Jilani - HVAC Engineer - Kolkata, WB, India

Md Nisar Ibrahimi Jilani

Kolkata, WB, India

Services

HVAC Engineer

Summary:

I am agraduate mechanical Engineer having 12+ years of experience in HVAC Site execution in India and Saudi Arabia

Work History

HVAC Engineer

MadhuconThermal Power

From April 2013

plant Project-2X60 MW capacity)
Advance Ventilation Pvt Ltd, New Delhi
Project Title: MEPL

Sr Site Engineer(HVAC)

Thermax instrumentation Ltd

From April 2013

Project Location: Tamminapatnam


Role Description: HVAC Engineer
Project Details: Madhucon Energy Pvt ltd(Power plant):

➢ Monitored project and ensured its proper execution.
Prepared the submittals required for the materials and ensured that they were in compliance with the specifications.
Monitored the project and tracked the delivery of the materials to the site, ensured that the shipping schedule meet the project schedule, and project progress in going on.

HVAC QA/QC Engineer

Saudi Aram co Total Refinery Project Approved

May 2012 - March 2013

(Oil & Gas/Refinery Project)
Manarah Al Jubail Construction Company Ltd, Jubail, KSA.

Project Title: SATORP Packge-9

HVAC QA/QC Engineer

Dayim Punj Lloyd

May 2012 - March 2013

Project Details: As an HVAC QA/QC Engineer I must be familiarized with the ITP and Checklist to be applying during raising RFI to the QCP. Understand Clearly the HVAC System drawing of the Projects.
Checked and Understand the HVAC equipment schedule plan, to know the equipment specification and identification of location where to be installed.
During the receiving inspection RFI must be checked the documents like approved PO, Delivery Note, Material Test Certificate, and Vendor Approval and carefully checked the equipment from any damage during the transport delivery or factory damage.
During installation of the equipment we have to follow SMACNA and ASHRAE.
Coordinate to the Construction Site Engineer before the inspection.

Sr Site Engineer (HVAC)

Minakshi Thermal Power

August 2008 - May 2012

plant Project-2X60 MW capacity)
Advance Ventilation Pvt Ltd, New Delhi
Project Title: MEPL

Thermax instrumentation Ltd

August 2008 - May 2012

Project Location: Tamminapatnam


Role Description: Sr.Site Engineer(HVAC)
Project Details: Minakshi Energy Pvt ltd(Power plant):

Monitored project and ensured its proper execution.
Prepared the submittals required for the materials and ensured that they were in compliance with the specifications.
Monitored the project and tracked the delivery of the materials to the site, ensured that the shipping schedule meet the project schedule
Organized the working of the project, procured the major items such as pumps, Chillers and exhaust fans, etc
Evaluated the job performed and provided the necessary follow up for payments.
Minakshi Energy Pvt ltd (Power plant): Completed erection of ducting and its insulation at 10 m LVL in the TG building at Unit 1 and Unit 2
Completed erection of ducting at 0 m, 4m and 10m LVL in the TG building at Unit 1 and Unit 2 and also completed the erection of ducting at Pv operating floor 0m &10m AB bay at unit 1&2 in the STG building. Completed the installation of 4nos AHUs (50TReach) and its piping and ducting connection to the plenum.
Completed the Installation of 3 Nos of Screw Chillers, 3 nos. of pumps its piping and insulation in the Plant room.
Erection of 13 nos of Roof Exhaust fan in the Roof of the STG building unit 1&2.
Installation of 4 nos of Blowers and its connection to the plenum at unit 1&2 in the TG building.
Installation of Exhaust fan in the different location of DM plant building, Switch yard control room, Intake Pump house, CW pump house, FOPH, Chlorination etc
Installation Fresh Air Unit in the different location of DM plant building, Switch yard control room, Intake Pump house, Chillers Plant Room, ESP control Room, Compressor Room, Transfer Room, AC Plant Room etc.

Gurgaon as Engineer (HVAC) (Mauser Baer Project

Blue Star Ltd

August 2005 - August 2008

Key Assignments
Developed the engineering equipment submittal and prepared contract drawings.
Evaluated the engineering drawings and coordinated to install the required equipments.
Assisted the customer and reviewed the work, gathered the customer's requirement and obtained a deadline for the project.
Monitored the project and tracked the delivery of the materials to the site, ensured that the shipping schedule meet the project schedule.
Documented project progress and submitted all financial projects to management.

Project Title: M&G, Thin Film-1&

Mauser Baer

August 2005 - August 2008

Project Location: Greater Noida


Role Description: Engineer(HVAC)
Project Details: Moser Baer India Ltd.: Completed erection work of 37 AHUS and its piping, ducting and insulation of clean room project of M&G site. Installed the BMS system of project M&G.
? Installation and commissioning of chillers, chilled water pumps & condenser water pumps; fabrication & erection of chilled water piping and condenser water piping and its insulation of project.

Erection of:
22 AHUS and its piping, ducting and insulation of project.
30 AHUS and its piping, ducting and insulation of clean room project of thin film -1.
2 Bry Air AHUS and its piping, ducting and insulation for cold room of project thin film -1

NOIDA as Site Engineer (HVAC) (Hospital

ETA Engineering Pvt. Ltd

August 2002 - August 2005

Hotel Project)
Key Assignments
Developed the engineering equipment submittal and prepared contract drawings.
Evaluated the engineering drawings and coordinated to install the required equipments.
Assisted the customer and reviewed the work, gathered the customer's requirement and obtained a deadline for the project. Monitored the project and tracked the delivery of the materials to the site, ensured that the shipping schedule meet the project schedule.

L.N.J.P Hospital, Maurya Sheraton

August 2002 - August 2005

Project Location: Dariyaganj, Ghaula Kuan


Role Description: Site Engineer(HVAC)
Project Details: Dismantling chilled water piping, condenser water piping & fabrication; erection of chilled water and condenser water piping & its insulation; installation and commissioning of chillers & pumps.
LNJP Hospital: Installation and commissioning of centrifugal chillers, pumps & fabrication; erection of chilled water piping and condenser water piping and its insulation.

Aircon Engineers Pvt Ltd

August 2000 - August 2002

New Delhi, Joined as GET
Key Assignment as GET
Handling the projects of Philips India Ltd by completed the erection of ducting and its insulation

Qualifications & Certifications

Engineering

Maulana Azad College of Engineering & Technology, Magadha University

HVAC DESIGNING AND DRAFTING

MEP CENTRE

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×