Senior site engineer, (deputy construction manager)

besix-orascom

From December 2012


Pudget: 800 000 000 $
Position: Senior site engineer, (deputy construction manager)
Project management (Consultant):
Owner: The Government of the Arab Republic of Egypt represented by the Ministry of State for Antiquities/Supreme
Council of Antiquities
The project in brief:
• Museum & Conference Centre roofs consists of reinforced concrete
structure resting at top of west walls while east wall supports the other
side via steel posts;
- Glass between steel post provides light to halls;
- DS walls are resting on continuous strip footings;
- Bands A to D: reinforced concrete;
- Band E: pre-stressed concrete;
• Steel roof with similar geometry is used for Entrance Courtyard, Food
Court, Solar Boat Enclosure and Temple Garden
• Tunnel connecting Main Building via Nilometer to Conservation
Centre;
• Café Dune
• Ticketing and security buildings A & B
• Water irrigation tank
• Multi-storey car park
• Coach park
• 260 000 m3 concrete.
Responsibilities:
#• Responsible for all operations on my area (museum building)
(excavations, compaction , concrete work, isolation, backfilling, block work) from day one for me to ensure that the project is completed on time, budget and maintains all the standard procedures.
#• Daily coordination with warehouses and equipments to get materials and equipment required for work.
#• To specify the required technical and normal manpower who are required to implement works.
#• Technical in coordination and supervision of construction at site, Dealing with contractors, monitoring progress of works and regular reporting.
#•Assisting in keeping and following of the Project's Occupational Health &
Safety Plan, to ensure a safe & secure implementation on site without accidents, perils or threats
#• Implementing the Project's Quality Control / Quality Assurance Plan, to ensure quality implementation on site.
#•Assisting in maintaining Archiving system, Daily Log, Weekly Progress
Report and Monthly Status Reports.
☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺

senior site engineer

orascom ci

November 2010 - December 2012


And Telecommunication (lot7) _Algeria
Company: Construction and
Industries as a subcontractor.
, as a main contractor
Budget: 260 000 000 $ for Orascom scope only
Position: Senior site engineer, (deputy construction manager)
Owner: Sonatrach & Anadarko
Consultant: QC petrofac &QC Anadarko
The project in brief: civil works include pipe rack foundation, turbines
foundations, control building, lab. building , steel structure pipe racks , all
underground piping works ( oily, potable water, sewage water, hot oil
drained, fire fighting water lines, instrument air lines, ) , steel building with cladding and landscape works
Responsibilities:
#• Responsible for all operations on site (control building, landscape work) from the commencing date up to ensure that the project is completed on time, budget and maintains all the standard procedures.
#• Daily coordination with warehouses and equipments to get materials and equipment required for work
#• To specify the required technical and normal manpower who are required to implement works.
#• Technical in coordination and supervision of construction at site, Dealing with contractors, monitoring progress of works and regular reporting.
#•Assisting in keeping and following of the Project's Occupational Health &
Safety Plan, to ensure a safe & secure implementation on site without accidents, perils or threats
#• Implementing the Project's Quality Control / Quality Assurance Plan, to ensure quality implementation on site.(code used Aci, Bs )
#•Assisting in maintaining Archiving system, Daily Log, Weekly Progress
Report and Monthly Status Reports.
Activities: I was responsible for,
..control building (concrete, finishes works).building area 2700 m2
.ground floor .all concrete works. all kinds of finishes (((((suspended ceiling
, marble cladding , ceramic cladding, MDF cladding , posters cladding ,
gypsum cladding , raised floors , HDF floors , marble floors , carpet tiles
floors , ceramic floors , epoxy...

senior site engineer

orascom

May 2008 - November 2010

Algeria
Company:orascom for Construction and Industries a
subcontractor, KBRII as a main contractor.
Consultant: QC KBR&QC Sonatrach
Budget: 280 000 000 $ for Orascom scope only
Position: Senior site engineer.
Owner: Sotnatrach
The project in brief: All civil works include pipe racks foundations,
turbines foundations, control building, lab. Building, substation 1, 2, 3,4,5,7 and LNG, PROPANE and BUTANE tanks (concrete tanks).
Responsibilities: #• Responsible for all operations (LNG tank) from the commencing date up to ensure that the project is completed on time, budget and maintains all the standard procedures.
#• Technical in coordination and supervision of construction at site, Dealing with contractors, monitoring progress of works and regular reporting.
#•Assisting in keeping and following of the Project's Occupational Health &
Safety Plan, to ensure a safe & secure implementation on site without accidents, perils or threats
#• Implementing the Project's Quality Control / Quality Assurance Plan, to ensure quality implementation on site. .(code used Aci, Bs )
#•Assisting in maintaining Archiving system, Daily Log, Weekly Progress
Report and Monthly Status Reports.

SENIOR SITE ENGINEER

SIAC

June 2006 - May 2008


consortium of (siac) Industrial
construction
Engineering company & (Siemens)
Main consultant: Archimid architects.
Project manager: EGYCAN
Budget: 65 000 000 $
Position: Senior site engineer.
Owner: (HSBC) bank.
The project in brief: All civil works from A to Z. Project area 8000 m2
include building with area 5000 m2 .consist of two basements & ground
floor and 4 floors. using prestressed concrete system (post tensions) in the slabs and beams & there were a lot of kinds of finishes (((((suspended
ceiling , marble cladding , ceramic cladding, MDF cladding , posters
cladding , gypsum cladding , raised floors , HDF floors , marble floors ,
carpet tiles floors , ceramic floors , epoxy painted floor , gypsum partitions ,
glass wall partitions , curtain walls , all kinds of elevations finishes ,
landscape works (fountains , green areas , manholes , hand holes, piping
works, irrigation works) , have the experience for the special conditions and requirements for the banks,,,,,,,,,,,,,,,,,,,,,,,,,,,,,)))))
Responsibilities:
#• Studying drawing and specifications which are required to achieve the elements of the project.
#• Receiving drawing from construction manager.
#• Daily walk through and completely supervision on all belonged
activities.
#• Daily coordination with warehouses and equipments to get materials and equipment required for work
#• To specify the required technical and normal manpower who are required to implement works.
#• Responsible for all operations on site from the commencing date up to ensure that the project is completed on time, budget and maintains all the
standard procedures.
#•Assisting in keeping and following of the Project's Occupational Health &
Safety Plan, to ensure a safe & secure implementation on site without accidents, perils or threats
#• Implementing the Project's Quality Control / Quality Assurance Plan, to ensure quality implementation on site. .(code used Bs )
#•I had controlled 1 junior engineers, 3...

JUNIOR SITE ENGINEER

SIAC

May 2005 - June 2006

PROJECT - GRANG EGYPTIAN MUSEUM STAGE 2
Main consultant: ACG
Budget: 85 000 000 $
Position: Junior site engineer.
Owner: The Government of the Arab Republic of Egypt represented by the Ministry of State for Antiquities/Supreme
Council of Antiquities
The project in brief: All civil works. Project area 18000 m2 include
building with area 7000 m2 .consist of two floors. All walls are reinforced
concrete with 08.00 M height using DOKA shuttering.
Responsibilities:
#• Receiving drawing from construction manager.
#• Daily walk through and completely supervision on all belonged
activities.
#• Achieving quality &aspects and all activities.
#• Achieving HSSE requirements.

junior site engineer

El-Menofia university

October 2002 - August 2003

Company: (ELNASR BUILDING&CONSTRUCTON COMPANY) EGYCO
Budget: 25 000 000 e.l
Position: junior site engineer.
Owner: (El-Menofia University)
Brief about the project: students housing include 80 rooms (concrete and civil) &swimming pool, landscape and three administration buildings

Previous training:
-Trained at TOSHIBA EL-ARABY buildings (refrigerator factory. steel

junior site engineer

ELNASR BUILDING&CONSTRUCTON COMPANY

August 2001 - September 2002

EGYCO
Budget: 5 000 000 e.l
Position: junior site engineer.
Brief about the project: three buildings, landscape (area 2000 m2)

TRAINER

Eshraka Co

-Trained at Eshraka Co. for construction ( Elkhadra school ) summer
2000 (foundations<, isolation, backfilling > , first floor structure).

Qualifications & Certifications

Engineering

Menoufiya University

QUESNA

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?