Joyce - Senior Welding Inspector - Hasselt, Flanders, Belgium

Mick Joyce

Hasselt, Flanders, Belgium

Services

Senior Welding Inspector

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Summary:

A well experienced confident and qualified Inspector throughout various aspects of the job working as a Clients Inspector and also for the Contractor.

Work History

Senior Welding Inspector/Clients Rep

E.ON

From March 2013

Working as a Clients Inspector for E.ON Climate & Renewables at Smulders group Antwerp on the fabrication of Transition Pieces for the Humber Gateway Windfarm Project overseeing all Welding,NDE, Reporting & final Documentation for the first 28 TP's of the project. Working in close proximity with the main contractors & sub contractors on the job to ensure all work was done within time & code requirements.

QA department

DOOSAN POWER SYSTEMS

October 2010 - March 2013

Working as a Senior Welding Inspector for DPS on the SCR Project at Ratcliffe Power Station. DPS are the main contractor on the Selective Catalytic Reduction Project.
My main duties on the project are overseeing all quality issue’s brought
up on a day to day basis with various Sub Contractors on the project but
mainly monitoring all welding activities by Doosan in the piping systems
for all four boilers using BS EN 12952 BS EN 13480 & BS EN 2633
including pre welding activities Weld set pre heat up monitoring of
welding i.e. volts amps etc visual of welded joints requesting of all NDE
as per code requirements PWHT when required.

DPS are the main contractor on the Selective Catalytic Reduction Project

EBARA Environmental Germany GmbH

February 2010 - June 2010

My main duties on the project are overseeing all quality issue's brought up on a day to day basis with various Sub Contractors on the project but February 2010-June 2010
mainly monitoring all welding activities by Doosan in the piping systems Clients Inspector Working for Ebara at SES Timache in Slovakia on the for all four boilers using BS EN 12952 BS EN 13480 & BS EN 2633 Fabrication of 3 sets of Identical Small Bore Super Heater Piping
including pre welding activities Weld set pre heat up monitoring of Systems. Reviewing coded welders using 141 TIG & 135 MAG Welding
welding i.e. volts amps etc visual of welded joints requesting of all NDE Processes. Ensuring all work is done as per Approved Procedure Visual as per code requirements PWHT when required Inspection of all work done, Inspection of all Approved NDE carried out
MT, PT & RT and witnessing of Pressure Testing. Submission of Daily
Inspection Reports and review off all Documentation from SES. Also
SAIPEM MEDITERRANEAN SERVICES Llc.
working at EBS Kraftwerk Site Frankfurt on the installation of these

Senior Welding Inspector

Stream Gas Pipeline Project

August 2010 - September 2010

monitoring WPQR'S the Nord
Stream Gas Pipeline Project for the completion of the 48" Onshore Tie- SMB Pipeline Systems
In's. Working in the Saipem Fab-shop in Rijeka Croatia on SMAW Welding

Senior Welding Inspector

Lindsey Oil Refinery

July 2010 - August 2010

July 2010-Aug 2010
Codes we are working to. Ensure all work carried out on site and shops
Working on a short term for TOTAL TEC France at Lindsey Oil Refinery are monitored and done correctly fit up of pipe work shelter from climate
Killingholme Reviewing QA Documentation from sub contract firms Jacob conditions pre heat/drying of pipework prior to Tacking/welding, checking
LES, Shaw, Ledwood, BIS O'Hare Fabricom, and IREM on the installation Isometrics are worked to & general welding inspection duties of Piping and Mechanical Systems on the new HSD-3 Plant which is
coming to an end at the Refinery.

Quality Manager

WPQR'S

August 2009 - February 2010

Ensuring all work done to the highest quality and Documented August 2009-February 2010
correctly. Also working in Saipem's Workshop in Cortemaggiore Italy Quality Manager on the installation of the new Air Separation Unit at BOC
witnessing 48" Double Joint SAW Welding to approve Flux Recycling Scunthorpe. Communication between Linde Engineering Site
Welded Joints for the Lay barge for the Off-Shore part of the Project Management/QA & SMB QA Head office is an essential part of my job
Running from Russia to Germany Again making sure all work also the creation of QA Documentation Packs, Manage the reporting
documented to the highest standard and documented correctly. system for all Quality/ Inspection issues, Introduction of weld cards for
Guaranteeing all Documentation handed to the Client was accurate and daily welding duties to Welding Inspection, Create NDE requests for all
correct for their review. NDE required, Interpretation of Radiographs, Observe Qualification of
Welders when testing as per EN & LE 145-10 review of Welder Certs.
BUREAU VERITAS UK Ltd Working with the Linde WSD system Control of all Welding parameters to ensure we reach all standards required within the EN & LE.

Multi Inspector

PPS Pipeline Systems

April 2009 - August 2009

National Grid
Apr 2009- Aug 2009 April 2006-May 2006
Working on the 610mm West Burton Gas Pipeline for PPS Pipeline Employed as a Multi Inspector on the National Grid Nacap Land And
Systems through ONPSL as a front end Main Line Welding Inspector also Marine 120KM 48" Pipeline running from Milford Haven to Aberdulais.
working on Special Fab's Tie Ins and Radiographic Interpretation when
Front End is not running.

QA/QC Welding Inspector

Easington Facility

September 2008 - April 2009

Sept 2008 - Apr 2009 on the Langeleld / Laing O'Rourke Project for the installation of Pipework
Working for the Client as The Project Piping Inspector on the Phase 2 Bio at the Easington Facility involved in the Welding Inspection radiographic
Gasoline Project Where Doosan Babcock are Installing a 300mm Ethanol interpretation and documentation for the client.
line for the Petroplus Refinery. making sure all work done was according QA/QC Welding Inspector at Total LOR on the installation of 316L to approved Quality plan and the Inspection test plan was correctly pipework on the FCCU/GCU Revamp prior to the 2005 Turnaround
carried out.
QA/QC Welding Inspector Zeebrugge Gas Compression Facility project
working in Immingham fabrication shops for Interconnector (UK) on heavy

National Grid

June 2008 - September 2008

Sentencing Radiographs for National Grid for the 900mm line from Isle of

Welding Inspector

Jacobs Engineering Department

March 2008 - June 2008

on Conoco No. 3 Reformer Project and Total LOR
Installation of S/S & C/S pipework for the HDS3 OSBL Project on Total
Shutdown responsible for inspection of carbon, stainless and various
LOR at Killinghome.
chrome pipework.

Senior Welding Inspector

AMEC

December 2007 - March 2008

Welding Inspector and QC

Air Products

September 2006 - December 2007

Stallingborough. Responsible for welding inspection on oxygen pipeline.
Also test pack preparation and final handover of documentation.

Bureau Veritas Aberdeen

July 2006 - August 2006

Clients Inspector

Laing O'Rourke

May 2006 - July 2006

on the Lageled Gas Receiving Facility at
Easington. Responsibilities include, surveillance of all welding and Welding Inspector on 36" Transco Gas Pipeline running from Maudlin to fabrication, witnessing of all testing and reviewing of NDE reports and St. Austell Cornwall.
Radiographs also validation of Test Packs and evaluation of all QA/QC
documentation.

QA/QC Welding Inspector

Fabricom Contracting Limited

October 2004 - March 2006

working in the Stainless/Carbon Fab shops

QA/QC Inspector

Grain to Shorn

September 2003 - October 2004

job. Mitsui Babcock, Selby
QA/QC Inspector. Responsible for validation and certification of all Test
AMEC Packs on the Novartis B150 Pharmaceutical Project prior to handover to

Moneypoint Energy Retrofit Project as a Senior Welding Inspector

Ireland in County Clare

July 2002 - August 2003

Welding Inspector on Nippon Gohsei/Mitsui SLEU Project involved in the pressure testing of all rack work piping and radiography
interpretation.
AMEC

Senior Welding Inspector on the Novartis Grimsby B150

May 2002 - July 2002

SPP100 B3-B7 Project. My duties include reviewing all Fabricators
documentation, marking up P&ID'S. Carrying out internal audits
May 2002 - July 2002 throughout the project Interpretation of Radiographs, witness of pressure
testing and all other types of mechanical and piping Inspection duties. M.A.P.E.L./AMEC Darlington
Radiographer on West Hull Re-enforcement Phase II Project. Front end
crawler technician on 42" Transco gas pipeline.

Third Party Inspector

Bureau Veritas at Aberdeen

July 2001 - December 2001

Involved in various types of work including Sub Sea Fatigue Tests, Sub Torch Integrated Inspection Services
Sea Valve Tests Flow Meter Inspection, F.A.T (Factory Acceptance Tests) Immingham Radiographer/Interpreter based at MB Construction
Sub Sea Hang Off Clamp Inspections Fabrication shop on pipework contracts and on site for Transco
Compressor Stations at Cambridge and Nether Kellet.