Nicolas - Material Planner - Riyadh, Riyadh Province, Saudi Arabia

Narciso Nicolas

Riyadh, Riyadh Province, Saudi Arabia

Services

Material Planner

Summary:

Material Controller

Work History

Material Controller Supervisor

Taganito Piping Construction Project

July 2011 - November 2011

Surigao del Norte through Nihon Overseas Co., LTd.
Material Controller Supervisor
● Supervision of Incoming and Out-going Piping Material
● Receives and Inspects all Materials, Compared and Identify if correct based on packing list.
● Supervision of issuing the Piping Materials for pipeline installation
● Checking and inspection of Damage material, OS & D Coverage, Shortage, Damage report and be submitted to material Dept. Manager

Material Controller

South Nemba Platform

From September 2009

Job Description:

● Supervision of Storing in Issuing of Piping, Instrument, Steel Structure Materials.
● Receives and Inspects all Materials Compare and Identify Materials if correct based on packing list.
● Responsible to issue the Material needs to Construction, Review / checking of Material Request Slip (MRS). Insure Materials are correct before issuing to Construction.
● Responsible for Inventory of Materials every month.

On Going Project:
● South Nemba Platform HP Compressor HUC Project Luanda, Angola Africa.

Name of Client:
● Chevron

Material Controller (Supr)

LNG QG

October 2007 - September 2008

Job Description:
● Supervision and issuing Steel Structure Materials.
● Receives and Inspects all Materials, Compared and Identify the Materials if correct based on packing list.
● Organized and follow-up of OS&D (Overage Shortage Damaged) submit reports to Material Dept. Manager.
● File coding and familiarize all Materials.
● Responsible to issue the Materials need to construction: Review / check the Materials request Slip (MRS) ; Ensure that Materials are correct before issuing to Construction.

On Going Project:
● Construction of LNG process train 6 & 7 which include steel structure erection. Pipe
Fabrication and pipe erection for Oil and Gas Ras Laffan III LNG Project, Ras laffan
(Qatar)
Name of Client:
● Qatar Gas

Material Controller

Sakhalin Region

May 2005 - September 2007

Responsibilities:
● Receive and Inspect Material together with the Q.C. Engineer and Vendor.
● Coordinate and provide supplies to foremen for immediate material needs.
● Established the system that will ensure accurate recording of all materials withdrawn from the warehouse, review Material Request Slip and ensures that the materials are correct before receiving.
● Responsible to check and report to OSD (overage, shortage, damaged) and submit to material manager.
● Recording and monitoring all material status on actual and computerization system.
● Provides support and general assistance to managers and co-workers.
● Perform other related work from time to time as well.

Project:
● Construction of LNG process train 1&2 which includes steel structure erection, pipe fabrication and pipe erection for Sakhalin II LNG Project, Sakhalin Region, and Russia.

Name of Client:
● Sakhalin Energy Investment Corporation/ Chiyoda- Toyo Sakhalin Development(CTSD)

Material Controller

Bushehr Province

March 2004 - February 2005

Responsibilities:
● Generates daily work report for all materials status.
● Receives and inspect all materials compared and identity the materials if correct based on packing list.
● Organized and follow up of OSD (overage, shortage, damaged) report add submit to Material Dept. Manager.
● Recording and monitoring all materials on actual and computerization system.
● Filling, coding and familiarization of all materials.
● Responsible for issuing the material needs to construction, review/ checking of Materials Request Slip; ensure that materials are correct upon issuing to construction.
● Provide and support general assistance to Managers, Supervisors and Co-Workers.
● Perform other duties assigned.
Project:
● (AONE Project, South Pars Field Development Phases 4&%) Onshore Gas Plant Facilities located in Assaluyeh Republic of Iran.
Name of Clients:
● ENI IRAN/AGIP

Material Controller

LNG Project

February 2003 - January 2004

Responsibilities:
● Generates daily monthly, summary work report for all materials.
● Coordinate to multiple suppliers to ensure timely deliveries.
● Receive materials and equipments through central receiving; inspection for any damage and compliance with purchase order; return materials to Vendors if any damage or non complying materials, notifies Shop Manager that project material has been received and compliance with specifications.
● Supervision in the implementation of material control procedures such as receiving storage, preservation and issuance of materials to be used in construction.
● Conducting periodical stock count and inventory reports and submit to Material Dept. Manager.
● Recording and monitoring all materials on actual and computerization system.
● Perform other related job assigned from time to time.

Dispatcher Maintenance Control

King Fahad Int'l Airport

October 1999 - December 2002

Responsibilities:
● Maintain all the equipments in the airport.
● Receives calls from the Airport Supervisor and order for us to call technicians for repairs.
● Preparing work orders.
● Encoding to the computer to close the work order.
● Prepare and submit the monthly report.

Material Controller

Water Supply System Project

December 1997 - December 1998

Responsibilities:
● Generates daily work report for all material status.
● Receives and inspect all materials, compare and identify the materials if correct based on packing list.
● Organize and follow up of OSD (overage, shortage, damaged) report add submit to Material Dept. Manager.
● Recording and monitoring all materials on actual and computerization system.
● Filling, coding and familiarize all materials.
● Responsible to issue material needs to constructions, review/ check the Materials Request Slip; ensure that materials are correct before issuing to construction.
● Provided and support general assistance to Managers, Supervisors and Co-Workers.
● Perform other duties and assigned.
Project:
● Great Man-made River Project in Sicialist Peoples Libyan Arab Jamahiriya.
Name Of Clients:
● Dong-Ah Consortium, Republic of Korea.

Analyst Maintenance Control

Operation & Maintenance

September 1995 - September 1997

Responsibilities:
● Updated and entered the monthly report to the computer.

Material Controller Specialist

Communication Engineering Squadron

July 1989 - December 1994

King Khalid Airbase (Khamis Mushayt K.S.A.)
Material Controller Specialist

Responsibilities:
● Receive the requestor for the materials needed.
● Checking of inventory done for the stock materials.
● Schedule due date materials for calibration.
● Issuing of materials needed in every department.
● Monthly inventory done.

Work control Specialist

Operation and Maintenance

November 1986 - November 1989

Responsibilities:
● Preparation under work request.
● Filing work order close.
● Preparing monthly report.
● Preparing monthly inventory.

Qualifications & Certifications

BSBA Major in Managements

Arellano University at pasig manila Phils

Tagaytay City high school at Tagaytay City

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more