godavari Riverfront Development and Beautification

JNNRMU Funded

July 2007 - May 2009

Name of Assignment or Project: Consultancy services for Preparation of Detailed Project Report (DPR) and Project Implementation Management of Godavari Riverfront Development and Beautification (JNNRMU Funded)
Year: Jul 2007 - May 2009
Location: Nashik, Maharashtra
Client: Nashik Municipal Corporation
Main Project Features: To prepare a DPR for Urban Renewal, decongestion, Heritage Conservation, River Front Development, Ghat Improvement & Beautification for the city of Nasik under JNNURM Scheme.
Position Held: Manager (Social Development)
Activities Performed: Work included
• Feasibility studies and detailed project design
• Develop tools for census and socio-economic study.
• Census & socio-economic study of likely affected household.
• Identification & assessment of NGO's in the concern area.
• Recruit & impart training to local enumerators for conducting survey.
• Collection and Review of secondary data from various sources for preparation socio-economic profile of the project area.
• Organize public meetings/Focused Group Discussions with the project affected person.
• Organize stakeholder consultations with concerned Govt. officials, NGOs and other local bodies.
• Identify critical stretches and suggest appropriate mitigation measures.
• Review the national and State Policies on Rehabilitation & Resettlement
• Prepare income restoration plan for project affected persons.
• Analysis of impact on focused Group like Gender specific, tribal and other deprived groups
• Data Analysis & Report Writing.
• Coordination between the Engineering, Environment & Social Departments to Rationalize the Resettlement Plan.
• Prepare Resettlement Plan with special focus on vulnerable population (SCs, STs, Aged, WHH, PH etc.)
• Supervision & implementation of Rehabilitation plan.

Main Project Features

Name of Assignment or Project: Preparation of Feasibility Reports, Detailed Designs & DPRs for Various National Highways / Roads Projects in India
Year: 2007-to date
Location: Various
Client: NHAI / Local Bodies
Main Project Features: Involved in the following projects;

ADB Funded

From February 2006

Location: Srinagar, Jammu and Kashmir
Client: PMU, Economic Reconstruction Agency, Jammu & Kashmir
Main Project Features: Rehabilitation/reconstruction/construction of about damaged/weak/missing link bridges & rehabilitation & upgrading of about 1500 km state/district/valley road in 14 districts of Jammu & Kashmir. The length of project road is 456 kms (approx.) and comprising 19 bridges for design and supervision, plus 9 bridges for proof checking and construction supervision. A 55 m bridge (steel structure) on the river Indus at Leh has also been proposed
Position Held: Manager (Social Development)
Activities Performed: Work included
• Feasibility studies and detailed project design
• Develop tools for census and socio-economic study.
• Census & socio-economic study of likely affected household.
• Identification & assessment of NGO's in the concern area.
• Recruit & impart training to local enumerators for conducting survey.
• Collection and Review of secondary data from various sources for preparation socio-economic profile of the project area.
• Organize public meetings/Focused Group Discussions with the project affected person.
• Organize stakeholder consultations with concerned Govt. officials, NGOs and other local bodies.
• Identify critical stretches and suggest appropriate mitigation measures.
• Review the national and State Policies on Rehabilitation & Resettlement
• Prepare income restoration plan for project affected persons.
• Analysis of impact on focused Group like Gender specific, tribal and other deprived groups
• Data Analysis & Report Writing.
• Coordination between the Engineering, Environment & Social Departments to Rationalize the Resettlement Plan.
• Prepare Resettlement Plan with special focus on vulnerable population (SCs, STs, Aged, WHH, PH etc.)
• Supervision & implementation of Rehabilitation plan.

Town of Rajamundry

May 2006 - December 2007

AP (DFID, UK Funded)
Year: May 2006 - Dec 2007
Location: Rajamundry, Andhra Pradesh
Client: Andhra Pradesh Urban Services for the Poor (APUSP)
Main Project Features: To assess the existing water supply at Rajamundry and develop the operations plan to improve the system performance immediately, and also identify further actions on long term basis for rehabilitation, extension and improvement including augmentation of source of the water supply system.
Position Held: Manager (Social Development)
Activities Performed:
• Feasibility studies and detailed project design
• Develop tools for census and socio-economic study.
• Census & socio-economic study of likely affected household.
• Identification & assessment of NGO's in the concern area.
• Recruit & impart training to local enumerators for conducting survey.
• Collection and Review of secondary data from various sources for preparation socio-economic profile of the project area.
• Organize public meetings/Focused Group Discussions with the project affected person.
• Organize stakeholder consultations with concerned Govt. officials, NGOs and other local bodies.
• Identify critical stretches and suggest appropriate mitigation measures.
• Review the national and State Policies on Rehabilitation & Resettlement
• Prepare income restoration plan for project affected persons.
• Analysis of impact on focused Group like Gender specific, tribal and other deprived groups
• Data Analysis & Report Writing.
• Coordination between the Engineering, Environment & Social Departments to Rationalize the Resettlement Plan.
• Prepare Resettlement Plan with special focus on vulnerable population (SCs, STs, Aged, WHH, PH etc)
• Supervision & implementation of Rehabilitation plan.

National Highways Authority of India

1. Consultancy services conducting Feasibility Study and preparation of Detailed Project Report four/six laning of NH-44 from Meghalaya/Assam Border to Assam/Tripura Border, Assam. Client: National Highways Authority of India, Length - 116 km, Project Cost: Rs.4600 million
2. Consultancy Services for Preparation of Feasibility-Cum- Preliminary Design and Financial consultancy for implementation of Ring Road around Dehradun City in the State of Uttarakhand Under NHDP Phase VII; Length: 110 km, Project Cost (Approx) Rs 8789 million.
3. Consultancy services for conducting feasibility study and preparation of preliminary design for 4/6-laning of Goa - Karnataka Border-Kundapur section on NH-17 (NHAI/DBFOII/DPR/01) to be executed as BOT (Toll) project on DBFO pattern under NHDP including a tunnel of 2.5 Km in length., Length: 192 km, Project Cost: Rs.6000 million
4. Consultancy services for preparation of Detailed Project Report (DPR) for (i) Improvement of Alignment of Thopurghat stretch (ii) Construction of Half Flyover at Kamalapuram junction in the state of Tamil Nadu, Length: 3 km, Project Cost: Rs.1100 million
5. Consultancy services for preparation of Detailed Project Report for 4/6-laning of Cuddapah-Mydukur Kurnool section on NH-18 in the State of Andhra Pradesh., Length: 189 km, Project Cost: Rs.15850 million
6. Consultancy services for preparation of Feasibility-Cum-Preliminary Design Report for 6-lane Delhi - Meerut Expressway including 14/16-laning of NH-24 from Dasna to starting Hapur Bypass (km. 28.00 to km. 49.00) and NH-58 from km. 8.00 (Delhi-UP Border) to km. 52.250 starting (Meerut Bypass) (Project Length: 151.35 km.) in the State of Uttar Pradesh under NHDP Phase - VI on BOT (PPP) basis. Client: National Highways Authority of India, Project cost: (Approximate) Rs.8500 million
7. Consultancy Services for Feasibility and Preparation of Detailed Project Report for flyovers at four junctions on NH-47, Cochin at Edapally, Palarivattom, Vytilla and...

Manager (Social Development)

National Highway Authority of India

2. Consultancy Services for preparation of Detailed Project Report for rehabilitation and up gradation of Ner Chowk-Manali (Project length: 117 km) section of NH-21 under NHDP-IVB in the State of Himachal Pradesh. Client: National Highway Authority of India.
3. Consultancy service for preparation of Feasibility for 6-laning of NH-2 from Panagarh-Dhankuni, including Panagarh Bypass in West Bengal DBFO Pattern under NHDP Phase-V (Lot-3). Client: National Highway Authority of India, Length: 135 km, Project Cost: Rs.6075 million.
4. Consultancy services for conducting feasibility study and preparation of preliminary design for 4/6-laning of Goa - Karnataka Border-Kundapur section on NH-17 (NHAI/DBFOII/DPR/01) to be executed as BOT (Toll) project on DBFO pattern under NHDP. Client: National Highway Authority of India, Length: 192 km, Project Cost: Rs.6000 million.
Position Held: Manager (Social Development)
Activities Performed:
• Feasibility studies and detailed project design
• Develop tools for census and socio-economic study.
• Census & socio-economic study of likely affected household.
• Identification & assessment of NGO's in the concern area.
• Recruit & impart training to local enumerators for conducting survey.
• Collection and Review of secondary data from various sources for preparation socio-economic profile of the project area.
• Organize public meetings/Focused Group Discussions with the project affected person.
• Organize stakeholder consultations with concerned Govt. officials, NGOs and other local bodies.
• Identify critical stretches and suggest appropriate mitigation measures.
• Review the national and State Policies on Rehabilitation & Resettlement
• Prepare income restoration plan for project affected persons.
• Analysis of impact on focused Group like Gender specific, tribal and other deprived groups
• Data Analysis & Report Writing.
• Coordination between the Engineering, Environment & Social Departments to Rationalize the Resettlement Plan.
•...

Manager (Social)

STUP Consultants Pvt. Ltd

April 1994 - December 2006

India Census and socio-economic survey, public consultations, site visits, status reports, LAP & RP.

Main Project Features

April 1994 - December 2006

Name of Assignment or Project: Preparation of Feasibility Reports, Detailed Designs & DPRs for Various National Highways / Road Projects in India
Year: Apr 1994 - Dec 2006
Location: Various
Client: NHAI / Local Bodies
Main Project Features: Worked on the following projects;
1. Consultancy Services for preparation of Feasibility and Detailed Project Report for 4/6 laning of Bareilly-Sitapur Section of NH-24 under NHDP Phase III (Lot V Group-F Package No. NHDP-III/DL5/17), Client: National Highways Authority of India, Length: 153 km
2. Consultancy Services for feasibility study and Detailed Project Report for Rehabilitation and upgrading of Existing Road to 4-lane divided Carriageway Configuration from km 0.00 to km 70.00 on NH-80 in Mokameh-Mungher section, Bihar., Client: National Highways Authority of India, Length: 70 km
3. Feasibility, Detailed Design and Construction Supervision of State Highway and Rural Access Roads under West Bengal Corridor Development (ADB Loan No.1870-IND)., Client: PWD (Roads), Government of West Bengal, Length: 150 km
4. Consultancy Services for Detailed Engineering Design for widening of existing 2- lane to 4- lane divided Road from Km.258.645 (i.e. End of Namakkal Bypass) to Km.292.600 (i.e. Start of Karur Bypass) plus an Improvement, O & M Stretch from Km.248.625 (i.e. Start of Proposed Namakkal Bypass) to Km.258.645 (i.e. end of Namakkal Bypass), Client: NK Toll Road Limited, Mumbai, Length: 43 km

Director General Road Development Ministry

Uttar Pradesh / Uttranchal Border

5. Consultancy services for preparation of Feasibility & Detailed Project Report for rehabilitation and strengthening of existing 2 - lane road and widening to 4/6 lane dual carriageway configuration of -Km 152/0 to Km 219/0 (NH-58) & Km 144/0 to Km 196/800 i.e. Junction with NH-58 (NH -72) (Uttar Pradesh / Uttranchal Border to Dehradun in the State of Uttranchal, India), Client: Director General Road Development Ministry of Road Transport & Highway, New Delhi, Length: 119 km
6. Consultancy Services for Detailed Engineering Design for Highway Package: Thrissur - Angamali - Edapalli Section of NH-47 (Km.270 - 342) in Kerala State on BOT Basis, Client: Guruvayoor Infrastructure Private Limited, Length: 65 km
7. Consultancy services for Preparation of Detailed Design (Detailed Project Report) for strengthening provision of paved shoulders and upgrading to 2/4 lane carriageway configuration of road Transportation linkage Networks to Tuticorin port and preparation of feasibility report for long term needs, - Access Road, Client: National Highways Authority of India, Length: 91 km
8. Consultancy Services for preparation of Engineering designs and Detailed Project Report for Rehabilitation of 2 lane & 4 lane High/ Medium Density Corridor Roads in South Zone - Bangalore City, under Karnataka Municipal Reforms Project, Client: Bangalore Mahanagara Palike, Length: 44
9. Consultancy Services for Detailed Design (Detailed Project Report) for Port Connectivity Highway project (2 lane of 7.4 km and 4-lane of 3.8 km) including PSC flyover, RCC bridge, culvert and road embankment in Vishakhapatnam, AP, Client: National Highway Authority of India / Vishakhapatnam Port Trust, Length: 11.2 Km
10. Consultancy Services for preparation of Detailed Project Report for 4 lane Hi-tech city corridor in between Outer Ring Road & Hosur Road., Client: Bangalore Development Authority, Length: 8.42
11. Consultancy services for preparation of Feasibility study for 6-laning of NH-8 from...

Qualifications & Certifications

Sociology

Lalit Narayan Mithla University

National Institute of Management

Sociology

Lalit Narayan Mithla University

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?