Adam - Construction Manager - Alexandria, Al Iskandariyah, Egypt

Mohamed Adam

Alexandria, Al Iskandariyah, Egypt


Construction Manager

  • Full time
  • Part time
  • One time
  • Contract
  • Temp


i have 29 years experience in oil and gas field,infrastructural,building,steel structure fabrication and erection,piping,painting and tanks
jetty insulation off-shore

Work History

Construction Manager

Oman Oil Company

March 2012 - June 2013

Gas Processing Plant-The Abu Butabul(ABB) gas field is located in Block 60 on the South-West of Sultant of Oman about 100 km West of Saih Rawl in an area of 10 km(E-W)by32 km(N-S)-GPP to export quality product and start-up of export facilities

Functions & Responsibilities: ● Safety leadership by personal example

●Ensure safe performance in all aspects and phases of the project.
●Supervision of the construction organization, resource planning and assurance of
Manpower and personnal requirements to meet the needs of the project.
●Effective completion of construction work and deliverables to meet the need of
Of the project.
●Develop and maintain construction system and processes.
●Planning support for construction work and input to issue of accurate and timely
Progress report

Construction Manager (Main Contractor)


November 2009 - December 2011

Project Description: Abu Dhabi Crude Oil Pipeline Project(ADCOP) The United Arab Emirates (UAE) authorities assigned International Petroleum Investment Co. (IPIC) to execute the Abu Dhabi Crude Oil Pipeline (ADCOP) project which will facilitate transferring 05~1.5 MMBBLD (1.8 MMBPD with DRA injection) of crude oil from Habshan production facilities to Fujairah main oil terminal (MOT) which is approximately 404 km.
Functions & Responsibilities: • Safe and timely execution of all aspects of the works. • In conjunction with the site based Construction/Package Engineers, Liaising with ADCOP, to ensurethat procedures are complied with and that all project time and quality objectives are achieved. • Adhere to the timetable and maintain cost. • Implementation of all project Management plans, Procedures and Specification at site Monitroing and advising on the Project Team's compliance all Project Management Plans, Procedures and Specifications. • In conjunction with discipline engineers, monitoring the progress of all procurement packages and mitigating the effect of any delays. • Participating in Inspections, including daily, weekly and monthly inspection. • Monitoring the control work and permit to work System. • Attending Construction Team toolbox meeting as required. • Participting in and review Construction Team planned workplace inspections and reports. • Facilitating Site Security requirements. • Implement and monitoring the HSSE performance of the construction personnel. • Plan and implement all site induction as required and any other training as appropriate. • Monitoring that all incidents are investigated thoroughly and reported on and followed up, with the object of ensuring preventative strategies has been implemented. • Monitoring implementation of the construction related Project Risk Management action • Coordination of C onstruction Engineer and I nspectors in fabrication, assembly and testing for all site installation works.

Section Head

Consolidated Contractors Company

November 2007 - September 2009

Project Description: Khafji Field Development Plan Project Aramco Phase-1
Functions & Responsibilities: • Steel Structure Erection • Tanks Work • Insulation Work

Section Head

Consolidated Contractors Company

February 2007 - November 2007

Project Description: Jubail Chevron Phillips Project
Functions & Responsibilities: • Steel Structure Erection • Pipe Support Erection • Insulation Work • Platsing and Painting work

QA/QC Engineer

Germanischer Lloyd Doha

February 2006 - December 2006

Project Description: CHIYODA TECHNIP JOINT VENTURE RasGas Onshore Expansion Project Phase 2 (Train 6 & 7)
Functions & Responsibilities: • Civil Works • Steel Structures

QA/QC Engineer

Germanischer Lloyd Doha

June 2005 - October 2005

Project Description: PIPELINE CONSTRUTION PROJECT Dolphin Energy Company
Functions & Responsibilities: • Construction Two Causeway from shore line till 1580 m • Excavation trench between the causeways • Install Bedding materials in the trench • laying the pipe and tie in with the plant

Assistance of Jetty Head Section

Archirodon Construction Overseas-Egypt

June 2002 - May 2005

Project Description: LNG IDKU PROJECT
Functions & Responsibilities: • Installation of Jetty which consist of the following: • Temporary Supporting (Working platform) • Pile Caps (with loads of 40& 55 & 60 & 80 and 90 ton) Modules 170 ton fabricated from two built up section steel grade 52 • Bearing and Wedges • Adjust of pile out of Tolerance • Casting concrete for pile opening • Installation of platforms • Installation of Marine Operation platform • Installation of pre- cast element • Cast in situ for Marine platform &connection platform and Loading • Installation of connection platform • Installation of loading platform • Installation of Mooring Dolphin (Pile Caps and shell) • Installation of Breasting Dolphin (Pile Caps and Finder)

Site Manager


March 1999 - April 2002

Functions & Responsibilities: • Installation of Processes center factory around 3600 Ton(heavy) • Installation of flat steel factory around 5000 Ton • Supervisor for Naphtha Reformer Complex (Pipe Rack) as a subcontractor of Alex. Petroleum Company • Installation of (Pipe Rack - Steel structure - platform) • Around 3600 Ton As A subcontractor of TR Company • Which was a main contractor of Amok Mineral Oil Company • Installation of RAW MILL for Blue Circle Cement Company • Which is consists of (Steel structure building - Duct piping) • Installation of pipe rack in Hiby Medical Company in Qina around 400 Ton

Project Manager


October 1996 - November 1998

Project Description: Construction of Al -Sarooj filling station shell AL - Gubil Hotel
Functions & Responsibilities: Basement, round floor, , Mezzanine, 8 Stories

construction mana ger


June 1994 - December 1995

(Saudi Arabia)
Functions & Responsibilities: • Construction villa with two floors for total area 500 Sq. m • Al-Khldiya high school, which is two floors each one consists of 10 classes • Extension of intermediate school for girlies • Housing project for military maintenance

Site Manager

AL Jabreen Est. For Contracting

November 1991 - June 1994

Project Description: Housing project for Military Maintenance divisional at Sharura Port Saudi Arabia for total area 15,000 Sq. m
Functions & Responsibilities: • Two stories building 1200 Sq. m around 12 rooms in additional to toilets o Two stories building 800 Sq. m o One floor building 450 Sq. m o One floor building 450 Sq. m o Recreation hall 300 Sq. m • A mosque 500 Sq. m in additional to 22 m highest minaret • Three washing rooms with facilities • Warehouse to Al - Zamil specification for total Wight 500 Ton (steel) • Work shop including crane 10 Ton for total Wight 1200 Ton • General facilities as a west deposal and water connection - asphalt

Site Manager


September 1990 - October 1991

Project Description: Maintenance at Al- Biad Airport at Al Kharji Maintenance at King Fahad faculty at Riyadh
Functions & Responsibilities: Maintenance at Al- Biad Airport at Al Kharji for all activities (building, blumbing, HVAC .etc ) Maintenance at King Fahad faculty at Riyadh for all activities (building, blumbing, HVAC .etc )

Site Engineer


February 1986 - August 1990

Project Description: Construction of Alexandria bank Surveying of contour lines of Faisal Islamic bank city
Functions & Responsibilities: Piles work and construction civil work Surveying work

Qualifications & Certifications

moustafa kamel

civil bachelor


Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Mohamed Adam provides the following services:

Supported Countries
Choose your country