Deputy Manager Electrical


From October 2006

Ittehad Chemicals Ltd. is a heavy & continuous/chemical process industry, company is a major supplier of
Caustic Soda in Pakistan. Having its own gas-engine power plant with capacity of 30MW and also purchase power from domestic power company (WAPDA) which is 35MW via
132/11KV Grid Station. I am working in 132/11KV Grid Station, I report to my
Sr. Manager and Head of Department .I manage a team of 1 Qualified Engineer, 2
Supervisors 5 skilled Electricians and 2 Switch Board Operators. When any emergency comes,
I supervise team of skilled workers about 20 to 30 to solve that problem on top most priority.

Main Responsibilities:
-To ensure reliable power supply for continuous process industry.
-To Distribute & Control Power Supply at 132KV Grid Station.
-Maximum Demand & Load Control.
-Power Factor Control.
-Tariff Calculation & Billing.
- Units Consumption Analysis.
-Energy Monitoring & Conservation.
-Trouble shooting and maintenance of following Main Equipments at 132KV Grid Station.
➢ 10/13MVA, 132KV/11KV Power Transformers.
➢ SF6 Circuit Breakers.
➢ Current Transformers.
➢ Potential Transformers.
➢ Lightening Arrestors.
➢ Isolators.
➢ Vacuum Circuit Breakers.
➢ Protection Relays.
➢ Protection Supply.
-Testing & Inspection of 132KV Complete Bays of Power Transformers (10/13MVA).
Transformer Tests:
➢ T.T.R of Power Transformers.
➢ Voltage Ratio Test of Power Transformers.
➢ Short Circuit Test of Transformers.
➢ Insulation Resistance Test of Transformer Windings.
➢ Di-electric Strength Test of Transformer Oil.
➢ Transformer Oil Dehydration.
➢ Capacitance & Dissipation Factor Test.
➢ Earth Testing.
Protection Relays Tests:
➢ O/C, E/F & S/C Relay (CDG-61) Testing & Plug Setting.
➢ Differential Relay (7UT5125 Siemens) Testing & Marshalling.

Electrical Engineer


July 2005 - August 2006

IRRSA Switch gears company is the supplier of Switchgears Medium and Low Voltage
Panels in the Industrial zone of Lahore Pakistan. Where I take hold of 5 members team of 3
skilled Electricians and one Fabricator and a Fitter also. I reported directly to CEO.
-Design Medium Voltage Panels according consumers demand.
-Design Lighting Scheme for Streets and Roads.
-Design Star-Delta Starters for Induction Motors of various loads.
-To meet consumers complaint & to rectify the problems.

132KV Circuit Breaker Test

Protection Relays

(7SJ 5005, 7SJ 6025 & 7SK 88) Testing & Setting.
➢ Transformer Winding & Oil Temperature Relays Testing & Setting.
➢ Transformer Buchholz Relay Testing.
132KV Circuit Breaker Test:
➢ Contact Resistance Test.
➢ Timing Test (Closing & Opening Time of Contacts).
➢ Protection Test.

132KV Current Transformer Test:
➢ Insulation Resistance Test.
➢ C&DF Test.
➢ Current Injection Test (Ratio Test).
132KV Lightening Arrestor Test:
➢ Insulation Resistance Test.
132KV Potential Transformer Test:
➢ Insulation Resistance Test
➢ C&DF Test.
11KV Vacuum Circuit Breaker Test:
➢ Vidar Test.
➢ Contact Resistance Test.
➢ High Pot Test.
➢ Protection Testing.
➢ High Pot Test.
➢ Impedance Test.
➢ Specific Gravity Test.
➢ Cell Voltage Test.
➢ Ampere Hour Test.
➢ Thermo vision survey of Yard.
➢ DC Grounding Test.
➢ Earthing Integrity Test of Mesh.
-To follow & check schematic, control & terminal wiring diagrams of 132KV Grid Station Control, Protection Equipments and Panels.
Troubleshooting & Maintenance of Rectifier Transformers & Rectifiers.
➢ Rectifier Transformers.
➢ Rectifiers.
➢ Diode Rectifiers.
➢ Thyristor Rectifiers.
➢ ACPD (Anode Control Protection device) Panels.
➢ Ion Exchange Membrane(IEM) Rectifier.
Induction Motors Maintenance & Selection.
➢ Power Cable.
➢ Motor Drive.(Variable Frequency Drives).
➢ Motor Starter (Direct On line Starter & Star Delta Starter).
➢ Motor Protection Scheme.
➢ Over Current Protection.
➢ Thermal Protection.
➢ Thermography.
➢ Vibration Analysis.
➢ Bearing Selection.
➢ Winding Wire Selection.
➢ Troubleshooting & Maintenance of Induction Motors up to 160KW.

Selection & Planning for erection, modification & expansion according the demand of Plant.
➢ Power Cable Selection.
➢ To follow erection drawings.
➢ Power Factor Improvement Equipments Calculation & Selection with respect to the Load.
➢ Lighting System Calculation...


Project Engineer

 Grid System up Gradation with AREVA Pakistan.
 Parallel Operation of Power Transformers 03Nos. (10/13MVA) on One Bus.
 Synchronization & Phase Sequence Confirmation of Power Transformers with Wartsila Pakistan.
 Grid System Renovation & Replacement of 132KV Gantries, Conductors, Clamps & Equipments with WAPDA (LESCO) Pakistan.
 Up gradation of Electrolysis Cell Room by Installation & Commissioning of ACPD (Anode Cathode Control Device) Panels with DENORA ITALY.
 Erection & Commissioning of Calcium Chloride Plant with NIVOBA Netherland.

 Grid System up Gradation with AREVA Pakistan

we have worked with Areva Pakistan for upgradation of 132KV Grid Station at ICL KSK Pakistan.
we have brought 03Nos. 10/13MVA P-T/Fs on one BUS by Parallel Operation for increasing Plant Load.

Qualifications & Certifications

Bachelor Of Engineering (Electrical Power)

QUEST Nawabshah Sind Pakistan

Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Mazhar Ali Lakho provides the following services:

Supported Countries
Choose your country