Oil and gas production engineer working first as construction supervisor and then as Construction manager,site manager, site project coordinator,project engineer,project engineering manager and then major projects project leader


Canada Engineer


Skills and qualifications
• Project management, Project Engineer
• Project planning & Scheduling
• Project Review meetings with Contractor and Internal staff.
• Contracts Execution Management
• Project Coordinator with contractor and Internal departments.
• Projects Presentations
• Evaluation of Expression of Interest / Business Proposals
• Preparation of Spécifications
• Conceptual Design Basis Reports
• Superviser of new instaltion and constructions
• Instrumentation Engineer for O&M
• Site Manager / Project Controller.
• Contracts Management & Cost Controlling
• Responsible Technical Office
• Interacting with Contractor for Monthly Progress calculations, Progress Analysis &
certificate of payment
• Site Planning, Scheduling, Monitoring of day to day activities & Site Mobilization as
• Site Co-ordination with other departments and QA / QC and HSE
• Follow up of Equipment & Materials – Ware house Management & Reception
Over view of Document Control & Quantity Estimation & Certification

Work History

Engineering manager

SONATRACH/ENI Engineering et Construction

April 2010 - October 2010

Suivi FEED, Engineering et EPC
2 recommandations disponibles sur demande


Project leader

SONATRACH /Hess London

January 2006 - December 2006

(1 an)
Realisation FEED in House

engineering manager at SONATRACH /Hess London

In House

January 2006 - December 2006

(1 an)
Project leader

Expériences de volontariat

Project Manager


April 1995 - March 1999

(1 an 3 mois)
Suivi de realisation des Projets EPC
1 recommandation disponible sur demande

Project engineer and project leader


March 1986 - June 1995

I have been involved in preparation works to initialize several oil and gas projects as a gas lift plant and a compressor station with power station in REB area (Hassi- messaoud)

project leader


May 1979 - September 1981

From May 1979 to Septembre 1981 I have been involved as project engineer and site manager for the realisation of one power station (2X18MW) 2 water production stations and one water injection plant(3X7000M3/Day)

Superintendant in Hassi Rmel

Sonatrach and Contractors Stone&Webster

April 1977 - May 1978

gas field: Construction, commissioning and Start up of Module1 and 2&3
huge gas plants (3x60MMM3/Day) with Sonatrach and Contractors Stone&Webster, Japan Gasoline).
Project coordinator for one power station, 2 gaslift water production and high pressure water injection plant.
Project engineer in Zarzaitine gas lift plant, project coordinator for 8 flared gas recovery plants in different
sites of Sonatrach upstream activity, project manager for 2 plants at REB and Mesdar.
Engineering and project leader in 2 Major projects of Sonatrach: FEED, feasibility studies, ITT document
supervision till EPC Contract award for BMS oil field, Timimoun gas field and CAFC/MLE hydrocarbons
fields Algeria.

Chef de service approvisionnements


November 1974 - February 1977

novembre 1974 - Poste actuel (38 ans 8 mois)
Apres 5 mois d'instruction militaire, j'ai été affecté au 2eme GDRS (Groupement pour la Defense et la
Restauration des Sols) ou communément appelé les "Barrage Vert" consistant a boiser 2540 hectares d'une
zone steppique semi aride avec des sols très accidentés contenant une immense couche calcaire affleurant
parfois le sol et ayant subi une sévère érosion.
Le but de ce groupement du Barrage Vert est de réaliser une barrière naturelle d'une vingtaine de km de large en pins d'Alep pour contrer l'avancée du Désert, créer un microclimat
Pres de 5 bataillons d'appelés du Service National y ont contribué pour chaque Contingent.

Distinctions et prix
Medailles de bronze, d'argent, d'Or et Vermeille
Commissions d'Entreprise
mai 1997 Le long parcours professionnel sans commettre de fautes m'a permis de meriter et d'btenir les distinctions
-Medaille de bronze en 1992
-Medaille d'Argent en 1997
-Medailled'Or en 2002
-Medaille Vermeille en 2008 en reconnaissance du Serieux, de la Confiance et de la continuité dans le Travail


Flared gas recovery within all oilfieds of Sonatrach National oil company

There were 8 projects which purpose was to recover all flared gases ,treat them ,recover the heavy liquids (oil and condensate) and compress the gases and inject them into the oil fields in order to maintain pressure and allow that oil fields to continue producing oil safely and economically.
Ones must understand that oil production must be managed with an equilibrium WITH THE NATURE OF THE OIL FIELD.
With thart projects tens of millions Cubic meters of gas were recovered, thousands of oil recovered and treated and excellent impact was done to the atmosphere by reducing the flared gases .Economically Millions of Dollars were earned by the company and the cash flow was garanteed for at least two decades.

Qualifications & Certifications

Hydrocarbons production engineering

Institut National des Hydrocarbures et de la Chimie

Institut National des Hydrocarbures et de la Chimie Boumerdes Algeria


Engineering et Construction


Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Supported Countries
Choose your country