Jamshidi - Tbm Epb Operator - Shahin Shahr, Iran

Mehdi Jamshidi

Shahin Shahr, Iran

Services

Tbm Epb Operator

Summary:

Operating Hord rock( double shield, single shield, main beem machine or Gripper Machine) and EPB Machine

Work History

EPB OPERATOR&SUPERVISOR

ROBBINS COMPANY

From September 2014

Project Name: Saleemanadadwater transfer Project ( Madhya Pradesh-India)
(EPB 326-329 ,EPB Ø=10.000MM, 12000m Tunnel with Hybrid EPB machine)

Responsibilities:
• Operation of Hybrid EPB Machine & Supervising (Tunnel Boring Machine) based on manufacture instruction (Robbins)
• Checking and repairing systems which include grout, bentonite,foam,greas and gear oil.
• Working with European partners
• Familiar with the Enzan system, i.e. calculation of parameters
• Training Indian personnel for operation TBM

EPB Operator & Supervisor

The Robbins Company

From September 2014

Responsibilities:
• Operation of Hybrid EPB Machine & Supervising (Tunnel Boring Machine) based on manufacture instruction (Robbins)
• Checking and repairing systems which include grout, bentonite,foam,greas and gear oil.
• Working with European partners
• Familiar with the Enzan system, i.e. calculation of parameters
• Training Indian personnel for operation TBM

EPB Operator & Tunnel Supervisor

The Robbins Company

From September 2014

Responsibilities:
• Operation of Hybrid EPB Machine & Supervising (Tunnel Boring Machine) based on manufacture instruction (Robbins)
• Checking and repairing systems which include grout, bentonite,foam,greas and gear oil.
• Working with European partners
• Familiar with the Enzan system, i.e. calculation of parameters
• Training Indian personnel for operation TBM

Gripper TBM Operator and Tunnel supervisor

Global Tunneling Experts

June 2013 - March 2014

Project Name: Neelum Jhelum Hydropower Project ( Pakistan)
(S-696/697 Gripper TBM Ø=8.500MM, 11000m Tunnel with Gripper TBM machine)

Responsibilities:
• Operation of Gripper TBM (Tunnel Boring Machine) based on manufacture instruction (Herrenknecht)
• Checking and repairing systems which include shotcrit, greas and gear oil.
• Working with European partners
• Familiar with the VMT system, i.e. calculation of parameters

EPB Pilot and Tunnel supervisor ● Novamber

HARA ESTABLISHMENT

Up to June 2012

Project Name: Qom metro line A.
(S-525 EPB Ø=9.360MM, 12000m Tunnel with EPB machine)

Responsibilities:
• Checking and repairing systems which include grout, bentonite, foam, greas and gear oil.
• Working with another units.
• Assembly and repair of TBMs: mechanic, electric, hydraulic
• Familiar with the VMT system, i.e. calculation of parameters

EPB Pilot

HARA ESTABLISHMENT

Up to September 2012

2012
Project Name: 7th line Tehran metro
(selli TBM.EPB 0916.127)( Ø=9.164MM, 12000m Tunnel with EPB machine)

Responsibilities:
• Operation of TBM EPB (Earth pressure balance) based on manufacture instruction (Selli)
• Checking and repairing systems which include grout, bentonite, foam, greas and gear oil.
• Working with another units.
• Assembly and repair of TBMs: mechanic, electric, hydraulic
• Lining of segments
• Familiar with the Tacs system, i.e. calculation of parameters

TBM Pilot and Tunnel supervisor

HARA ESTABLISHMENT

From September 2009

-Seprember2012
Project Name: Water Conveyance Tunnel Nusoud lot 1
(S-357 Hard Rock Ø=5.275MM, 13731m Tunnel with hard rock double shield machine)

Responsibilities:
• Operation of TBM (Tunnel Boring Machine) based on manufacture instruction (Herrenknecht)
• Checking and repairing systems which include grout, greas and gear oil.
• Working with another units.
• Assembly and repair of TBMs: mechanic, electric, hydraulic
• Lining of segments
• Familiar with the PPS system, i.e. calculation of parameters
• Finish Excavation tunnel in 28 month
• Excavation with 14 km Marti Conveyor Tunnel

TBM Pilot and Shift Manager

SABIR INTERNATIONAL COMPANY

January 2007 - January 2009

Project Name: Syria-Aleppo irrigation tunnel project
(S-124 Hard Rock single shield) (Ø=5.30M- 5430m)

Responsibilites:
• Operation of TBM (Tunnel Boring Machine)
• Dealing with co-workers issues
• Training Arabian personnel for Ring Building
• Familiar with the ZED system
• Finish Excavation tunnel in 18 month
• Disassembly of TBM

TBM Pilot

HARA ESTABLISHMENT

September 2004 - January 2007

Project Name: Water Conveyance Tunnel from Amir Kabir Dam to Tehran
(S-323 Hard Rock Ø=4.665MM, 15980m Tunnel with hard rock double shield machine)

Responsibilities:
• Working with personel for mobilize a job site
• Operation of TBM (Tunnel Boring Machine) based on manufacture instruction (Herrenknecht)
• Checking and repairing systems which include foam, grout, grease, bentonite, and gear oil.
• Working with another units and H.K personnel on troubleshooting issues
• Assembly and repair of TBMs: mechanic, electric, hydraulic
• Lining of segments
• Familiar with the VMT system, i.e. calculation of parameters

Qualifications & Certifications

navab safavi

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Supported Countries
Choose your country

×