Ashraf - Land Surveyor - Saihat, Eastern Province, Saudi Arabia

Muhammad Ashraf

Saihat, Eastern Province, Saudi Arabia

Services

Land Surveyor

Summary:

To venture into the professional life and practically apply my skills, in a highly professional environment, that best utilizes my qualification, ability and where my education and exposure can contribute towards achieving organizational objective.

Work History

Sr. Land Surveyor

HAIL, K. S. A

July 2006 - December 2008

Project: Ministry of Water and Electricity - Hail Region (HAIL, K. S. A)
Employer: AL-RASHID TRADING AND CONTRACTING COMPANY.
• Supervision of construction work related to Surveying.
• Responsible for the layout of foundations for the structure of building.
• Responsible for the checking & dealing with consultant about the site work
And revisions of drawing.
• Responsible for the quantities of concrete and back filling.
• Coordination with the designer and contractor to achievement the better quality of work. Supervision of three crews of survey to execute the job.
• 15NOV 2005 to 05FEB 2006

Designation: Land Surveyor
Project: Dolphin Onshore Facilities Project (Gas Plant) Qatar
Employer: DESCON ENGINEERINGCOMPANY QATTAR

• Calculate the survey data from the approved drawings in AutoCAD
• Responsible for the layout of different civil structures e.g. electrical buildings, generator& gas turbine foundations, acoustic barriers, steel stack foundations, Inlet foundations, transformers & equipment pads etc.
• Coordination with the Client & Consultants regarding the review of drawings & about the site work.
• Setting out of underground facilities e.g. electrical cable tunnels, duct banks, manholes, main mechanical pipes trenches and mechanical pipes branches.


SURVEY INSTRUMENTS USED AT THIS PROJECT
1. Total Station of Leica TCR307
2. Total Station of Sokkia Set 610.
3. Auto Focus Level of Sokkia
. 4. Total station of Topcon gts751

Land Surveyor

MAPLE LEAF CEMENT ISKANDARABAD DIST

April 2005 - November 2005

02APRIL 2005 to 10NOV 2005
Designation: Land Surveyor
Project: Maple Leaf Cement Factory Iskandarabad District Mianwali.
Employer: MAPLE LEAF CEMENT ISKANDARABAD DIST
MIANWALI (CLIENT)

• Responsible for the layout of different mechanical structures of Cement Factory Setting out of the center lines of the piles driven underneath the structure
• e.g. Cooler Coolex, Clinker Storage Silo, Gypsum Crusher, Cement Mill Feed, Cement Mill, Cement Silos and Packing &Loading Plant.
• Coordination with the Client & Consultants regarding review of drawings and about the site work.
• Calculation of the coordinates from approved drawings with the help of Programmer Calculators Casio FX 4500, FX 3800P.
• Alignment& level of above mention mechanical structures of cement factory.

Land Surveyor

Ghotki

October 2004 - February 2005

Project: Rehmat Gas Field Project District. Ghotki
Employer: Descon Engineering Company (PAKISTAN)

• Calculate the data from the approved drawings with the help of Programmer Calculator of Casio FX 603p, FX 880p.
• Setting out of different civil structures of canal e.g. super passages, head regulator escape regulators, aqua ducts.
• Responsible for the excavation & preparation for stone apron & pitching of the guide banks of structures.
• Traversing & precise leveling for obtaining the accurate value of the benchmarks.
• Leveling work for the preparation of sub grade, sub base & aggregate base course of L/S& R/S road of the canal.
• Daily meeting with Project Manager regarding the execution of work.

SURVEY INSTRUMENTS USED AT THIS PROJECT

Land Surveyor

QAVI ENGINEERINGCOMPANY PAK

May 2002 - July 2004

(PAKISTAN)
2. PIA Cargo Complex Alama Iqbal International Airport Lahore Employer: QAVI ENGINEERINGCOMPANY PAK

• Supervision of construction work related to Surveying.
• Responsible for the layout of foundations for the structure of building.
• Responsible for the checking & dealing with consultant about the site work and revisions of drawing.
• Responsible for the quantities of concrete and back filling.
• Coordination with the designer and contractor to achievement the better quality of work.


SURVEY INSTRUMENTS USED AT THIS PROJECT
1. Auto Focus Levels of Sokkia
2. Total Station of Sokkia Set 30R
3. Theodolites of Sokkia DT2 and DT5.

Land Surveyor

ADNAN BUILDERS

August 2001 - April 2002

Project: N.D.C. Fatah Jung
Employer: ADNAN BUILDERS (Pakistan)

• Calculate the data from the approved drawings with the help of Programmer Calculator of Casio FX 603p, FX 880p.
• Setting out of different civil structures of canal e.g. super passages, head regulator escape regulators, bridges and aqua ducts.
• Responsible for the excavation & preparation for stone apron & pitching of the guide banks of structures.
• Traversing & precise leveling for obtaining the accurate value of the benchmarks.
• Daily meeting with Project Manager regarding the execution of work.

SURVEY INSTRUMENTS USED AT THIS PROJECT
1. Total Station of Sokkia set 2000, Sokkia set 3CS
2. Auto Focus Level of Sokkia
3. GPS Trimble 4400

GPS Trimble

Sokkia set 3CS
2. Auto Focus Level of Sokkia
3. GPS Trimble 4400

Senior Surveyor in NORTH SOUTH RAIL WAY PROJECT CTW300

ALJOUF REGION

Cut and fill works. Rail way survey work. Road Crossing, Camel Crossing, Bridges, agriculture road. Fence. Etc
AL-RASHID TRADING AND CONTRACTING COMPANY, (ALJOUF, K. S. A)
From 13DEC 2008 to till date.

Qualifications & Certifications

Surveying

Mine Survey Institute

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?