500KV Substation Testing and Commissioning (Siemens, ABB, Hyundai)
380KV Substation Testing and Commissioning (Siemens, ABB, Hyundai, Areva)
380KV Substation Automation system Testing and Commissioning (Siemens)
132KV Substation Testing and Commissioning (Siemens, ABB, Hyundai, Areva)
33KV Substation Testing and Commissioning (Schneider)
13.8KV Substation Testing and Commissioning (Siemens, ABB, Areva)

Work History

Main Contractor

KSA

From June 2013

M/S AL-toukhi, Subcontractor: ABB SAS, GIS by HHI

I am recently working as site manager testing and commissioning of 380/132/13.8KV substation and whole Substation automation T&C.

Main Contractor

T&C Team

January 2013 - June 2013

Alstom Grid, T&C Team: M/S Al-Fanar Co.

I have been Assigned as Site Manager to look after all project Testing and Commissioning alone from Suadi Electricity company and was given hard target to complete this urgent Project before the time, all energization were successful.
The Project was consist on four nos of 380KV transmission Line with FSC , Two Nos of Power transformer and 33KV switchgear.There was two separate SAS system, one for Station and other for FSC.
All GIS, protection panels testing were carried out and specially FSC Platform Test which was consists on CT Test, Primary Inject for FSC CT, Capacitor measurement Test, Reactor Measurements Test, Reactor Resistance Measurement Test, Forced Triggering function/Link Monitoring Test , Spark Gap test, Trigatron test, Metal Oxide varistor MOV Test and FSC Outdoor DS/ES, Bypassed CB test, P&C Function Test, SAS HMi Test.
The Substation was commissioned with Alstom SAS System and all necessary SAS testing were carried out including HMI, Engineering PC and SAS Communication panels.

Main Contractor

KAFD Riyadh KSA

November 2012 - December 2012

ABB KSA, SAS and GIS By Siemens Germany,


I worked as Team lead and got sound experience to lead my team, aim to complete the Substation testing and commissioning in line with overall schedule following SEC standard and implementation of PTS and SEC Protection requirements, solving site problems, critical issues and manage the site activities, preparation of site technical reports, preparation of three weeks activity schedule.

Main Contractor

2GW Power Plant DURMA KSA

March 2012 - October 2012

HHI, SAS and GIS By Siemens Germany.

Here I have been given the testing and Commissioning of SAS where I did Bay Control Unit 6MD66 Siemens Commissioning test including local cubicle arrangement(Installation, terminals and wiring), Hardware and software Configuration (CFC Logic for All interlocking, Synchrocheck function and Pole discrepancy), BCU Display and handling.SAT for Synchrocheck function and interlocking test By BCU & HMI.
The method of man machine dialogue was a multi-stage procedure with verification to ensure security of control. CLOSE and OPEN operation of switching devices are tested by giving a command from BCU and checking of the command execution. At the same time, the respective check back indications of switching position are checked at the BCU. The correct registrations in the event list were also be tested.
Bay level Alarm signal test upto the HMI (LCC BCU to HMI Alarm ) and Protection Alarm test on HMI, checking of all limits in HMI and Verification Communication Redundancy/Ring Topology.

At the remote of this Substation SAT, final settings and final trip test for Distance & DEF Micom P443 , REL670 ABB and Line differential Relay Micom P543 and relay matching and FS comparison.
I did also Steam Turbine Protection Panel testing commissioning including its Energization and I also got good experience because it adopts series of step to energize like Souk test, stability, pre synchronization test, dummy synchronization test and then finally actual synchronization.

Main Contractor and T&C Team

AL-Fanar Co

January 2011 - February 2012

Sub-Contractor: GIS By Alstom.

I was responsible for supporting, manage site activities, follow the protection requirements, protection modification, technical reporting, issuing site Instruction & Sangs, review and approval of Manuals/Procedures/Material Approval, Site acceptance test according to SEC Procedures, Issuing LOA and tested 132KV and 380KV CT test, CT loop Resistance test & primary injection Test by Primary injection test set ODEN for both 132KV & 380KV GIS,380KV TEE Protection Stability Test,380KV/132/13.8KV Power transformer stability Test,132KV Shunt Reactor Stability Test, Mechanical device trip test for Power Transformer (Buchholz relay, pressure relief devices , Oil & Winding Temperature), function test for 132KV GIS, Over All trip logic, CBF Scheme test & P821, pol discrepancy scheme test, Auxialury relay Test(MVAJ, TR Series, MVAX), Site Acceptance test for Bus bar differential relay Type MFAC , Over Current relay Micom, Line differential relay P543 Micom, Distance relay (21) REL670 ABB, Function Test for 132KV GIS LCC Panel, Protection Panel and Control Panels and all relays Final setting and final trip test, Testing of Annunciator type RTK & SACO 16D3 and ABB for 132 & 380KV,132KV Common Panel Test, SAT Synchrocheck relay and BCT Test.
Supporting in HV test for 132KV and 380KV System.
I was also responsible for energization for 380KV Line and Power Transformers and OnLoad Test after energization.


132/13.8KV S/S 8155 Riyadh.
Contractor: AL-Babtain Co.

I was responsible for SAT for Aux: relays, Over Current relay, T/F changeover Scheme(Trip on Parallel), CT Loop Resistance Test & Primary Injection Test, Function Test For 132KV LCC, Relay and Control Panel, Transformer and Under Frequency Panel, Function Test for ACDC Panels, Annunciator Test for CP and Transformer Stability Test.
13.8KV CT Test, VT loop Test and Function Test.

132/13.8KV S/S 8137 Riyadh
Contractor: SSEM
I have been assigned for 132KV CT Test, Primary Injection Test and...

Protection Engineer

Saudi Electricity Company

From January 2010

(Testing & Commissioning) As Site Manager
Work with Saudi Electricity Company (COA) through Al-Othman Consult KSA.

Assistant Engineer

Protection & Instrumentation

March 2006 - January 2010

500kv/220kv/132kv/11kv Grid Station NTDC, WAPDA
Lahore Shiekhupura Pakistan.


PROJECT EXPERIENCE

Projects

380/132/13.8KV S/S 9020 KAFD Riyadh KSA (November-2012 to December-2012)

Main Contractor: ABB KSA, SAS and GIS By Siemens Germany,


I worked as Team lead and got sound experience to lead my team, aim to complete the Substation testing and commissioning in line with overall schedule following SEC standard and implementation of PTS and SEC Protection requirements, solving site problems,critical issues and manage the site activities, preparation of site technical reports, preparation of three weeks activity schedule.

380/33KV S/S 9033 Hanakiya KSA (January-2013 to June-2013)

I have been Assigned as Site Manager to look after all project Testing and Commissioning alone from Suadi Electricity company and was given hard target to complete this urgent Project before the time,all energization were successful.
The Project was consist on four nos of 380KV transmission Line with FSC ,Two Nos of Power transformer and 33KV switchgear.There was two separate SAS system,one for Station and other for FSC.
All GIS,protection panels testing were carried out and specially FSC Platform Test which was consists on CT Test, Primary Inject for FSC CT, Capacitor measurement Test, Reactor Measurements Test, Reactor Resistance Measurement Test, Forced Triggering function/Link Monitoring Test ,Spark Gap test,Trigatron test,Metal Oxide varistor MOV Test and FSC Outdoor DS/ES,Bypassed CB test,P&C Function Test,SAS HMi Test.
The Substation was commissioned with Alstom SAS System and all necessary SAS testing were carried out including HMI,Engineering PC and SAS Communication panels.

380/33KV S/S 9029 Qassem-3 KSA (From June-2013).

Main Contractor: M/S AL-toukhi,Subcontractor :ABB SAS,GIS by HHI

I am recently working as site manager testing and commissioning of 380/132/13.8KV substation and whole Substation automation T&C.

Qualifications & Certifications

Himat ul islam

Qauid-e-Awam University of Engineering & Technology

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?