Dar - Electrical Design Engineer of 132Kv Substations - Abha, Asir Province, Saudi Arabia

Muneeb Ahmad Dar

Abha, Asir Province, Saudi Arabia

Services

Electrical Design Engineer of 132Kv Substations

Summary:

COMPLETE DESIGNING REVIEW OF 132KV SUBSTATIONS INCLUDING DRAWINGS AND CALCULATIONS REQUIRED FOR THE CONSTRUCTION OF THE SUBSTATIONS AND REVIEW OF ALL THE SUBSTATION ELECTRICAL EQUIPMENTS/MATERIAL TO BE USED AT THE SUBSTATION UPTO THE COMMISSIONING STAGE..

Work History

SENIOR ELECTRICAL ENGINEER

DAR AL RIYADH ENGINEERING CONSULTANTS

March 2002 - March 2002

• Design review
• Supervision of construction, installation, erection & testing activities of the sunstations.
• Represent National Grid-SEC at all levels of project implementation.
• Provide all technical assistance, working experience and engineering & construction knowledge from design stage of project to Final Acceptance Certificate of the project.
• To attend Project Kick of Meetings, site progress review meetings and overall project progress review meetings.
• To prepare various documents/reports regarding Project construction activities.
• To coordinate between various NG-SA Saudi Electicity Company departments for better and in time completion of the Projects.
• To push the contractor at site to complete the work within the stipulated time period without sacrificing the quality of work and as per project technical specifications/contract document.
• To guide the contractor at site for achieving better results during the construction activities.
• To review the different calculations regarding design drawings submitted by contractor.
• To attend and inspect the completion of punch list items and warranty period defects after issuance of Technical Clearance Certificate & Provisional Acceptance Certificate of the project.
• To inspect the project spare parts, special tools and dismantled material, if any.
• To participate in final inspection of the s/s with all concerned NG SA –SEC departments before issuance of the Final Acceptance Certificate for the project.

SENIOR ELECTRICAL ENGINEER

DAR AL RIYADH ENGINEERING CONSULTANTS

March 2002 - September 2002

Supervision of the construction, installation, erection of 69kV Al Maha substation.

Responsibilities:
Supervision of installation of Power Transformers, GIS, switch gears, control & relay panels, battery, battery chargers, AC/DC panels, lying of complete grounding mesh and connecting all substation equipments to the main grounding mesh.etc.
To prepare various documents/reports regarding the Project construction activities.
Responsible for the safety and security measures at site.
To coordinate between different departments in SEC-SOA for the better and in time completion of the Projects.
To guide the contractor at site for achieving better results during the construction activities.
To check the activities at site as per project technical specifications.

Sub Divisonal Engineer-EXTRA HIGH VOLTAGE DEPARTMENT (Project Management)

Pakistan Water & Power Development Authority

June 1995 - March 2002

1. Construction, erection, installation, testing & commissioning of 220/132/11kV Substation–Islamabad-Peshawar Road.

2. Supervision of construction of 220kV Transmission Line for feeding 220kV S/S Islamabad- Peshawar Road.

• Supervision of construction of 500kV Transmission Line (In-Out) for Ghazi-Barotha Hydel Power Project financed by World Bank.
• In charge, 500kV site store Lawrencepur, Pakistan which is being used for issuing Transmission line material for 500Kv Transmission Lines.

Assistant Director

Pakistan Water and Power Development Authority

May 1992 - June 1995

Assistant Director Design (Transmission & Grids)

Preparation of complete Design Drawings for 132kVKv substations.
Calculations for Electrical Equipments/ material required for the construction of 132kV substations.
Supervision of construction of 132kV S/Ss.

Maintenance Engineer

M/S Butt Brothers and Company

August 1989 - April 1991

Worked as Maintenance Engineer for maintenance of Electro Medical Equipments.

DAR AL RIYADH ENGINEERING CONSULTANTS

Projects

SUBSTATION DESIGN ENGINEER

DESIGN OF 132KV SUBSTATIONS

SENIOR ELECTRICAL ENGINEER

AS SENIOR ELECTRICAL ENGINEER, I HAVE BEEN WORKING FOR THE ERECTION, INSTALLATION, TESTING & COMMISSIONING OF 132KV & 69KV SUBSTATIONS.

SUPERVISION OF CONSTRUCTION OF 500KV & 220KV TRANSMISSION LINES

AS ASSISTANT DIRECTOR/SUB DIVISIONAL ENGINEER, I HAD BEEN WORKING FOR THE SUPERVISION OF CONSTRUCTION OF 500KV & 220KV TRANSMISSION LINE CONSTRUCTION TILL THE ENERGIZATION OF THE TRANSMISSION LINES.

SENIOR ELECTRICAL ENGINEER FOR SITE SUPERVISION

AS SENIOR ELECTRICAL ENGINEER, I HAVE BEEN WORKING FOR THE ERECTION, INSTALLATION, TESTING & COMMISSIONING OF 132KV & 69KV SUBSTATIONS.

ASSISTANT DIRECTOR/SUB DIVISIONAL ENGINEER

I HAD BEEN WORKING FOR THE CONSTRUCTION, ERECTION, INSTALLATION, TESTING & COMMISSIONING OF THE 220KV & 132KV SUBSTATIONS.

Qualifications & Certifications

B. Sc

UNIVERSITY OF ENGINEERING & TECHNOLOGY, LAHORE, PAKISTAN.

Government college,Lahore/UET,lahore

Govt. Central Model School Samanabad Lahore.

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?