INSTRUMENT QC INSPECTOR

TECHNIP-ITALY/Carlo Gavazzi Arabia CO. Ltd

February 2012 - February 2013

Duration: 02nd Feb-2012 to 13th Feb-2013

RESPONSIBILITIES:
Preparation and review of inspection check list, inspection test plans, Quality control
Procedure for instrumentation activities as per project Aramco SAES index and Standards &
Code.
Ensure and an implement, the contractor performs all quality inspection activities as per
Approved client quality inspection plan, Local inspection agents, Vendor or subcontractor
Quality control inspection procedure and applicable code.
Perform field inspection to verify conformance to project specification, Aramco SAES index
J>B>&P, SAIC/SAEP, library/Standard drawing, relevant standard PIP, NEMA, NEC,
NFPA, IEC etc. ) SATIP, SAIC/SATR and IFC drawing prior to final acceptance. Issue site
Memo, site instruction, and discrepancy report, Non-conformance reports etc if violating the
Approved project Drawing, Specification, Standard and also follow up for rectification and
Corrective action.
Maintain all updated standard & codes procedures, drawings, data and logbook of RFI
Status for conducting internal and external audit with client. Finally coordinate to supervisor/
Engineer to prepare documentation for MCC after major punch items sign off by client.

INSTRUMENT QC INSPECTOR

CARLO GAVAAZI ARABIA CO, LTD

March 2011 - January 2012

Project: Upgrade Water injection & water Disposal Systems-Abu Ali
: Plants, (Saudi Aramco)
Position: INSTRUMENT QC INSPECTOR
Duration: 4th mar2011 to 29th January 2012

RESPONSIBILITIES:
Deals and reviewing of all ITP's/QCP/Method Statement/Project related document/Material
Approval prior for project plan preparation. Ensured instrument works complied with applicable project Supervised and monitoring the inspection on-site, Calibration shop and Warehouse to meet the project Quality requirements. Project Duties included review of loop folders and released for final acceptance by Commissioning team.

INSTRUMENT QC INSPECTOR

PETRO CHEMICAL AND OIL REFINERY

November 2004 - February 2005

RESPONSIBILITIES:
all kind of instruments like PT, FT, TT, LT, PDT, I/P converters, Level, trolls
Pressure switches, level switch, fire & gas Detectors, On-Off valves and reviewing IFC
As build drawing activities. Inspection of cable tray conduit for primary and secondary cables instruments of instruments panels, Gladding & termination, loop testing etc.
Instruments impulse line leak test instrument air line leak testing instrument tubing as per
Hookup drawing.

FAMILIAR WITH THESE DOCUMENTATIONS
➢ Typical drawing, Instrument Index, cable schedule, cable routing lay out ➢ Hook-up Diagrams, P & ID Drawing, general Arrangement and layout
➢ Instrument loop Drawing. Wiring Diagram, hazardous Area layout
➢ Commissioning procedures (SAT/OTP).
➢ Scope of Work Limitation.


Date:
Place: MOHAMMAD SHAHNAWAZ ALAM

INSTRUMENT QC INSPECTOR

BOC GASES JAMSHEDPUR

February 2001 - October 2004

RESPONSIBILITIES:
inspection of cable IR test. Inspection of cable dressing, cable ID tags as per the drawing and inspection of cable entry schedule of the CCR, glanding and termination. Inspection of UG cable top layer sand bedding and grounding, lying of red tiles or warning mesh and back filling. Inspection of meggering test of various types of power and control and instrument cable Follow-up with construction team to close out the NCRs issued by client.

ABROAD EXPERIENCE

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?