Sanitary Engineer IV

Defence Construction Enterprise Addis Ababa Ethiopia

June 2012 - July 2013

Cost estimation of different project of building and real estate constaction, fixing unit rate

Site Engineer

Arsi Robe, Ethiopia

January 2011 - December 2011

2011
Responsible for the design & construction supervision of a large water supply project in Oromiya Regional State arsi Zone ( 9 Woredas ) water supply project from 3 collected springs and bore hole ( Ameraba Indato water supply project) it is single and the largest water supply project in the region. This project involves the feasibility, pre-design, detailed draft design, BOQ, Drawing albums, Preparing Tender Documents of the potable water supply
Construction supervision facilities required to meet urban and rural area of the project water demand. Facilities include over 400km of supply and distribution lines, potable water reservoirs & various structures.
Collecting Surveying data's for the best economical route
Data collection concerning population distribution, water demand and land use categories of project area.
Utilising computerised hydraulic modelling software Water cad, AutoCAD, Global Mapper Arc view & GIS.
Design/drafting of the mechanical, architectural, and structural components of the Distribution & Transmission: Spring Capping Structures, Boreholes, Ponds, Cattle Troughs, Water Points, Reservoirs, Break Pressures, Collection Chambers(Wet Wells), Pump & Generator Houses, Opereter dweling, Manager dwelind, Guard House, VIP Latrine and valve chambers, etc.
To undertake the overall supervision and coordination activities of the project in the site

Resident Engineer

Assassa Ethiopia

January 2008 - January 2011

Design of water supply network using different soft ware
Supervision work for construction of all water supply network (main, secondary and private connections).
BOQ preparation
Checking and certification of contract payment.
Collecting Surveying data's for the best economical route.
Data collection concerning population distribution, water demand and land use categories of project area.
Utilising computerised hydraulic modelling software Water cad, AutoCAD, Global Mapper Arc view & GIS
WORKMANSHIP QUALITY
To provide order, advice and also make discussion at various levels with the objective of creating conducive environment for the best out come of the results; working in collaboration with contractor's construction staffs at site; has developed the norms for quality guard & effectiveness of the construction team as a whole.

SURVEYING WORK
Checking of pipeline route setting-out, alignment, & profile work.
Collection & organization of surveying data for future reference.
Fixing and checking of design bed level for construction of pipe lines.
Checking of bedding works.

OFFICE WORK
Documentation of site documents & data.
Approval of the weekly plan of the contractor.
Payment approval for the month.
Provision of work order for contractor Approval of the daily and weekly reports of the contractor.
Discussion with Werede administrative bodies on how to facilitate the activities.
Revise profile drawings of the contract to meet actual site condition and minimize constraints during construction.
And other relevant office works.

Projects

Hinja burkitu water supply project,Ameraba Indato water supply project

Oromia Water Works Design and Supervision Enterprise, Assassa Ethiopia
Resident Engineer, 2008 - 2011


HINJA BURKITU WATER SUPPLY PROJECT

The project area is situated at a distance of about 250km from Addis Ababa. Geographically, the project is located at 39013’-39023’E and 7009’-7018’N and has altitude range of 2600 - 2700m amsl.

This project consists of construction of one 500m3, one 300m3, three 10m3 break pressure tanks, 107 water points, 20 cattle troughs, 10km rising main (from boreholes to reservoirs), about 130km distribution net work, auxiliary buildings (office, store & work shop), access road and camp construction. Armena, Horra, Hinja Ela, Hinja Kongiti, Hinja Burkitu, Negele Sigalo, Kakawa and Ensemana kebeles in Gedeb Asasa Woreda and Hargisa Kebele in Limu and Bilbilo Woreda are gandas expected to be served from this project.


Oromia Water Works Design and Supervision Enterprise, Arsi Robe, Ethiopia
Site Engineer, 2011

Ameraba Indato water supply project

The project area is situated at a distance of about 225 km South-East of Finfinne along the Finfinne –Arsi-Robe road. Geographically, the project is located at 7030’_ 7056’N and longitude 39033’ _ 40003’E and has an altitude range of 2308.55 - 2816.7 masl.

Responsible for the design & construction supervision of a large water supply project in Oromiya Regional State arsi Zone ( 9 Woredas ) water supply project from 3 collected springs and bore hole it is single and the largest water supply project in the region. This project involves the feasibility, pre-design, detailed draft design, BOQ, Drawing albums, Preparing Tender Documents of the potable water supply
Construction supervision facilities required to meet urban and rural area of the project water demand. Facilities include over 400km of supply and distribution lines, potable water reservoirs & various structures.


Defence Construction Enterprise Addis Ababa Ethiopia from June 25, 2012 to present

Sanitary Engineer IV

Cost estimation of different project of building and real estate contraction, fixing unit rate and approving all issue related with sanitary work coming from site.

Qualifications & Certifications

Hydraulic and Water Resource Engineer

Arba Minch University

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×