Summary:

as my c-v

Work History

Qatar Faculty Of Islamic Studies Project

Consolidated Contractors International Company

From June 2009

DOHA-(QFISP)QATAR

The aim of the project is to establish a educational building which embraces need & demands, including high class educational spaces. Office &classesunit plus big mosque over 2000 m2 rised on only 5 big column by using post tension system &many high finished items.

*Key Figures


* Contract value: QR 800 million
* Client: qatar foundation
* Consultant: ASTAD


Title: SITE SUPERVISOR - (Civil)
* Responsible to all nightshift activities.


HOCHTIEF CONSTRUCTION QATAR W.L.L
BARWA COMMERCIAL AVENUE (BCA) PROJECT
The aim of the project is to establish abusiness district which embraces need & demands, including high class commercial spaces. Office & residential unit.

* Mesaimeer city (south of doha) - QATAR

* BCA is a mixed - use development which includes the construction of (5) building stretching 8km in length all building containing of basement, ground floor, mezzanine commercial units & galleries. With (2) upper floors for office residential and retail units.

*Key Figures

* Total gross volume 3.550.000 M3
* Length of project 8.500 M

* Contract value: QR7.1bn ($1.97bn)
* Client: Barwa Real Estate.
* Consultant: MAUNSELL/AECOM (Maunsell consultancy
Service Ltd

Title: Finishing SUPERVISOR - (Civil)
* Responsible to all finishing activities in ¼OF the project.( above 2.2km long) & supervising over all subcontractors works.


Consolidated Contractors International Company - CCIC
Qatalum Project

Service Area And Pot Room Building Contract Vendors Front Sheet.
- Mesaeed Industrial City - Qatar.
- Qatalum is The Largest Aluminum Plant Ever Launched.
Qatalum is A joint Venture By Qatar Petroleum & Norsk
Hydro ASA, Will Have A capacity in The 1St Phase Of
585.000 Tones Of Primary Aluminum.
- Contract Value & US $ 6 Billion.
- Client: Qatalum (Qatar Petroleum & Hydro ).
- Consultant: SNC - Lavalin International.

Title: Site Foreman - (Civil)
- Assisting The Site Engineer With The Coordination Of
Works As Per The Project Requirement.
-...

Consultant Cms & A (Chiyoda Snamprogetti & Co

Consolidated Contractors International Company

December 2006 - May 2008

CCIC
Ras Laffan Onshore Expansion Project Ras Laffan, Qatar
(Liquefied Natural Gas - Lng Plant)
With AssocietedSea Water Intake And Outfall, Utilities, Off plots,
Lng Loading Berth #3, Condensate Loading Facilities units For Sales Gas As Part Of Al-Khaleej Gas Schema, Ngl Extraction Facilities And Helium Recovery Facilities.
Contract Value: US $ 650.0 Million.
Client: Ras Laffan Lng Company Ltd.(Ras Gas)
Consultant Cms & A (Chiyoda Snamprogetti & Co.)

Title: Site Foreman - (Civil)
Duties: Organize, Coordinate And Supervise The Work Of
Serverl Crews Composed Of Foremen, Skilled And
Unskilled Works .Plan The Activities Of
Sub-Ordinate Work Force To Meet Or Improve On
Work Schedules. Requist Materials And Equipment
As Necessary, And Also Responsible For Progress Of
Work in Terms of Quality And Quantity.

From

Site Foreman - (Civil)

Consolidated Contractors International Company

July 2005 - December 2006

CCIC
SHERATON HELIOPOLIS EXTENSION PROJECT CAIRO - EGYPT.
Title: Site Foreman - (Civil)

Duties: Prepared The Concrete Work Schedule Of Each Of Subordinate Foremen And Their Crews Checked Of The Conduct Of Work For Proper Output In Terms Of Both Quantity And Quality, And That Safe Working Methods Were Employed At All Times On Site.

From

siteForeman - (Civil)

City Stars

January 2001 - July 2005

Cairo - Egypt.
Title:siteForeman - (Civil)
Duties: Supervising The Reinforced Concert Works And Finishing Works, Prepared The Measuring Sheets For All The Items Related
To The Assigned Work Packages.
And Finishing MASONRY, SCREED, PLASTER, CERAMIC, MARBLE WOOD, METAL AND FALSE CEILING WORKS.

From

Foreman - (Architectural)

United Company For Construction

January 2000 - January 2001

Duties: Interaction With Production In The Workshop.
1. Most Of Finishing Items:-
- All Kinds of Cladding & Paving.
( internal & External)
(Marble - Granite - Ceramic - Stone)
- Masonry Work
- Screed Work
- Plaster Work
- Water Proofing Work
- Gypsum Work
- Wood Work
- Hard & Soft Landscaping
2. All Kinds of Cladding & Paving.
(Internal & external By Shop Drawing For Construction)
Assistant With Design Requirements Request By Engineers.

From

finishing supervisor for marbel & granite

HabitationBuilding

January 1989 - January 2000

Zamalek - Cairo.
- Jolli Ville Movenpick Resort - Sharm El Sheikh.
- ArrangementManagementBuilding - NasrCity - Cairo.
- Metro Underground Stations - Tahrir - Cairo.
- Conrad Hotel - At Nile - Cairo.
- Meridian Hotel - At Nile - Cairo.
- Hayat Regency Resort in Sharm El Sheikh.
- shraton Hotel - At Nile - Cairo.

Projects

golden pyramids plaza project

: Supervising The Reinforced Concert Works And Finishing Works , Prepared The Measuring Sheets For All The Items Related
To The Assigned Work Packages.
And Finishing MASONRY, SCREED, PLASTER, CERAMIC, MARBLE WOOD, METAL AND FALSE CEILING WORKS.

Qualifications & Certifications

building

cairo university

bab el shareya secondary school

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Moustafa Omar provides the following services:


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×