Tapescu - Engineer - Bucharest, Romania

Mihai Marian Tapescu

Bucharest, Romania

Services

Engineer

Summary:

Everything is new in water wells drilling and equip, from all points of view.
Drilling, hand over, maintenance, repair and so on.

Work History

Night Mechanic

SAKSON GROUP

September 2013 - January 2014

• Location: Turkmenistan
• Responsibilities:
Participate to ZJ 70 Rig UP, onshore, as well as all necessary tests to be done before it to be transfered ofshore for drilling. 3000 hp + vdf

EL-ME Coordinator

SYNERGY RESOURCES LTD, ORDGEO LLC

November 2009 - August 2012

• Location: Kazakkhstan, Mongolia
• Responsibilities:

- coordinating EL-ME activities (mechanical-energetical);
- proposes and monitors repair and maintenance schedules and programs for all types of rig equipment (diesel engines, draw works, mud pumps, compressors, transmissions, generators, etc);
- coordinates and monitors the execution of repair operations at all devices and equipment in order to provide the normal and continuous functioning;
- coordinates and monitors the execution of planned maintenance repair operations at all drilling equipment and devices;
- equiping all water wells from the well head(own project) with Grfundfos submersible pomps.


- supervise up-to-date maintenance records on all rig equipment for all the rigs;
- comply with requirements of safety standards and best practices in water wells;
- drafts and proposes system and operational procedures for mechanical-energetical activities;
- drafts offer requests on the basis of the need and monitors the process of procurement;
- analyzes the causes of deficiencies that occur and proposes corrective measures in order to avoid their reappearance;
• Rig type: RC
• Rig name: Wirth, Satvia Mercedes, BTA Mercedes
• Location: Kazakhstan, Mongolia
• Water field name: Tortuduk, Uulan Aan
• Water depth: 30:285m
• Well depth: 300-600m
• Well temperatures and pressures: 10:12C°, 10:18 bar
• Rates of water flow: at least 25 m³/h
• Mud types and Systems (Drilling Fluids): Bentonite
• Specific problems encountered: green and red clay

EL-ME Coordinator, Cheef of water drilling equipment departament

DIGITECH ELECTRIC SRL

September 2008 - October 2009

Bucharest
• Location: Romania
• Responsibilities:

- coordinating EL-ME activities (mechanical-energetic, acquisition and transport) Romania area;
- proposes and monitors repair and maintenance schedules and programs;
- coordinates and monitors the execution of repair operations at all devices and equipment in order to provide the normal and continuous functioning;
- coordinates and monitors the execution of planned maintenance repair operations at all well head equipment and devices;
- drafts and proposes system and operational procedures for mechanical-energetical activities;
- drafts the need of materials and specific equipment necessary for best performance of water wells activities;
- drafts offer requests on the basis of the need and monitors the process of procurement;
- analyzes the causes of deficiencies that occur and proposes corrective measures in order to avoid their reappearance
- analyzes the market to find the most efficient suppliers
- drafts and proposes budget necessary for investments in mechanical, energetical and equipment tools for water wlls, and verifies provision of expenses in established budget;

EL-ME Coordinator, Cheef of water drilling equipment departament

FORADEX S.A

March 2001 - October 2008

in MIVAN-KIER PROJECT:" Drinkable water in Romanian Villages";
• Company: FORADEX S.A.
• Location: Romania
• Responsibilities:

- drafting of schedule proposals for the coordinated workshop;
- coordination of repair activities for fixed assets within the workshop (e.g: drilling rigs, top drives, autocranes, fork lift, mud pumps, engines, electronic control panels, etc);
- quality control of the performed works and personnel supervising;
- drafting, computing and signing lists of prices and execution of repair orders;
- monitoring and coordinating implementation of measures imposed by the S.C.FORADEX S.A. quality manual;
- equiping all water wells from the well head(own project) till the Grfundfos submersible pomps install.

• Rig type: RC
• Rig name: Wirth, FA 12, FA 32, Aquadrill
• Location: All Romanian teritory
• Water field name: Tortuduk, Uulan Aan
• Water depth: 30:285m
• Well depth: 100-800m
• Well temperatures and pressures: 10:12C°, 10:18 bar
• Rates of water flow: at least 14 m³/h up to 45 m³/h
• Mud types and Systems (Drilling Fluids): Bentonite
• Specific problems encountered: green and red clay, sand

El-Me Coordinator in Geo-Thermal Wells up to 3000m depth

FORADEX S.A

March 2001 - October 2008

• Period: 2001.03 to 2008.10
• Position: EL-ME Coordinator, Cheef of water drilling equipment departament in MIVAN-KIER PROJECT:" Drinkable water in Romanian Villages"; El-Me Coordinator in Geo-Thermal Wells up to 3000m depth.
• Company: FORADEX S.A.
• Location: Romania
• Responsibilities:

- drafting of schedule proposals for the coordinated workshop;
- coordination of repair activities for fixed assets within the workshop (e.g: drilling rigs, top drives, autocranes, fork lift, mud pumps, engines, electronic control panels, etc);
- keeping all kind of rigs( F 400, Aquadrill, Ingersoll Rand, Wirth, FA 32) in a propper running condition.
- quality control of the performed works and personnel supervising;
- drafting, computing and signing lists of prices and execution of repair orders;
- monitoring and coordinating implementation of measures imposed by the S.C.FORADEX S.A. quality manual;
- equiping all water wells from the well head(own project) till the Grfundfos submersible pomps install.

EL-ME Coordinator

SC FORADEX INTERNATIONAL

November 1997 - February 2001

• Location: LIBYA
• Responsibilities: Involved in Water Wells for the GMMR Project

- coordinating EL-ME activities (mechanical-energetical, acquisition and transport) Libyan area;
- proposes and monitors repair and maintenance schedules and programs;
- coordinates and monitors the execution of repair operations at all devices and equipment in order to provide the normal and continuous functioning;
- coordinates and monitors the execution of planned maintenance repair operations at all well head equipment and devices;
- drafts and proposes system and operational procedures for mechanical-energetical activities;
- drafts the need of materials and specific equipment necessary for best performance of water wells activities;
- drafts offer requests on the basis of the need and monitors the process of procurement;
- analyzes the causes of deficiencies that occur and proposes corrective measures in order to avoid their reappearance
- analyzes the market to find the most efficient suppliers
- drafts and proposes budget necessary for investments in mechanical, energetical and equipment tools for water wlls, and verifies provision of expenses in established budget;
• Rig type: RC
• Rig name: Soilmec G 100, Soilmec G 101, Schlumberger
• Location: Lybya
• Water field name: Ashuarif
• Water depth: 30:100m
• Well depth: 250-1000m
• Well temperatures and pressures: 10:12C°, 10:25 bar
• Rates of water flow: at least 80 m³/h up to2505 m³/h
• Mud types and Systems (Drilling Fluids): Bentonite
• Specific problems encountered: green and red clay, sand

Sales and Marketing Manager

SC KARTEX SRL

June 1995 - October 1997

• Location: Romania
• Responsibilities: Involved in AVIN Lubricants and GOOD YEAR Tires

- Sales and Marketing Manager - various kinds of lubricants and tires to be sold on Romanian market;
- Analyzes the market to find the most efficient suppliers;

EL-ME Coordinator - Mechanical, Procurement and Transport Directorate - Maintenance / Consumption Office

SC UA CHITILA S.A

January 1989 - June 1995

• Period: 1989.01 to1995.06
• Position: EL-ME Coordinator - Mechanical, Procurement and Transport Directorate - Maintenance / Consumption Office
• Company: SC UA CHITILA S.A.
• Location: Romania
• Responsibilities:

- Cheef of EL-ME Departament
- - coordinating EL-ME activities (mechanical-energetical, acquisition and transport) Romania area;
- - proposes and monitors repair and maintenance schedules and programs;
- - coordinates and monitors the execution of repair operations at all devices and equipment in order to provide the normal and continuous functioning;
- - coordinates and monitors the execution of planned maintenance repair operations at all well head equipment and devices;
- - drafts and proposes system and operational procedures for mechanical-energetical activities;
- - drafts the need of materials and specific equipment necessary for best performance of water wells activities;
- - drafts offer requests on the basis of the need and monitors the process of procurement;
- - analyzes the causes of deficiencies that occur and proposes corrective measures in order to avoid their reappearance

EL-ME Coordinator - Mechanical, Procurement and Transport Directorate - Maintenance

SC IAS Jegalia

August 1986 - January 1989

• Location: Romania
• Responsibilities:
-Cheef of EL-ME Departament
- coordinating EL-ME activities (mechanical-energetical, acquisition and transport) Romania area;
- proposes and monitors repair and maintenance schedules and programs;
- coordinates and monitors the execution of repair operations at all devices and equipment in order to provide the normal and continuous functioning;
- coordinates and monitors the execution of planned maintenance repair operations at all well head equipment and devices;
- drafts and proposes system and operational procedures for mechanical-energetical activities;
- drafts the need of materials and specific equipment necessary for best performance of water wells activities;
- drafts offer requests on the basis of the need and monitors the process of procurement;
- analyzes the causes of deficiencies that occur and proposes corrective measures in order to avoid their reappearance

Projects

Water Well Head

Water going out from a water well to the main water tank and distribution of it to a village or any other facilities, in an electronic way of function. Applied in Romania, Kazakhstan, Mongolia. Approved by Romanian Natural Resources Minister.

Great Man Made River Project, Libya

More than 250 water wells drilled for this Project

Qualifications & Certifications

Mechanical Eng

POLITECHNICAL UNIVERSITY OF BUCHAREST

Mechanical Eng eer g

Politechnical Institute of Bucharest

MIHAI VITEAZUL' High School

Mathematics and Phizics

MIHAI VITEAZUL' High School

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?