Stephen - Computer Aided Drafting - Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia

Muhammad Daniel Nelison Stephen

Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia

Services

Computer Aided Drafting

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Summary:

8 years experience in drafting technology with various CAD software.

Work History

Piping Designer

Synergy Oil & Gas Engineering Sdn. Bhd

PROJECT:
• MPP II Front End Engineering & Design(MPP II FEED) - (PETRON MALAYSIA PORT DICKSON)
• GG Field Developemnt Glycol Dehydration Package - (PERTAMINA PHE ONWJ)
• GRYPHON KE38 Detail Design - (PERTAMINA PHE WMO)
• PML Gas Lift Debottleneck - (PETROFAC MALAYSIA LIMITED)
• Layang FPSO - (TABUNG HAJI HEAVY ENGINEERING)

SCOPE OF WORKS:
• Involve In Design and P&IDS Study.
• Prepare Specifications For Design Purpose (PDMS).
• Mark-Up Isometric Drawings.
• Prepare G.A, Sections And Plot Plan Drawings
• Involve in Creating P&ID's, UFD's and PFD's drawing as per Mark-Up by Engineers.
• Perform site visit to Cendor MOPU for line routing and as-builting.
• Prepare MTO's.

PDMS Piping Draughtsman

SCOPUS (M) SDN BHD

From April 2011

PROJECT:
• Dulang Field Development Project - (PCSB)
• Cakerawala Field Booster Compression Project (CARIGALI HESS)
• SBO P&ID As-Built Updating - (PCSB)
• RO Shell Miri - (SHELL)
• Berantai FPSO - (PETROFAC)
• Cakerawala Field(CKR/CKP) - (CARIGALI-HESS)

SCOPE OF WORKS:
• Re-Modeling And Clash Check Of New Line With Point Cloud Data.
• Re-Routing New Line to Avoid Clashes between Existing Items.
• Checking On Shop Isometric Drawings.
• Preparing P&ID Mark-Up for Backdrafting.
• Monitoring Backdrafting Activities Among Other Drafters To Standardize All Procedure, Symbol, Etc.
• Meeting With Client For Any Issues Arised And Resolved
• Creating Line List Based On Client Given PDMS Model.
• QA/QC Checking Of All Line That Have Been Updated Inside PDMS Model According To Latest P&ID/G.A/Info's from Client.

Mechanical/Piping Draughtsman

BUMI ARMADA ENGINEERING

November 2009 - April 2011

PROJECT:
• SEPAT FSO Project - (PCSB)
• TGT FPSO Project - (HLJOC)
• D1 FPSO Project - (ONGC)
• BALNAVES FPSO Project - (APACHE ENERGY)

SCOPE OF WORKS:
• Involve in Creating P&ID's, UFD's, PFD's Drawing as per Mark-Up by Engineers.
• Involve in Creating Marine P&ID'S Drawing.
• Creating Hazardous Area Classification (Hac) Drawing as Per Module.
• Creating General Arrangement Drawing for Turret Laydown Area.
• Creating Rescue & Life Boat Arrangement.
• Re-Drawn As Built Drawing for Bidding.
• Involve in Creating P&IDS'S, UFD'S and PFD'S drawing As per Mark-Up by Engineers.
• Creating Swivel Stack Arrangement Drawing.
• Re-Drawing As Built Drawing for Bidding.
• Involve In Creating Demolition And Modification Drawing Based On As Built.
• Creating Stern / Bow Hawser Hang-Off Support Arrangement And Details.
• Draw 2D Piping Layout of Hull for General Arrangement.
• Creating Hose Maintenance Platform Drawings.

Mechanical/Piping Draughtsman

INTECSEA SDN. BHD

June 2009 - November 2009

PROJECT:
• Pipeline Replacement Project Phase 2 - (ONGC)

SCOPE OF WORKS:
• Assist Pipeline Designer in Creating Pipeline Crossing, Riser Assembly, Riser Arrangement And Clamps Details Drawing.
• Involve in Design And Drafting Works Of Pipeline Drawings.

3D CAD / PDMS Operator

SCOPUS (M) SDN. BHD

June 2009 - November 2009

PROJECT:
• Bokor Development Project - (Petronas / Ranhill Worley / Schlumberger)
• B 11 Drilling Platform - (MMC Oil & Gas)
• Angola E&P - (Total Oil)


SCOPE OF WORKS:
• 3D Modeling Of Isometric from Client to Be Review and Clash Check within Scopus Survey Data.
• Create Spec To Be Used In 3D Modeling
• Clash Checking Of New 3D Design with Existing.
• Attend Meeting With Client To Revise Design And Solving.
• Re-Routing Of Pipe To Void Clashing With Existing Structure
• Red Lines Mark-Up of Client Isometric Drawing.
• In Charge of 3D Modeling By Others Modeler and Checking.
• MTO Checking Of Fabrication Isometric Drawing, Mark-Up and Spooling.
• 3D Modeling of Platform Structure to Comply With New Design.
• 3D Modeling of Platform Base on Scopus Survey Data.
• Liaise With Surveyors In Determine Critical Area To Be Model And Report For Any Clash / Problems Occurs.
• Create Piping Specifications To Be Used By Others Modeler
• Prepare Material Take Off And Check Against Model And Isometrics
• Checking and Mark-Up Isometric Drawings for Client Review and As-Built.
• Dimensions Accuracy Checking Of Items in Isometric within Model.

PDMS Piping Operator cum Junior Piping Engineer

MODEC INC

November 2008 - April 2009

PROJECT:
• Pyreness Fpso Project - (BHP BILLITON LTD.)

SCOPE OF WORKS:
• Design Checking Against PDMS 3D Model With P&ID
• Closing BHPB Review Comments by Instructing PDMS Modeler to Change As Per Client Comments.
• P&ID Compliance Check Against Model. Mark-Up Error in P&ID and Inside 3D Model.
• Checking and Mark-Up All 2D Drawings Such As G.A, Isometrics, Supports and Shop Drawings.
• Perform Site Observations Of Some Critical Lines To Avoid Clashing And Error.
• Assist Piping Supervisor in Resolving Clashes and Missing Isometric's drawing.
• Work Closely With Others Discipline Engineer In Determine And Resolving Problems Occurs
• Installations and Design Phase.
• Review and comment support type and support details drawing.

Junior CAD / PDMS Designer

PLANT & OFFSHORE TECHNOLOGY

August 2008 - November 2008

PROJECT:
• Esterol Biodiesel Project
• Global Bonanza Biofules
SCOPE OF WORKS:
• Involve In Design and P&IDS Study.
• Prepare Specifications For Design Purpose.
• Mark-Up Isometric Drawings.
• Prepare G.A, Sections And Plot Plan Drawings
• Meeting With Client for Any Comments and Amendments.
• Prepare MTO'S.
• Involve In Design And P&IDS Study.
• Prepare G.A, Sections And Plot Plan Drawings.
• Prepare Isometric Drawings.

Junior CAD / PDMS Designer

DIALOG - MULTICAD ENGINEERING SDN. BHD

From January 2007

PROJECT:
• Tanjung Langsat Port Oil Terminal - Tanjung Langsat Port Sdn. Bhd
• Cogeneration Plant (Expansion) - (Petronas Refinary Melaka)
(Seconded To Shinryo-Steamline Consortium)

SCOPE OF WORKS:
• 3D Modeling Of Pipe System from Terminal to Processing Area.
• Designing Routing Of Pump Transfer Oil From Tank Farm To Pigging Area
• Assist Designer In Designing Pipe Line Routing.
• MTO Checking For Procurement.
• Provide Plot Plan, Isometric And G.A Drawing
• 3D Modeling Of Pipe Rack to Review Clashes with New Pipe.
• Provide And Drafting Of Piping, Mechanical, Electrical, Instrumentation And Process Drawing
• Assist Engineer In Designing System Of The Generator.
• Provide G.A Drawing And Plot Plan Drawing
• Provide Others Mechanical Drawing Such As Fire Water System, Drainage, And Equipment.

Practical Training / Draughtsman

UNIPAC ENGINEERING SDN. BHD

Up to June 2006

PROJECT:
• UMW-TOYOTA Project (3S Center) - UMW-TOYOTA
• AUTOBAVARIA BMW (3S Center) - AUTOBAVARIA-BMW

SCOPE OF WORKS:
• General Arrangement of Equipment Layout Base on Client Request.
• Site Visit For Arranging And Installation Of Equipment
• Assist Client In Arranging And Designing System.
• Provide Technical Advice For Client
• General Arrangement of Equipment Layout Base on Client Request.
• Site Visit For Arranging And Installation Of Equipment
• Assist Client In Arranging And Designing System.
• Provide Technical Advice For Client.
• Assist Sale Person In Technical Drawing For Client
• Provide Technical Drawing Of Equipment For Client Drawing

Qualifications & Certifications

Diploma in Mechanical Drafting & Design

Kolej Kemahiran Tinggi Mara Pasir Mas

Kolej Kemahiran Tinggi Mara Pasir Mas

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?