PPC, Operations , 5S , Kaizen , Method Study , Time Study , Plant Layout, Resource Optimisation .


PPC - Production planning and control.
Operations - It indicates all operations involved in production process to manufacture the final product.
5S - A technique which creates a good work place plan, better traceability, safe and smooth work flow and hence the good and safe working cultural working practice on a shop floor.
Kaizen - A technique of small improvements by involvement of manpower of all levels of working areas.
Time study , Method study - A process engineering technique which improves the process by eliminating the non productive elements and set the standard productivity norms.
Plan Layout - It is a systematic arrangement of manufacturing process/ operations by considering all process elements i.e. man,machine , material handling.

Work History

General Manager - Manufacturing

MKA Engineers & Exporters Pvt. Ltd

From December 2012

Key Result Areas:
• Heading &supervising a team of100 - 150personnel.
• Monitoring the complete production process for improving the quality & productivity rate.
• Looking after the resource allocation for streamlining operations
• Interfacing with customers for order delivery and quality related to issues
• Using various improvement techniques like Kaizen, 5S, Method Study, Time Study, Line Balancing, Jigs & Fixture and Press Tools for improving the quality processes
• Providing training to down line personnel for promoting new techniques and skills at all levels
• Assuring minimum downtime by implementing the preventive maintenance of all equipments on regular basis

Manager - Order Processing

Business Solutions System

March 2012 - November 2012

Rabale as Plant Head

Shri Swastik Engineers Pvt. Ltd

March 2010 - February 2011

Client: Hyva India Pvt. Ltd., Navi Mumbai

Key Result Areas:
• Looked after the complete plant operations right from receipt of sales orders to delivery through coordination, follow up, technical and commercial coordination with the customer
• Maintained documentation process related to client and submitted it with procedure compliances
• Monitored the production, processing, distribution and marketing support activities , 2 days in advance completion of production.
• Formulated budgets & approved the necessary expenditures related to supplies, materials & human resources and assured the utilization of materials, labour & equipments in order to meet the production targets
• Assessed the:
o Processing schedules, production orders to make decisions related to inventory, staffing requirements, work procedures, duty assignments by ensuring budgetary limitations and time constraints
o Operations activities with technical or administrative staff to resolve the production or processing problems
• Evaluated the inventory for sales plan requirement i.e. stock and WIP should be sufficient for 2 week requirements.
• Developed production reports and maintained personnel records
• Established the product standards for improved business growth
• Identified the samples of raw products and dealt with testing during processing to ensure finished products meet the prescribed quality
• Conveyed the plans to the research and support team to develop new products & processes
• Accountable for inventory cost, logistics and dispatch functions

Manager - Production & Process Engineering


July 2007 - February 2010

Client: L&T, J Kumar, Nagarjuna, Dubai Metro, Delhi Metro Project, etc.
Key Result Areas:
• Interfaced with operations team for sales functions
• Resolved customer complaint related with quality and productivity issues to ensure effective deliveries
• Provided support to techno-commercial offersregardingthe requirement and submitted to client for their approval
• Supervised dispatch and sales plan requirement on daily basis
• Identified the non-productive processes with different quality techniques such as method & time study for streamlining of operations
• Improved the processes through applications of tooling, jigs, fixtures and plant layout modification
• Formulated production planning methods for optimum utilization of resources
• Established new vendors for the technical outsourcing activities
• Assessed the vendor on the basis of performance, service, improvements and cost effectiveness measures
• Dealt with new production plan, raw materials and quality of product by client inspection and approval for the same


A Unit of Sheth Group

August 2004 - July 2007

Prestige Metal System India Pvt. Ltd. ( A Unit of Sheth Group ) Mahape, Navi Mumbai,
Client: Otis Elevators , Siemens Ltd , L & T , Kompress India.
Key Result Areas:
• Manager (Manufacturing and Development)
• Co-ordination with marketing department for production plan.
• Planning day to day production activities and organizing raw materials accordingly.
• Ensuring purchased of raw materials as per standards and required quality
• Managed and lead to established ISO certification programme in the organization.
• Managing of manpower to achieve maximum capacity utilization to enhance productivity.
• Assessment of vendor to ensure supply better quality raw materials, searching new prospective vendors for powder coating, anodizing, machining, plastic moldings, fabrication etc. have best track records.
• Coach and guide to subordinate for process improvement.
• Competency building organization wide to achieve objective.
• Potential and succession planning for subordinates, keeping records of employee's performance for performance review and development.

At Pranav Construction System Pvt. Ltd.
• Efficiently increased the productivity of:
o MDT Frame Fabrication (manual) from 120 nos./day to 260 nos./day through process layout modification in2007
o MDT Frame Painting capacity from 150 nos./day to 350 nos./day through modification in material handling system in 2007
• Holds the merit of receiving the award twice by the company's M.D. for outstanding performance of Process Engineering Department in 2008 & 2009
• Successfully acquired 50% increase in productivity, 30% reduction in manpower costs, 40% reduction in inventory through the implementation of 5S programme in 2008
• Proficiently developed the:
o Process & productivity norms for various processes such as punching& welding on various components as well as NC controlled fixtures in 2008
Proactively established the plant layout for 1 lakh sq. ft. shop floor having 10 product lines in 2009
• Expertly...

Manager - Development & Production

A Unit of Agfa Group

April 1996 - July 2004

ProjectEngineer & Tool Room Engineer


July 1993 - January 1996

Project: Undertaken: Market Research to meet Customer's Satisfaction and Raising Profit of the Industry

• Possess sound knowledge of:
o Practical application of aluminium extrusion process engineering science and sheet metal fabrication technology for applying principles, techniques, procedures & equipment to the design & production of various goods & services
o Raw materials, production processes, quality control, costs& other techniques for maximizing the effective manufacturing operations
o Machines & metal press tools including their designs, uses, repair and maintenance

Qualifications & Certifications

Production Engineering

Pune University

Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Supported Countries
Choose your country