Project Management


Project Management, QA/QC management, Inspection, Supervision and Approvals, Document and Material Approval, IssueVariation orders if required, Testing and Commissioning of Projects such as Highways and Bridges, Industrial, Commercial and Residential Buildings, Power Projects, etc. See detailed CV.

Work History

Team Leader/ Resident Engineer, WAPCOS Ltd. Mozambique

E. V

July 2012 - August 2013

E. V. MOHAN, B.Sc (Engg)., F.I.I.B.E. - Total Experience: 43 Yrs ( 19 yrs in Gulf)
July 2012 to Aug 2013: Team Leader/ Resident Engineer, WAPCOS Ltd. Mozambique for the same.

Team Leader/ Resident Engineer

Mozambique for a Highway

July 2011 - August 2013

Project 103 km; Cost- USD 65 millions: Design Review & Supervision of the
Project for Execution including CD works &3 Bridges; Document & Material
Approvals, Execotion & Approval of Site activities etc.

Project Manager

Time Electro & Contracting WLL

June 2009 - May 2011

, Abu Dhabi
33kV Underground Cables for Khor Khwair Industries for Transco: 163km, 14 Circuits (3 core Cable) Responsible for Co-ordination with Client & Industrial Managements, Getting Approvals of all activities from the Client, Supply, Installation, Testing &Commissioning. Project completed in time.

Resident Engineer / Dy. General Manager

UPCL Project

May 2007 - May 2009

Udupi, Karnataka .Construction of 2 x 507.5 MW Thermal Power Plant
Position held: Resident Engineer / Dy. General Manager.
Duties involved: Responsible for QA/QC, Co-ordination with EPC and Client Divisions, Over-all Supervision and control, Monitoring and scheduling of the Project activities & Batching Plant production, etc., Mix designs& approval of M15, M20, M25, M30 M35 and M40; Trial mixes and Finalization of mixes (QA/QC approvals for Excavation, blinding, rebar works, shuttering works, concreting etc for Main Plant- 2 nos., Track Hopper, Cold Water and auxiliary Pump houses etc. (More than 1 lakh cum. Concrete of various mixes etc. have done related to the Project)

Asst. Resident Engineer - Civil


July 2004 - May 2007

Abu Dhabi.
Client: ADWEA/ TRANSCO, Abu Dhabi
Projects involved: Contract Nos. G-1323, N-2000B, N-2000E, N-2254 & N-00-011
Duties involved: Reviewing of Documents for Approval, Material approval, Trial mixes, QA/QC Inspection, Supervision & Approval for Cable Installation such as Trench preparation, Sand bedding, Cable laying, Road crossings ( open cut and NDRC ), Backfilling and Reinstatement of trenches , road crossings, Casting of Pre-cast elements such as Joint pits and covers, Link box pits, Markers, etc. Check list preparation and Clearance after rectification and Commissioning.
Contd. 2

Aug 2002 to 2004 June: Consultancy Services for Highways, Bridges and Building Projects

Superintending Engineer, National Highways

Kerala State Public Works Department Kerala

July 2001 - July 2002

North Circle, Kozhikode, Kerala. (Retired on Superannuation)
Total Length of Road 500 Km.

Duties involved: Responsible for execution and commissioning of High way projects such as Bituminous pavement courses, Bridge Work- Pre-stressed 37m x 8m x 8span at Arapuzha in NH Bye-pass, Tendering, Technical and Commercial evaluation, Execution of Agreement (FIDIC), Material approvals, Quality Control and Quality Assurance, Monitoring, Issue of Variation Orders, etc.

Executive Engineer, Local Works/Buildings,Kalpetta, Wayanad

Public Works Department

July 1999 - June 2001

Duties involved: Responsible for Execution and Commissioning of various types of
Projects related to one Revenue District such as Hospital Buildings,
School Buildings, Road Projects, Bridges, Water supply Schemes.
etc., Material approval, Quality control, Scrutiny and Passing of Bill and Payment to Contractors Bills.

Assistant Resident Engineer (Civil)

Water and Electricity Department of Abu Dhabi - Inspection

November 1996 - June 1999

Project: Bulk power Supply to the Island of Abudhabi. (Stage III),
132/11 kV Substation at E11 and W 59 and 400 kV Overhead
Line Shahama - Mirfa.

Client: Water and Electricity Department of Abu Dhabi - Inspection,
Supervision & Approval of Civil works - Quality control, Materials,
Soil Tests, Concrete, etc. for 132/11 kV Substation Project/132 kV
Cable Circuit (XLPE / Oil filled Cables ) Installation, Reinstatement of Road crossings, Inter locking tiles, kerb stones, and burnt clay
Tiles, Preparation of Joint Pits, Link box pits and Piling works for
Over-head line Towers, etc
Contd .3


Assistant Resident Engineer

January 1996 - October 1996

Project: Internal roads for 304 Low Cost Houses in Wadi E1-filie.

Client: Public works Department of Abu Dhabi.

Duties: Inspection and Recommendations of Documents & Project
Activities, CC bill for Approval related to the Project to the
Resident Engineer, Monitoring weekly progress, Cash-flow,
QA/QC activities and reporting to the Client through RE.

Quantity Surveyor

M/s Parkman Consultants Ltd

April 1995 - January 1996

I was Quantity Surveyor for Internal roads at Rahba in UAE

Court, Finishing of Senior and VIP villas & associated drainage

Public Works Department of Abu Dhabi

May 1994 - March 1995

Project: Internal Roads for New House at Al Rahba 64 km: Verification of
Measurements, Scrutiny of Contractor's bill, Variation orders, etc.
Client: Public Works Department of Abu Dhabi.

May 1994 to March1995: M/s Pivot Engg. & General Contracting (W. L. L)

Position held: Project Engineer

Project: Residential Complex & Rams, Clinic at Habshan Cost
Dhs. 92,000,000.00

Client: ADNOC & GASCO.
Nature of Work: In-charge of internal road works, Tennis Court and Multiple
Court, Finishing of Senior and VIP villas & associated drainage
Works (storm water drainage & house connections drainage
Works), Sewerage pumping station work, 300 mm GRP pipeline
Work about 1 KM in length and also responsible for the
Inspection/ quality control associated with all the above items.
Completion of quality control checklists and follow up of punch
List items.

Contd 4


Assistant Executive Engineer

Kerala State Public Works Department

July 1986 - April 1994

Duties & Responsibilities: Tendering, Negotiation, Execution of agreements, monitoring,
Inspection, material approvals, quality control, Check-
Measurement, scrutiny of bill of quantities, passing of bills,
Taking over and handover of projects etc of various types of
Works such as roads, bridges & culverts, multistoried buildings,
Hospital buildings, school buildings, villas, associated works, all
Maintenance works and individual water supply schemes.

Asst. Project Manager

M/s Fouad Abdullah Fouad Corporation

May 1982 - April 1986

Duties & Responsibilities: Project management, scheduling, monitoring, Supervision & Quality Control for the construction of 3 Storied Pre-cast structure
Residential Complex (11 nos) and internal road works, associated
Surface drainage and sewerage works - Precast-panelled structure,
Sewerage pipeline work about 1.5 km, 300 mm dia with 1500 mm
dia. Manholes, and various Oilfield Projects for Aramco.

Assistant Project Manager

Royal Commission, Jubail, K.S.A

October 1980 - December 1981

M/s Hendam Trading & Est., Saudia Arabia
Position held: Assistant Project Manager
Duties & Responsibilities: Supervision, scheduling, quality control, material take off,
Procurement of materials, preparation of bill of quantities,
Management of civil works for the construction of vegetable
Market building, internal road works & parking and associated
Surface drainage works, storm water drainage, completion of
Checklist and follow up punch lists (size of buildings 100m x 30 m with folded plate roof)

Contd 5


Civil Engineer

Trading & . Co., Salalah

August 1978 - June 1980

Duties & Responsibilities: Independent charge of the company - Design and estimating,
preparation of tenders, scheduling, quantity surveying, negotiation with Consultants, supervision of works, preparation of bill of
Quantities etc for multistoried buildings and residential complexes and related water supply &sanitary works.

Assistant Engineer

Kerala State Public Works Department

May 1972 - August 1978

Duties & Responsibilities: Designing, preparation of plan & estimates, scheduling, inspection,
Quality control, quantity surveying of various type of works such as
Roads, bridges & culverts, buildings associated surface water & Drainage works, house connection drainage works and water supply

Managing partner

Consultancy & Contracting, Kerala, India

May 1970 - April 1972

Duties & Responsibilities: Design, Preparation of drawing, estimating, construction and supervision of residential buildings and commercial complexes,
Villas and related water supply, sanitary and drainage works.

E. V. Mohan


PWD Projects as Client Engineer, Power Projects as ARE and RE, Highway Project as ARE in Gulf , etc

Got 43 yrs of exp. including 19 yrs in Gulf such as Execution and management of various type of Civil Engg. Prestigious Projects as given detailed CV.

Qualifications & Certifications

B.Sc (Engg) in Civil

Kerala University

B.Sc(Engg) - Civil

Govt. College of Engg., Thrissur Kerala - Kerala University

Model Boy's High School, Thrissur

Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Supported Countries
Choose your country