Puthenpura - Welding Supervisor - New Delhi, DL, India

Narayanan Puthenpura

New Delhi, DL, India

Services

Welding Supervisor

Summary:

I have 30 years experience as welder/welding foreman/supervisor in piping &fabrication field

Work History

Offshore Welding Foreman

SAIPEM Eni Group

Projects:1) LIWAN DEEP SEA PROJECT 24 inch and thickness 27.9 mm INCONEL / SS316L CLAD PIPING DOUBLE JOINT WELDING (FULL TIG) IN SEMAC 1BARGE MANUALWELDING PROCESS TIG
2)BIEN DONG PROJECT 12 inch and thickness 20.6 mm / 17.3 mm with 3 mm CLADDING OF INCONEL / SS316L 20 KM Length(1635 joints) WELDING PROCESS PRESTO AND PASSO AUTO-WELDING WITH INTERNAL PLASMA WELDING

2. SAIPEM BASE IN NETHERLAND (2012 )
Client: - SAIPEM Eni Group
Designation: Welding Foreman / Welder Trainer.
Projects: WELDER TRAINING PROGRAMME for various PIPELINE BARGE.

Welding Foreman

AGIP KCO

November 2009 - December 2010

Projects: NORTH CASPIAN OPERATION ONSHORE PROJECT, KAZAKHSTAN.
Job Description:
• Maintain focus on HSE policy, and Quality Standards, ISO Requirements.
• Controlling welding Consumable as per W P S
• Handling Manpower, Arranging welders Quality and Quantity wise.
• Checking W P S co-ordination with QA/QC and NDT Department
• Preparing Daily Welding Reports, Verifying weld joint before and after welding

Welding Foreman

TECHNIP

August 2006 - October 2008

Projects: EQUATE OL2K PROJECT, SHOHAIBA, KUWAIT
Job Description:

• Supervise of all welding activates related in construction area and fabrication shop. Under ground and Above ground piping from ½" to up to 72" dia, In various type of materials (CS/SS/INCONNEL/ DUPLEX )
• Monitor the performance of welders during construction phase.
• Work with Project Management Team to ensure all work activities are carried out to construction work scope.
• Ensure daily toolbox and monthly safety meetings are conducted and recorded.
• Supervision of from the client side for piping, Construction activities related to welding.
• Issuance of punch list on defective or outstanding piping /Mechanical Completion work.

Welding Foreman

J G C

January 2005 - February 2006

Projects: SOHAR REFINERY PROJECT, SOHAR, MUSCAT, OMAN
Job Description:
• Daily monitor of sub contractor's performance, fabrication and welding activities, inspection of project materials
• Supervise all welding activities for Offsite piping (underground and above ground) and, 2km offshore piping.
• Manage a team of welders in meeting the desired output and quality.
• Verifies and checks if all individual items of plant have been installed and hooked up completely with all welded joints.
• Prepare WQT for welders
• Prepare and check the quantity and quality of the welding consumables to meet the requirement of projects;
• Ensure welding activities meet with, and integrate with the company's requirements for quality management, health and safety, environmental policies and general duty of care.

Welding Supervisor

PRO-MAN TECH

November 2003 - November 2004

Projects: ALBA Expansion .Phase 5.
Job Description:
• Co-ordinate and control of welding for fabrication and installation activities
• Maintain welding activities are in compliance to the company's procedures, work instructions, ITPs and WPS.
• Assessing and formulating welding procedures reports for specific job types
• Analyze, verify data and progress reports in accordance with project schedule
• Ensure welding activities are carried out in accordance with American Welding Society welding standards and client specification (as applicable) and other specified requirements.
• Maintain focus on HSE policy, and Quality Standards,

Welding Foreman

ARAMCO

November 2002 - March 2003

Projects: SAUDI ARAMCO, RAS TANURA REFINERY, SAUDI ARABIA
Job Description:
• Daily monitor of welders' performance, fabrication and welding activities, inspection of project materials.
• Maintain focus on HSE policy, and Quality Standards, project requirements.
• Handle technical clarifications; contribute in solving welding concerned problems.
• Organize or run Welding Procedure Qualifications Records as required including mechanical testing.
• Maintenance of welder qualifications and welding procedures.
• Attend meetings and contribute to production strategy and issues as required
• Assist in preparing final dossiers, review and maintain correctness and accuracy of certification

Welding Foreman

DODSAL P T E Ltd

November 2000 - September 2002

Projects: QATAR CHEMICAL PROJECT, QATAR
Job Description:
• Monitor the performance of welding activities in underground and aboveground piping in Ethylene / SRU/AGRU/ FARNACE /area
• Supervise and manage welding activities for piping/structural fabrication and erection works from conception to completion.
• Maintain focus on HSE policy, and Quality Standards.
• Monitor the performance of contractors during construction phase.
• Ensure welding activities meet with, and integrate with the company's requirements for quality management, health and safety, environmental policies and general duty of care.
• Ensure daily toolbox and monthly safety meetings are conducted and recorded.

Welding Foreman

M/s CHIYODA FOSTER WHEELER

September 1998 - May 2000

Projects: OMAN LNG (Train -I & Train II PROJECT, OMAN.
Job Description:
• Prepare Fabrication and Erection schedule in consultation with client and review the quality of welding work as per client procedure and project specification.
• Planning, execution, supervision, monitoring and control of all site activities related to welding in Erection/fabrication/and commissioning of system and sub system.
• Consult and liaise with management, supervisors, safety representatives and employees on all safety and environmental issues.
• Prepares routine work and time reports and maintains standard records.

Welding Foreman

DEWA POWER STATION

June 1992 - March 1997

Projects: DEWA POWER STATION (Auxiliary Boiler Waste Heat Recovery) PROJECT.
Job Description:
• Supervise and control of fabrication and installation activities.
• Maintain welding activities are Steam Piping, involved Diverter Flap, Boiler drum internal modification during the maintenance period
• Analyze, verify data and daily progress reports in accordance with project schedule.
• Manage upkeep and condition of all welding equipment held by the workshop.
• Experience with plasma cutting, Air-arc gauging, plate and pipe fabrication, TIG & SMAW welding.
• Assists other trades personnel as may be required for the purpose of supporting them in the completion of their work activities

Welding Foreman

11. SUMITOMA HEAVY INDUSTRIES LIMTED, QATAR

December 1991 - May 1992

Projects: RAS - ABU FUNTAS POWER &DISALNATION PLANT PROJECT, QATAR
Job Description:
• Responsible for the Construction activities related to Fabrication and Erection of Various Type of Piping, structural supports for tie-in work.
• Review layouts, blueprints, diagrams, or work orders in preparation for welding or cutting metal components.
• Attend coordination meetings with Senior supervisor , Superintendent
• Ensure that accurate calibration records are maintained for all welding machines, inspecting and testing instruments for use;
• Prepare daily welding inspection summary report;
• Prepare the weekly monitoring welder performance record and overall rejection rate;

Welder

12. LARSEN & TUBRO LIMTED

January 1991 - November 1991

-6G
Projects: CAPROLACTUM PROJECT
Job Description:
• Employed as a multi-coded welder working on all types of power stations and petrochemical plants.
• All work carried out to ASME IX standards, using TIG & MIG on all materials
• All work carried out to ASME IX standard using all processes of welding on all materials.
• All processes of welding on various materials.

Welder MIG, SMAW & TIG

ARAMCO

November 1989 - December 1990

Projects: SAUDI ARAMCO - REFINERY & GAS PLANT
Job Description:
• Working in various Gulf States consulting, producing & teaching various courses in pipeline & welding technology.
• Employed as a multi-coded welder working with construction and maintenance on onshore Installations. All work carried out to ASME IX standard using all processes of welding on all materials

Welder

ONGC

February 1985 - October 1989

-6G & 6GR.
Projects: ONGC - PRE FABRICATION & INSTALLATION
Job Description:
• Employed as a Welder in construction activities are Fabrication and Erection of offshore pipe spools and platform , Oil drilling Rig & Piles
• Working on gas and oil offshore platforms

Welder MIG, SMAW & TIG

15. MITSUBISHI HEAVY INDUSTRIES LIMITED

May 1983 - January 1985

Projects: KUWAIT -DOHA DESALINATION PLANT. KUWAIT.
Job Description:
• Employed as a multi-coded welder working on all types of power stations & water desalination plant.
• All work carried out to ASME IX standards, using TIG & MIG on all materials.( In Carbone steel , stainless steel , Cooper nickel , in conel)
• Performs related work as required.

Welder SMAW & TIG

16. HITACHI SHIP BUILDING & ENGINEERING CO, OMAN

February 1981 - March 1982

Projects: AL -GHUBRAH POWER & DESALINATION PLANT, MUSCAT
Job Description:
• Worked as a Welder related pre fabrication , Installation in construction area
• Using orbital and manual welding processes on various materials

Welder SMAW & TIG

17. UDHE INDIA LIMITED

July 1980 - January 1981

Projects: POLYCHEM PROJECT, INDIA.
Job Description:
• Worked as a welder for the prefabrication and installation various type of piping.
• Other responsibilities include: Repairing airport hanger doors and performing welding operations on airport automotive equipment,
• performing welding work required during the construction and repair

Welder LP&HP

18. KURUPP ENGINERRING COMPANY, INDIA Ltd

August 1978 - June 1980

Projects: HINDUSTAN PETROLIUM REFINERY, MUMBAI, INDIA
Job Description:
• Employed as a welder in Construction activities related to Fabrication of Various Type of Piping, Heavy structural steel fabrication, Auxiliary Boiler and including pipe supports.

Welder Trainer

PASSO SWS

about PASSOi have good experience i PASSSO&SWS in saipem Eni group in netherland Castoro6&indonesia SEMEC 1 in pipelaying barge

Qualifications & Certifications

pree-degree course compleated with physics,maths,&chemistry as main subject

calicut University kerala

Mechanical Engineering

Technical institute

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?