Services

Data Entry, Online Surfing, Cricket Playing, Eating and Learning

Work History

Presently Working in Rishi Engineer and Contractors as an Instrument Engineer at Site

Shree Mega Power Project, of SHREE CEMENT LIMITED

From March 2011

➢ As an Instrument Engineer Having more than 2.6 Year Experience in Operation and Maintenance of Thermal Power Plant Instrument.
➢ Presently Working in Rishi Engineer and Contractors as an Instrument Engineer at Site (2 x 150MW) Shree Mega Power Project, of SHREE CEMENT LIMITED, BEAWAR From March 2011.
➢ Experienced in Installation, Calibration, Troubleshooting, Maintenance and Testing of numerous process control equipments such as Temperature, Flow, Level and Pressure Transmitters, Control Valves, Sensors & Gauges.
➢ Knowledge of operation and maintenance of different type of gas analyzers i.e. Oxygen, SPM, SOX/NOX and CO.
➢ Experienced in AC drives (VFD) operation of ABB, INVT and HARVEST.
➢ Understanding control room systems, DCS & PLC Erection, Program and software installation of Engineering and Operating station, inter panel wiring & system layout, loop checking Cable laying from DCS panel to FIELD instrument jb's.
➢ Experience with DCS (Emerson OCR400) for 2 X 150 MW plant & PLC automation, Logic Development, Graphics Development, AMS Installation, History Server Installation, OS Installation, Report Manager, I/O Panels Erection & Commissioning, Smart Transmitters, VFDs, Control Valves & actuators, Gauges, Switches, Thermocouple (K-type), RTD (PT-100), Solenoid valves etc.

POST

From March 2011

INST. ENGINEER

Thermal Power plant of Shree Cement Ltd

From March 2011

Since March, 2011 Working in Rishi Engineer and Contractors as an Instrument Engineer with more than 2.6 years of experience at Site:- (2 x 150MW) Thermal Power plant of Shree Cement Ltd, Beawar

INST. ENGINEER
(Control & Instrumentation)


ACEDEMIC CREDENTIALS:-
S. No Examination Institute/College University/Board Year Percentage
1 B.Tech. Geetanjali Instutute of Technical Studies Rajasthan Technical University, Kota (Raj) 2010 65.40%
2 Sen. Secondary Govt. Guru Govind Sr. Sec. School RBSE 2006 57.08%
3 Secondary Govt. Guru Govind Sr. Sec. School RBSE 2004 71.33%


KEY PERFORMANCE AREAS:
➢ Execution of instrumentation work at site as per approved drawings & documents.
➢ Performing functions of troubleshooting & breakdown/preventive/shutdown maintenance for bringing down process control instruments downtime to a minimum level.
➢ Preparing maintenance schedules, conducting regular tests to ensure the performance capacity of various process control equipments.
➢ Endurance to handle site related issues pertaining to technology, people & process.
➢ Follow-up the planning & the requirements.
➢ Maintenance and trouble shooting of DCS (Input/Output Devices, DI/DO/AI/AO Boards, Backup Units).
➢ Preparation and Execution of Daily, Weekly, Monthly and Major Shutdown and Preventive Maintenance.

Qualifications & Certifications

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?