Fazal - Bus Driver - Toronto, ON, Canada

Mirzam Fazal

Toronto, ON, Canada

Services

Bus Driver

Work History

INSTALLER/ WELDER FITTER

ZAMCO FINISHING SYSTEM

From July 2012

OFF LOAD EQUIPMENT AND STAGE FOR INSTALLATION
OVER 20 YEARS MIG/ TIG/ STICK WELDING EXPERIENCE
REVIEW CAD DRAWINGS WITH EMPLOYEES
PRIORITIZE WORK FOR THE PROJECT
INSTALL STRUCTURAL STEEL ON SITE
WELD WASHER HOUSING
WELD TANKS TO WASHER HOUSING
INSTALL PUMPS AND BURNERS
INSTALL SUPPLY AND RETURN PIPING
INSTALL COVEYOR LINES
INSTALL EXHAUST STACKS
INSTALLATION OF COMBUSTION CHAMBER
INSTALLATION OF OVEN PANELS
HANDLE A TEAM OF 10 GUYS ON VARIOUS SECTION OF THE PROJECT
EXPERIENCE IN AUTOCAD
EXPERIENCE IN BLUE PRINT READING
EXPERIENCE IN MIG, TIG AND STICK WELDING
LICENCE TOW MOTOR OPERATOR
CRANE OPERATOR
FALL ARREST TRAINNING
AERIAL LIFT LICENCE

WELDER FITTER

ARKBRO INDUSTRIES

October 2011 - May 2012

READ CAD DRAWINGS AND FIT PARTS ONTO STRUCTURE
FORKLIFT OPERATOR
CRANE OPERATOR

INSTALLER/ WELDER FITTER

ZAMCO FINISHING SYSTEM

March 2009 - June 2011

OFF LOAD EQUIPMENT AND STAGE FOR INSTALLATION
OVER 20 YEARS MIG/ TIG/ STICK WELDING EXPERIENCE
REVIEW CAD DRAWINGS WITH EMPLOYEES
PRIORITIZE WORK FOR THE PROJECT
INSTALL STRUCTURAL STEEL ON SITE
WELD WASHER HOUSING
WELD TANKS TO WASHER HOUSING
INSTALL PUMPS AND BURNERS
INSTALL SUPPLY AND RETURN PIPING
INSTALL COVEYOR LINES
INSTALL EXHAUST STACKS
INSTALLATION OF COMBUSTION CHAMBER
INSTALLATION OF OVEN PANELS
HANDLE A TEAM OF 10 GUYS ON VARIOUS SECTION OF THE PROJECT
EXPERIENCE IN MIG, TIG AND STICK WELDING
EXPERIENCE IN AUTOCAD
EXPERIENCE IN BLUE PRINT READING
LICENCE TOW MOTOR OPERATOR
CRANE OPERATOR
FALL ARREST TRAINNING
AERIAL LIFT LICENCE

LEAD HAND/ WELDER FITTER

FORMELY NIZSONS FABRICATORS

REVIEW PROJECT WITH DESIGN ENGINEER
HANDLE A TEAM OF 15 GUYS ON VARIOUS SECTION OF THE PROJECT
EXPERIENCE IN BLUE PRINT READING
PRODUCE PROJECT SCHEDULE
PRODUCE DETAIL MATERIAL TAKEOFF
ORGANIZE MATERIAL DELIVERY SCHEDULE TO SHOP FLOOR
PRODUCE DETAIL CUTLIST WITH DRAWINGS AND SKETCHES FOR SHOP PRODUCTION
ORDER ALL WELDING GASES, WIRE, HARDWARE AND PAINT TO COMPLETE PROJECT
USE AUTOCAD FOR DETAILING AND MODEL PARTS IN 3D ENVIROMENT
COMMUNICATE WITH CUSTOMER TO SOLVE ANY PROBLEMS AND/OR ISSUES ON THE PROJECT
ORGANIZE THE DELIVERY OF ALL PUCHASE ITEMS BY THE CUSTOMER TO THE SHOP FLOOR
WORK ALONG WITH EMPLOYEES ON PROPER FITTING AND WELDING PROCEEDURE OF SUB ASSEMBLIES.
OVERSEE THE OVERALL PRODUCTION OF THE PROJECT
IMPLEMENT THE WELDING PROCEEDURES ACCORDING TO THE REQUIRED SPECIFICATIONS
TEST WELDS AS REQUIRED BY THE SPECIFICATIONS
EXPERIENCE IN MIG, TIG AND STICK WELDING
VALID FORKLIFT LICENSE
OVERHEAD CRANE TRAINING
O.H.S. CORE 1 AND COE 2 TRAINING
W.H.I.M.I.S. AND C.P.R TRAINING

WELDER FITTER

JANURARY

Up to December 1996

SUPERVISE AND WORK ALONG WITH 10 EMPLOYEES
SET TASK FOR EACH EMPLOYEE ON A DAILY BASIS
INTERPRET ALL BLUEPRINTS AND SKETCHES
SET UP JIGS FOR PRODUCTION
COMMUNICATE WITH THE SHEAR, PUNCH, BRAKE AND SAW FOR MATERIAL TO ASSEMBLE THE PROJECT
FIX WELDING MACHINES ON THE SHOP FLOOR
PAINT PROJECT USING ELECTROSTATIC SPRAY GUN BY KREMLIN
LOAD PROJECT ONTO TRUCK WITH OVERHEAD CRANE
LOAD PROJECT ONTO TRUCK WITH FORKLIFT
PREPARE DETAIL SHIPPING DOCUMENTS FOR TRUCK DRIVER


JANURARY1988 NIZSONS CUSTOM METAL FABRICATORS BRAMPTON, ONTARIO
to DEC 1991 WELDER

TACK AND SEAL WELD HOUSING FOR PAINT LINES AND SMALL SUB ASSEMBLIES
FORKLIFT DRIVER

NIZSONS CUSTOM METAL FABRICATORS

November 1986 - December 1988

GENERAL ACCOUNTING

REPLACED MANUAL ACCOUNTING SYSTEM WITH SIMPLY ACCOUNTING.
SET UP AND INTEGRATE ALL G/L ACCOUNTS
SET UP ALL EXPENSE ACCOUNTS
SET UP ALL PAYABLES ACCOUNT
SET UP ALL RECEIVABLES ACCOUNT
PRODUCE ALL INVOICES AND COLLECT PAYMENTS
KEY IN ALL PAYBALES AND PAY WHEN AGED
RECONCILE ALL BANK ACCOUNTS
PAYROLL

A/P CLERK

SATTELITE DIVISION

September 1983 - October 1986

SORT ALL INCOMING INVOICES
MATCH ALL RECEIVIMG REPORTS TO INVOICES
COMMUNICATE WITH SHIPPING DEPARTMENT FOR ALL DIFFERENCES
ADDRESS ANY DIFFERENCE WITH CUSTOMER
ENTER ALL CONFIRMED INVOICE INTO THE ACCOUNTING SYSTEM
ISSUE CHEQUES AS PER AGED REPORT
FILE ALL PAYABLES
FOLLOW UP ON INVOICES WITH PROBLEMS
REPORT A/P SUPERVISOR AND/OR MANAGER

March 6, 2014

Attn: Human Resource Manager


To Whom It May Concern

Please accept this letter in application for the Welder Fitter position currently available within your company.

As you can see from my enclosed resume, I have over 20 years experience as a Welder/Fitter with large scale fabricating projects and have extensive training in blueprint reading and as a project leader. I am very proficient with all aspects of AutoCAD design software including 3D animation and use it for detailing of sub assemblies for large projects. I have extensive experience using all shop tools and equipment in fully customize fabricating environment. I have a valid Tow Motor and Aerial lift license. I am a certified member of the Joint Health and Safety Committee I also produce and maintain a production schedule using Microsoft Project software. I can effectively use all of Microsoft Office programs. I am a very diversified individual who is always willing to learn new skills and most of all a willing team player for the benefit of the company.

Some of the notable projects that I fabricated are Industrials Washers, Dip Tanks, Combustion Chambers, Industrial Ovens, Scrubbers, Composting units, Heat Exchangers, Coil Coating Lines, Mezzanines, Access Ladders and Burner Supply Tubes. I also manage projects on site installation of full industrial paint line systems.

I would appreciate the opportunity to discuss my credentials with you at a mutually convenient time. Thank you for your consideration.

Respectfully yours,


Mirzam Fazal (Murry)

Qualifications & Certifications

AUTOCAD

WESTWOOD SECONDARY SCHOOL

ACCOUNTING

HUMBER COLLEGE

SENECA COLLEGE OF APPLIED ARTS AND TECHNOLOGY

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?