I am 35 years in the welding industrie I start my welding caree on the petrocamical plants, were I welded manny process piping and by supervising welding using the B31.3 specification. I was olso very active welding overland piping and supervise welding using the B31.4 specification. I olso weld and supervise on the power stations where we use the power plant specification B31.1. All these specification originate from the ASME IX. I also work on mines where we build Tanks and Structures i personly weld various processes and procedures for difirend companys. I was olso active supervising welders using the AWS: DI.I specification. I have much to tell but limited time now

Work History

Senior-Welding Supervisor

ALSTOM Wet Flue Gas Desulphurization Plant

January 2012 - February 2014

Duties to perform: Responsible for all welding and planning and
Organizing. Lead Sub Contractors for Alstom

Accountable Rev: Quality manager Roberto Greco
. 0795086000
Accountable Rev: Asst. Constr. Manager Isaac Motswagae
. 0823922609

Welding Supervisor

NATREF SHUTDOWN KENTZ

Duties to Perform: Planning and be in charts of Weld
Procedures and Certs make up WWPQR'S
Superintendent: Brain Muller Cell: 0748161516
Reason for leaving: END OF SHUTDOWN

Welding Supervisor

KUSILE FABRICATION

Up to January 2013

Duties to perform: Responsible of all welding. Using FCAW- E71T-1
Wire and FCAW- E81T-1 Wire Material 350WC
And 16Mo3 Building Ducting Components and
Bunkers. My key responsibilities are planning
Organization Control and Lead
Accountable Rev: Andy Williams
Contact Nr: +27 - 824784754
End of contract:

Welding Foreman

GRINAKER

March 2010 - September 2010

Duties: Build a Slug catcher using X65 Material Type
P1Gr1 - ER 70S-3/E7018-1 using low temp
P1Gr1&2 - SA 333 Gr 6 - ER70S-6 Carbon Steel
Stainless Steel 304L - 316L
Supervisor: Bruce Miller Cell - 0027-738923774
Reason for leaving I Finish my contract

Senior Welding Supervisor

ACTOM TUTUKA POWER STATION

November 2010 - January 2011

Duties: Weld boiler tube's and High pressure steam pipes
Repair Super heater, Reheater, Economiser, Nose
Using WPS with colour codes 15Mo3 White, 13Mo44
Bleu, 10CrMo44 Black, X20CrMoV121 Yellow, T91 Brown,
304LOrange, 316L Green P255GH Red
My Key Responsibilitys Planning, Organization, Control, Lead and Time
Superintendent Mark Abram's Cell: 0848136606 - 0745122805
Reason for leaving I complete the Shut down EOC

Welder

Aluminium

-ER 90S-B3 & 13CrM04-5
ER 80S-B2 Titanium Grade 2-12-7 Using Tig process.
Supervisor: Jeff 0027-792903536
Reason for leaving: E.O.C Company close down

Welding Foreman

STILFONTUIN GOLD MINE

July 2009 - February 2010

Duties: Weld tanks, structural steel and pipes
Use FCAW, SMAW, and GTAW procedure
Superintendent: ATTIE 0027-826911079
Reason for leaving E.O. Contract

Welding Supervisor

NEWGEN KWINANA POWER STATION GAS BOILER

January 2007 - March 2009

BLEU WATERS POWER STATION COAL BOILER
Starting Duties 29-01-2007 until 20-03-2009
Position: Welding Supervisor
My Key Responsibilitys: planning, Organization, Control, Lead and Time
Duties: Weld tubes and big bore pipes and structural steel
Materials P11-P22-P91-308L-316L-ER70S-4-E7018-A1
Project Superintendent: Roger Lucas 0061-419906321
Reason for leaving: Dew to recession i was force to leave the country

Welding Foreman, and than night shift Supervisor

June 2004 - January 2007

Duties: Welding heat exchanges, Pressure vessels and
Mining equipment material Carbon Steel,
Stainless Steel, Super Duplex, Titanium, Mornel,
INCONEL, CROME pipes progress we use GTAW,
SMAW, MMAW, GMAW, FCAW
SUPERINTENDENT Zur Wilson Tell: 0061-433667257
Reason for leaving my contract end


ALSTOM

Welding Supervisor

BABCOCK KENDAL POWER STATION

April 2004 - May 2011

Duties: Repair of Boiler, Economizer
Super Heater, Re heater and Auxiliary's
Welding Tubs using low Temp Carbon Steel
ER70S-6
Stainless Steel ER308-L ER309-L ER316-L
ER347-L
Nickel ER80S-N12 Inconel ERNICR-3
Mornel ERNICR-7 Alloy20 ERNIFECR-1
Superintendent: Cliffy Cell: 0825752189
Reason for leaving: Shutdown complete EOC

Multi coded welder

LOGI CHEM PROCESS ENGINEERING PALINDABA

January 1999 - December 2000

Duties: Weld stainless vessels and pipes using Tig& Stick
Process 316L Group1 Carbon Steel pipes
P1 Group 1 ER70S & E7018-1
Supervisor: Nutty Tel 0027-11-9543203
Reason for leaving: Contract end

SPECIALIZED WELDING WA AUSTRALIA

Multi coded welder

PETRO S.A. STEIN MULLER CONST SOUTH AFRICA

January 1992 - December 1998

Starting Duties: 27 -01-1992 until 18-12-1998 Position: Multi coded welder Duties: Weld boiler chubs and boiler headers using Tigprogress
Welding of tube sheets using Mig procedure
Reason for leaving: E. O .C Company close down
Supervisor: Neville Louw 0027-825199275

Multi coded welder

SASOL

February 1987 - December 1991

Duties: Weld Stainless pipes 316L -308L & Carbon Steel
P1-ER70-6

Qualifications & Certifications

Welding Inspector

TWI Technoloy engineering

Alabama Senior Secondary School Klerksdorp

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Supported Countries
Choose your country

×