Caulley - Superintendent - Milwaukee, WI, USA

Mike Caulley

Milwaukee, WI, USA



Work History

(General Contractor) Jay Bell - President

Pyramid Services Inc

From May 2012

604 N. Eckhoff Street Orange, CA 92868
Project Supervisor/CQC Manager/Site Safety and Health Officer (SSHO)
Supervised multiple projects located through-out Southern California for NavFac.
Naval Air Station-North Island-Coronado - San Diego, California
Marine Corps Logistics Base (Nemo and Yermo Annex) - Barstow, California
Camp Pendleton (NEMTI) - San Clemente, California
Seal Beach (NMC) - Seal Beach, California
Projects range from $150,000 to $1,100,000
• Managed all daily, weekly and monthly project reports.
• Managed safety and quality control programs with staff and sub-contractors.
• Constantly reviewed and maintained construction schedule with contractors and client.

(General and Electrical Contractor) Vivian Solodkin - President

Sigma Construction Services Inc

December 2008 - August 2011

Site Superintendent / CQC Manager/Safety Management
Supervised multiple projects with the United States Army Corps of Engineers in co-ordination with the Department of Veterans Affairs located in Los Angeles and Loma Linda, California. Projects range from $500,000 to $2.2 million dollars.
• Responsible for overseeing design-build projects, multiple general and electrical construction projects and managing sub-contractors while insuring quality control and site safety. Also, responsible for the day-to-day management requirements of several US Army Corps of Engineers projects located on government property.
• Created manageable construction schedules from start to finish, coordinated with project manager to ensure timeliness of submittals and contract submission as well as working with the appropriate agencies to ensure all required permits and conditions, with emphasis on safe practices, are met from start to completion of construction. Accountable for project supervision, organization, planning, time-lines, and sourcing / scheduling trades, material and equipment.
• Manage bids, cost analysis, labor estimating and expensing, material requirements and ordering, plan take- offs, blue print reading, permits, inspections and legalities. Also, interface with Owners and Architects to determine requirements and effectively resolve issues.

(Developer and General Contractor) Damon Porter - President

Porter Development Inc

1725 21st Street Santa Monica, California 310-315-5411
Site Superintendent / Quality Control/Safety Management
Served as site supervisor for Porter Development Inc. Past projects (14 commercial buildings - several being supermarkets) range from 6000 sq. ft. to 20,000 sq. ft. at a cost of $700,000 to $8 million.
• Responsibilities included construction meetings with the owners, city officials, sub-contractors while developing communication protocols.
• Developed and managed overall project schedule. Tracked progress against required goals while accurately maintaining project budget.
• Coordinated and reviewed monthly draw requests submitted to the Owner.
• Managed all owner construction reporting and facilitated owner meetings as required.
• Scheduled and supervised suite tenant improvements.
• Managed safety and quality control programs with project staff and sub-contractors.
• Responsible for ensuring the successful completion of the project, its profitability and for retaining the owner as a client.

(General Contractor) Steven Kessler - President

KCS Construction Services Inc

205 ½ South Doheny Drive Beverly Hills, California 310-278-5380
Site Superintendent / Quality Control/Safety Management
Supervised the ground up construction of 3 commercial buildings for KCS Construction Service Inc (now AC
Construction) in Santa Monica, CA. Total square feet of 60,000 at a cost of $21 Million.
• Reviewed all contracts, blue prints, specifications and local building codes.
• Developed project delivery strategies, organized and coordinated with the contractors, architects, inspectors and client to accomplish schedule and budget goals.
• Resolved field and technical issues by generating RFI's. Reviewed and processed change orders.
• Managed all daily, weekly and monthly project reports.
• Managed safety and quality control programs with staff and sub-contractors.
• Constantly reviewed and maintained construction schedule with contractors and client.
• Conducted weekly construction meetings, managed minute notes and sent via e-mail to all

(General Contractor) Jessey Fenton - Owner

Santori Development Inc

8451 Roseland Ave. Moorpark, California 805-529-0599
General Manager / Site Superintendent for Santori Development Inc. Specialized in structural concrete construction.
Project cost range from $50,000 to $2,000,000. Past projects include UCLA and LAUSD.
• Responsibilities included managing multiple concrete projects ranging from decks to underground parking
• Maintained all reporting requirements to the developer and client.
• Developed delivery strategies, organized and coordinated with the venders and inspectors to accomplish
schedule goals.
• Followed all safety and quality control protocols and conducted weekly meetings with staff.

Certifications and Skills:
• CPR/First Aid Certified by American Red Cross (Current)
• 30 Hour OSHA Certified - Competent Person Training (Fall Protection and Confined Space)
• CQC Certified by USACE/NavFac, exp. 2014
• QCS/RMS system program knowledge
• USACE - EM 385-1-1 Safety Requirements and Protocols
• Certified Confined Space Supervisor and E/A - 2009
• Information Systems Security Awareness - 2010
• Asbestos Awareness & Lead Training - 2013
• Department of Defense (HLS) - Security Background Check - Expires November 2016
• Computer literate. (most MS software) Effective in MS Project, Excel, Word, Outlook, Publisher
• Highly developed organizational behavior.
• Ability to multi-task and manage time well.
• Strong communication skills, written and verbal.
• Read, comprehend drawings, specifications, construction documents, contracts.
• Knowledgeable of UBC ADA, NFPA, UPC, UEC, Title 24, OSHA rules, FAR's, federal contracts and prevailing wage.
• Experienced in SWPPP Protocols
• Document final closeout - Certificate of Occupancy and Owner's acceptance.
• Environmental Compliance Assessment, Training and Tracking System (ECATTS) - May 2012


Past Project Highlights

NavFac Naval Air Station – North Island – Coronado, California
Renovate 1st floor office space – Bld 8C. Cost $500,000

NavFac / Marine Corps / Camp Pendleton – San Clemente, California
Naval Expeditionary Medical Training Institute – Expand and repair NEMTI restroom. Cost $1,100,000

USACE / Greater Los Angeles Veteran’s Affairs
Building 213 and 215 - Installed “Wanderer” System. Cost $500,000

Building 300 – Installed new “Fire / Life / Safety system while maintaining strict infectious control protocols. Cost $300,000

Building 206, 220, 258 and 500 - Retrofit elevators – Replaced existing cabs, motors, control centers (traction and hydraulic) and upgraded system while building was occupied. Cost: $1.5 million

Phase 6 – Replaced medium voltage (5 kv) cables, transformer and 480V switchgear. Coordinated and scheduled outages, testing and energizing the system (through-out the NE section of the facility). Cost $ 2 million.

Bld. 99 – Reconstructed 4160v electrical vault (concrete and lid). Installed temporary sub-station with Edison while maintaining continuous power to the facility. Cost $900,000.

USACE / Loma Linda VA – Installed 48 low voltage lighting panels (480/277v), eight Motor Control Centers and several Automatic Transfer Switches while maintaining uninterrupted service to the facility. Cost $2.2 million

Corland-Carlson Property Management
Washington Mutual Building – Downtown LA. Constructed in 1926. Responsible for the seismic retrofit of the first seven floors. Project required steel reinforced concrete columns and grade beams. Also, restored retrofit areas to original condition. Cost $1,000,000.
Additional projects consisted of basic slab-on-grade, sidewalks, curb and gutters and following Cal Trans guidelines.

First Congregational Church of Long Beach
Remodel / Addition. Concrete construction of three floors, basement and elevator shaft. Project consisted of pilasters, poured in place walls, court yard and block retaining walls. Cost $2 million

Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Mike Caulley provides the following services:

Supported Countries
Choose your country