Moawad - Senior Contract Manager - Basauri, PV, Spain

Nader Moawad

Basauri, PV, Spain


Highlight of Accomplishments and Skills:

**Contract management:
- Keeping the Company harmful from Possible Claims and issuing any necessary Counter
- Defending Company benefits from any unnecessary extra burdens or costs.
-Assuring and increasing Company Profits for the eligibility of any raised Variation Oder or
Work transfer.
-Advising of all associated issues regarding the Pre and Post Main contract.

** Subcontracts and Procurement Management:
- Saving up to 10 - 20 % annually, through professional negotiations with Subcontractors
and Suppliers.
- Professional administration of Subcontracts Agreements and Purchase Orders,
by close monitoring and prompt actions whenever needed .
- Development and leading of 21 Engineers, Quantity surveyors and contracts
Administrators staff, from start up.
- Efficient problems solving including any work stress or crises.
- Professional communication skills and Team leading.
- Accomplishment of fast track Subcontracts implementation and award.

Language Skills:

Perfect command of spoken & written: English, French and Arabic


Senior Contract Manager


Highlight of Accomplishments and Skills:

**Contract management:
- Keeping the Company harmful from Possible Claims and issuing any necessary Counter
- Defending Company benefits from any unnecessary extra burdens or costs.

Work History

1 ) Senior Contracts /Procurement Manager

Consolidated Contractors Co

June 2010 - June 2012

W.L.L. (C.C.C.), Yemen.
Project: Al Rayyan Hills Project (Project Value 360 Million dollars).

Work scope: Al Rayyan Hills project is located in Sana'a, Yemen. It is a mixed-use development divided into 4 phases, which consists of 138 Villas, apartment buildings, 5 stars hotel, services building, residential villas, offices and commercial facilities.
- Managing and administrating all the aspects related to the Main Contract, the Sub-Contracts and Procurement Departments.

2 ) Senior Contract & Sub-Contracts Manager

Consolidated Contractors Co

September 2005 - June 2010

W.L.L. (C.C.C.), Saudi Arabia.
Project: Khursaniyah Gas Plant Project (K G P)
(Project Value is $1300 Millions with subcontracted works value of $200 Millions)

Work Scope: Building two trains for Gas Conditioning and Ethane and Natural Gas Liquids (NGL) recovery, with total capacity of 1,000 million cubic feet a day.
Work Scope involves, Piping Fabrication and Erection, Equipments Erection, Civil Works, Steel Structure Erection, Electrical & Instrumentation, Painting, Insulation and EPC portion for 33 Buildings.

- Managing and Administrating the Contract and the Sub-Contracts and the Quantity Surveying Departments.
The Duties include all the aspects related to: Contracts terms and conditions, Specs, Correspondence, Quantity Surveying and Invoices, schedules, delays & recovery, cost, Budget, commercial, quality, materials approval, Resources and Manpower, submittals, samples, tests, letters of guarantee, shop drawings, variation orders, interim payment certificates and Claims.
First: SUBCONTRACTS ( 91 Subcontractors )

-Preparing and revising, tender packages and pre qualifications, prior to tender issuance for subcontractors.
-Receiving and studying bid proposals.
-Negotiating Bidders.
-Conducting clarification meetings, regarding cost, mobilization, procedures, method of statements, quality, safety, payments terms and schedule.
-Providing tender comparison sheet and recommendation reports, to the top
management, for all the trade packages, compared with

3) Senior Contracts Manager/Control Manager

Samcrete Egypt

September 2002 - September 2005

(Member of Sami Saad Group)
Project: American University Cairo, Early site package.
Duties: Managing and Administrating the Contract and the Sub-Contracts and the Project Controls aspects. (14 Engineers).
Coordinating and reviewing with the Consultants, Construction Manager and the Owner the technical and financial issues regarding: Contract, Specs, Correspondence, Quantity Surveying, schedules, delays & recovery, quality, materials approval, Project Controls, submittals, samples, tests, reports, follow up, invoices, letters of guarantee, shop drawings, variation orders and interim payment certificates.
Administrating the Sub-contractors contracts, including take-off quantities, general performance, site progress, tests, quality and schedule.
Issuing Sub-contractors payment certificates and change orders.
Preparing claims and counter-claims.
Preparing Contract close off documents, as built and Taking Over/Final Certificates.

Senior Contract Manager

Técnicas Reunidas

From July 2002

Managing and administrating all the aspects related to the Main Contract with the Client” Aramco”, including but not limited to all the issues related to the Pre and Post Main Contract such as : Contract´s clauses interpretation , all correspondence, procedures , meetings, interfacing, coordination, schedule, Value engineering, proposals, Resources and Manpower, Costs, Change Orders, Claims, Negotiation, Clarification and scope alignment meetings.

Contracts Manager


April 1999 - September 2002

(Member of Sami Saad and Costain Group, English - Egyptian joint venture)
Project: Pyramids Heights Project, 22 km Cairo Alexandria (Five Stars Office buildings compound consisting of 18 buildings.) Desert Road.
Duties: Led market survey for various contract packages and inquiries, including but not limited to, Rft. Concrete and all different types of internal and external high quality finishes, for the 18 office buildings.
Split Work Packages.
Performed Value Engineering Exercises.
Revised tender packages and pre qualifications prior to tender issuance for contractors.
Received and studied bid prices and conducted necessary meetings.
Negotiated Bidders regarding cost and conducting clarification meetings regarding mobilization, procedures, method of statements, quality, safety, subcontracting terms, payments terms and schedule.
Provided tender comparison sheet and recommendation reports for the different trade packages for the company's board members.
Compiled, issued, and implemented contracts for work packages based and non-based, on the FIDIC.
Issued Purchase orders and inventory of imported materials at Custom duty.
Reviewed and issued contractors(TM) take-off quantities and payments certificates.
Reviewed contractors site progress, quality and schedule.
Prepared claims and counter-claims.
Reviewed Contracts close off documents, as built, final payments, retentions and Taking Over/Final Certificates.

Contracts Manager


March 1998 - March 1999

(Member of Sami Saad Group), Pyramids Heights Project, 22 km Cairo Alexandria Desert Road, Giza, Egypt.
Duties: Performed tasks are same as above, in addition to Feasibility study & real estate, acting as the Client Representative.

Assistant General Manager


February 1994 - March 1998

(Member of Sami Saad Group), Rehabilitation and Expansion of Greater Cairo Waste Water Network (AMBRIC), Giza, Egypt.
Duties: Managed the technical office of company projects in hand. Coordinating with the consultant and the owner regarding all Project Aspects. Followed up work progress, company payments and updated time schedules. Supervised construction works on site.

3) Senior site engineer


November 1992 - January 1994

Cairo, Egypt
Duties: Project No 1: Elevated Water Tanks in Darassa (Rod El Farag Water Distribution System), American company within Orascom group. Acted as Project Manager of the contract of the pre-stressing of tanks of DYK Co. Coordinated with the consultant Hegs & Hell.
Project No 2: Cairo West Airport. Managed Engineering works department.
Coordinated with the consultant: CORP of Engineering

D. Project Manager


January 1988 - March 1992

Egypt. (Italian Co.)
Duties: Coordinated with the consultant and the owner in issues regarding contract, specs, schedules, material approval, samples, tests, reports, correspondence and payment certificates.
Issued company monthly payment certificates.
Managed the technical office.
Reviewed and performed quantity surveying exercises.
Issued subcontractors payment certificates.
Prepared shop drawings and as built drawings.
Evaluated cost & variation orders.
Supervised construction works on site.
Followed up work progress.
Negotiated Sub-Suppliers/Contractors.
Reviewed Contract close off documents and Taking Over / Completion Certificates.

5) Senior Site Engineer

COSTAIN-CRC, Pyramids Hospital, Giza

January 1987 - December 1987

Duties: Managed and supervised the construction works of one of the four sectors of the hospital, including heavy reinforcement Concrete and different types of finishes.

6) Senior Coordinator Engineer


July 1985 - December 1986

Transmission Interconnection of the Shoubra El Kheima Power Plant (1000 MW), Cairo, Egypt.
Duties: Supervised the construction works of the overhead transmission lines of the towers (220 KV and 500 KV).
Supervised the construction works of the under ground transmission lines (220 KV in high pressure oil-pipe type cable).
Managing the Contract administration regarding terms, conditions, specification, and correspondence.
Supervising site work activities regarding: Progress, Quality assurance, payment certificates, materials approval, testing, Subcontractors Contracts and performance, Materials Delivery and conformity with project requirements, safety, budget, Contract close up, Final certificates and snag lists.
Reviewed Reported claims and recommend status.
Conducting weekly and as necessary Coordination Meetings.

7) QC Engineer

Transmission Interconnection of the Shoubra El Kheima Power Plant

May 1984 - July 1985

(1000 MW), Cairo, Egypt, (Canadian co.)
Duties: Supervised the installation of the 8 inches steel pipe sleeve and the pulling of the 220 KV cable (of type pipe-type-cable).
Ensured the conformity of the executed works with plans and specifications requirements.
Prepare and submit interim payments.
Site Supervision for subcontractors regarding progress, quality, correspondence and payments.

8) Shift Chief Engineer

FRENCH Company

August 1982 - April 1984

Duties: Supervised the lowering works of the 35 tons prefabricated panels.
Supervised the casting in situ of diaphragm walls of width 0.6, 0.8, and 1.0 m and of depth 31m.
Oversaw soil grouting with bentonite slurry.
Oversaw the operation of the grouting plant and the slurry treatment plant.

9) Site QA & QC Engineer

Site QA

June 1981 - July 1982

Employer: R2M CO., Riyadh Tower, (30 floors) Cairo, Egypt
Duties: Ensured abidance by time and resource planned schedules.
Issued payment certificates to owner representative and to subcontractors.

QC Engineer


June 1981 - July 1982

(ECPC), (French Company.) Cairo, Egypt.
Duties: Ensured that fabrication of prestressed concrete pipes followed the quality control strategy of the factory.
Implementing Laboratory testing.

Qualifications & Certifications

Civil Engineering

Ain Shams University


College DE La Salle

College De La Salle