Project involving Engineering, Procurement, Manufacturing, Erection and Commissioning of power equipments and Power distribution systems projects.

Demonstrated professional excellence in project planning, scheduling, monitoring, Site Supervision, and execution of projects without incidences of time/cost overruns.

Work History

high voltage direct supply

HVDS project is to reconfigure the existing Low voltage

From August 2013

Project Summary: HVDS project is to reconfigure the existing Low voltage (LV) network as High Voltage Distribution System, wherein the 11KV line is taken as near to the loads as possible and the LV power supply is fed by providing an appropriate capacity transformer (25KVA/63KVA/100KVA) and minimum length of LV line with an objective to provide better quality power losses, reduction of supply and better consumer service.
This project involves the following works like:
- Study of load and Shifting of load centers to bifurcate between Domestic and IP sets circuits.
- Dividing the IP set circuits into two numbers of parts of almost same wattage.
- Fixing of energy meters at DTC's for energy auditing / Erection of new transformers at various load (15KVA/25KVA/63KVA/100KVA).
- Fixing of RLMS Boxes at each DTC's, Erection of new poles and intermediate poles for OH LT and OH HT lines.
(2)PROJECT NAME: Single Phasing Scheme (SP) Project.

Senior Engineer


From July 2012

1.High Voltage Distribution System (HVDS) Project, 2. Single Phasing Scheme (SP) Project, Distribution System Projects.
Tenure: Working from July 7th 2012 till date

Maharashta state electricity distribution company limited


August 2012 - July 2013

Project Summary: Single Phasing Scheme for Left-out Villages/Wadies & balance feeders (SP) Project for the supply, test, transport, construction, erection, testing and commissioning of distribution lines (HT and LT), Single Phase distribution transformers of varying capacities ( 15KVA and 25 KVA) and other allied works, bay with allied equipments, metering equipment (i.e. current transformer, potential transformer, meter and control cable) period for works, in Latur Zone / Circles throughout Maharashtra State.
This project involves the following works like:
• Survey, Erection, Testing & Commissioning of 15VA&25KVA Transformers.
• Ensure regular compliance of all obligations as per Project requirement.
• Formulation of project budgets, maintaining project margins & Liaisoning with client.
• Provide narrative analysis when require. / Getting approval for surveyed drawings from the client.
• Insures all working documents & data are maintained to back-up estimate figures.
• Assists & participates in presentations to corporate management and clients.
• Provides technical assistance in negotiating contracts & change orders.
• Calculation of materials required for the complete execution of work.
Machines Handled:
• Cable Trencher (speed tractors of 20-95hp).
• JCB, Proclainer & Cranes (Crawler-mounted, Truck-mounted).
• Construction of electrical m/c such as Tongue Tester, Megger, Multimeter.
I NECO INFRA (P) LIMITED: Junior Engineer, 3. Gowthan Feeder Separations Scheme (GFSS) Project (Distribution & Transmission System Projects).

Junior Engineer, Constructions

Gowthan Feeder Separations Scheme

June 2011 - June 2012

(3)PROJECT NAME: Gowthan Feeder Separations Scheme (GFSS) Project, Client: The Maharashtra State Electricity Distribution Company Ltd. (MSEDCL)
Duration: Jun 2011- May 2012,
Project Summary: Load separation between village and irrigation pump. Erection of HT/LT lines, Erection of 63KVA, 100KVA & special designed transformers.

This project involves the following works like:

➢ Handled initial planning, estimation & documentation of rural electrification (RGGVY) project.
➢ Responsible for Erection, testing & commissioning of, LT, 11KV lines, 33KV line.
➢ Responsible for maintaining the status of all activities of materials planning status, all ordering/purchasing procedure status, supplier information etc.
➢ Charged with undertaking communication with suppliers for materials requirements, negotiating with suppliers to obtain quotations, preparation of comparative statements assessment of supplier capacities and preparing purchase orders for timely procurement of materials.
➢ Handling team of supervisors, Trainee Engineers & labors on site
Job Responsibilities INECO INFRA (P) LIMITED:

- Preparation of Estimations for the work for which approval is given by client.
- Getting the work order for the Estimation prepared. / Ensuring both safety and quality at site.
- Training the Contractors and labors about the work to be carried out.
- Planning and Execution of work at site within the given time. / Preparing of all types of bills & planning.
- Preparing of all types of bills & planning. / Material reconciliation & consumption.
- Meeting with client for their requirement. / Supervising & managing of sub contractors.

Senior Engineer, Constructions


n Toopran Andhra Pradesh).
(1)PROJECT NAME: High Voltage Distribution System (HVDS) Project.
Client: Andhra Pradesh Central Power Distribution Company limited (APCPDCL).

Qualifications & Certifications

Electrical & Electronics Engineering

Jawaharlal Nehru Technological University Hyderabad

Guru Nanak High School

Board of Intermediate Education

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Mohammed Mubeen Uddin provides the following services:

Supported Countries
Choose your country