Ali - Shift Engineer Instrumentation - Mumbai, MH, India

Mir Masud Ali

Mumbai, MH, India

Services

Shift Engineer Instrumentation

Summary:

3 Years Duration (Chemical plant) in Instrumentation ,Diploma in Electrical Engineering & Computer Diploma hardware & Networking Over 9 years of Experience in Maintenance also Commissioning of Field & DCS TATA Honeywell & ABB Make.
2. Currently Working with JAI BALAJI INDUSTRIES LIMITED as An Engineer in Instrumentation Technology from April 2009 to Till Now.

Work History

As an Engineer in instrumentation

IMPERIAL FASTNERS PVT LTD

2 MW FBC)

Engineer, Control & Instrumentation

JAI BALAJI INDUSTRIES LIMITED

From April 2009

, Durgapur, West Bengal
• Duration: From April 2009 to Till Now

Engineer, Jai Balaji has a capacity of 18.5

Nature of Job in Power Plant

From April 2009

Mega watts which is generated by two AFBC Boilers ( Capacity 37 TPH and 30 TPH ) and 7 TPH X 7 WHRB.
✓ Commissioning of 30 TPH Boiler (Instrumentation Section)
✓ Commissioning of CHP (Coal Handling Plant ) Instrumentation Section
✓ Commissioning of Pneumatic Based Ash Handling System for 30 TPH Boiler
✓ Documentation and ISO standard Calibration Report Sheet making.
✓ Regular monitoring of Instruments in turbine area as well as boiler area
✓ To maintain healthy response of all SMART Transmitters and calibration from HART
Communication if required.
✓ Calibration of Pneumatic control Valve.
✓ Woodward Governor Controlled Actuator Calibration (CPC, Analog & Digital )
✓ To check and maintain Instruments used in DM Plant.
✓ To check ID fan IGV, FD fan IGV, FD Header P.A Header and their limit switches.
✓ Calibration of Digital Graphic Panel using Manometer and their maintenance.
✓ Servicing and maintenance of Motorized Valve and to check their feedback to PLC
✓ Idea about impulse line piping, cable tray routing, Instrument mounting, cable Laying, J.B.
Mounting and terminating, Panel mounting, panel wiring and terminating, profibus
communication, loop checking.
✓ To check if any module is not communicating with DCS and to give the relevant solution.
✓ Working Platform:-
i) GE fanuc, Series 90-30; Proficy HMI SCADA - Simplicity 7.5; Machine Edition - 5.1
ii) ABB AC 800 M ; Control IT OPC Server - AC 800 MC 3.2; Control Builder
Standerd - 3.2; Scada - Scada portal 2.1
iii) PLC - S7 - 300 (Siemens); Scada - Win CC ; Software - Schematic Manager

Roll

August 2008 - March 2009

Maintenance of Field Instruments & ABB DCS.
.

JOB PROFILE: Involve in maintenance in field instruments carrying out all preventive; corrective; periodic; Routine; Running and breakdown maintenance overhaul and field control instrument like pneumatic control valve; motorized operated valve wood ward governor; control panel etc. and
ABB DCS & TATA HONEYWELL DCS.

As an. Engineer in instrumentation

DESEIN PVT LTD

February 2006 - July 2008

• Duration: 18Th February 2006 to 11Th July 2008.
• Roll: Maintenance of field instruments, pneumatics control system and ABB DCS.

• Designation: As an. Engineer in instrumentation.
• Organization: DESEIN PVT LTD UNDER JOY BALAJI INDUSTRIES. (25*2 MW CFBC)& INDO RAMA SYNTHETIC LIMITED (15*2 MW.)

JR. Engineer-instrumentation - Through M/S - I.K. Control Organization

TENUGHAT THERMAL POWER PLANT STATION

October 2005 - February 2006

(210 MW X 2)
• Duration: 15 Oct, 2005 to 5th Feb 2006.
• Roll: Maintenance of field Instruments.

Technician-instrumentation - through L&T

116 MW COMBINED CYCLE COGENARATION POWER PLANT

October 2004 - October 2005

Duration: 15 Oct, 2004 to 18 Oct 2005.
• Roll: Maintenance of field Instruments (TATA HONEYWELL DCS).

Technician-instrumentation - (Vocational training) under L&T

HALDIA PETROCHEMICALS Ltd

August 2003 - October 2003

(116 MW COGENARATION POWER PLANT)
• Duration: 20th Aug, 2003 to 31st Oct 2003.
• Roll: Maintenance of field Instruments & Lab Instruments

Projects

power plant

• Designation: Engineer, Control & Instrumentation.
• Organization : JAI BALAJI INDUSTRIES LIMITED, Durgapur, West Bengal
• Duration : From April 2009 to Till Now
Nature of Job in Power Plant: - From 2nd April 2009 to Till Now
Working as an Engineer, Jai Balaji has a capacity of 18.5 Mega watts which is generated
by two AFBC Boilers ( Capacity 37 TPH and 30 TPH ) and 7 TPH X 7 WHRB.
 Commissioning of 30 TPH Boiler (Instrumentation Section)
 Commissioning of CHP (Coal Handling Plant ) Instrumentation Section
 Commissioning of Pneumatic Based Ash Handling System for 30 TPH Boiler
 Documentation and ISO standard Calibration Report Sheet making.
 Regular monitoring of Instruments in turbine area as well as boiler area
 To maintain healthy response of all SMART Transmitters and calibration from HART
Communication if required.
 Calibration of Pneumatic control Valve.
 Woodward Governor Controlled Actuator Calibration (CPC , Analog & Digital )
 To check and maintain Instruments used in DM Plant.
 To check ID fan IGV, FD fan IGV, FD Header P.A Header and their limit switches.
 Calibration of Digital Graphic Panel using Manometer and their maintenance.
 Servicing and maintenance of Motorized Valve and to check their feedback to PLC
 Idea about impulse line piping, cable tray routing, Instrument mounting, cable Laying, J.B.
Mounting and terminating, Panel mounting, panel wiring and terminating, profibus
communication, loop checking.
 To check if any module is not communicating with DCS and to give the relevant solution.
 Working Platform:-
i) GE fanuc, Series 90-30; Proficy HMI SCADA – Simplicity 7.5; Machine Edition – 5.1
ii) ABB AC 800 M ; Control IT OPC Server – AC 800 MC 3.2; Control Builder
Standerd – 3.2; Scada – Scada portal 2.1
iii) PLC – S7 – 300 (Siemens); Scada – Win CC ; Software – Schematic Manager

Qualifications & Certifications

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?