Smalis - Engineer - Athens, Attica, Greece

Mavroudis Smalis

Athens, Attica, Greece

Services

Engineer

Work History

Owner

KIROMITIS

September 2004 - September 2007

of Peloponnese
Position held: Project Manager - Contract Administrator
Brief Description of the project: Construction of highway (excavation, embankments, bridges, asphalt works, etc)

2nd Project: "Construction of Litheos Dam" at Thessalia region (Central Greece). Owner: Greek Government / Prefecture of Trikala
Position held: Project Manager - Contract Administrator
Brief Description of the project:
• Construction of a Combined dam (left side: constructed by Roller Compacted Concrete, right side: earth dam with core of clay material),
• Construction of Spillway, Overflow Channel, Diversion Structure, Water Supply - Discharge Structure, Transportation Pipeline.
• Construction of Access and Restoration Roads, Contiguous Structures

Self - employment

March 2004 - August 2004

Construction Consultant Engineer / Subcontractor

Athens - Greece

Position held: Construction Consultant Engineer / Subcontractor

Project & Contract Manager / Legal Representative

Construction Company

May 2003 - February 2004

1st Project: "Construction of Highway Florina - Kozani" at West Macedonia region (NW Greece). Owner: Greek Government / Ministry of Public Works / Roadworks Section
Position held: Project & Contract Manager / Legal Representative
Brief Description of the project: National highway construction (earthworks, bridges, concrete & asphalt works, etc) of length 42 km.

2nd Project: "Construction of Volos City Diversion Highway (Section between Larisa and St. Paraskevi (Krafsidonas)intersections)" at Thessalia region. Owner: Greek Government / Ministry of Public Works / Roadworks Section

Project Manager

ALTE Group

July 2001 - May 2003

1st Project: " Papadia Dam, Water supply of Meliti Power Plant - Ahlada" at Florina region (North Greece). Owner: Greek Electric Power Supply Company (Δ.Ε.Η.)
Position held: Project Manager
Brief Description of the project:
• Construction of earth dam with core of clay material, total volume about 3,500,000 m3 - Creation of reservoir with storage capacity 14 Χ 106 m3.
• Construction of Drainage and Grouting Galleries in approximate total length 400m., Curtain Grouting and Grouting Wall in the formation of the foundation.
• Construction of an open Overflow structure (concrete volume 8,500 m3), Extraction Channel, Diversion Structure, Water Supply - Discharge structure
• Construction of Water Supply Pipeline,
• Construction of Access and Restoration Roads.

2nd Project: "Construction of 4 bridges and Side Roads between km 387-399 of the New Railway Athens - Thessaloniki" Owner: Greek Railway Organization.
Brief Description of the project: Earthworks, Bridges' Construction, Reconstruction of an old Railway metallic bridge, concrete & asphalt works etc.
Position held: Project Manager. Some of the responsibilities:
• Overall supervision of the construction and coordination of the works
• Organization of equipment and manpower,
• Monitoring and control of production and material transportation
• Follow up Time schedule and Quantity Survey of the Project

Jordanian Government / Ministry of Water Irrigation - Jordan Valley Authority

September 1999 - June 2001

September 1999 - June 2001
Construction Company: AEGEK - HIDROGADNJA J.V.
Project: Mujib Dam - Jordan. Client: Jordanian Government / Ministry of Water Irrigation - Jordan Valley Authority.
Brief Description of the project:
Combined Construction of RCC (Roller Compacted Concrete) dam, with Earthfill Abutments.
Volume of RCC: 750,000 m3,
Volume of Earthfill: 1,800,000 m3
Exploitation of basalt quarry, Production of aggregates, Construction of Galleries, Spillway, etc
Position held: Deputy Project Manager & Construction Manager, with the following activities and responsibilities:
• Set up of site,
• Coordination for erection of plants (Crusher, Concrete and RCC Batching plants, etc.)
• General coordination of the works among the Construction Sections of the dam organization (Earthworks, RCC, Concrete, Drilling & Grouting, Laboratory, Mechanical & Electrical, Design, Planning)
• Follow up of project through its construction phases (excavation, blasting, concrete structures, crusher management, quarry management, diversion works, plants' operation, RCC placement, etc.)
• Contract Administration
• Cooperation with the Client and the Consulting Engineer (LAHMAYER INTERNATIONAL - HAMZA ASSOCIATES)

Construction Manager

ARCHIRODON

February 1999 - August 1999

Construction (Overseas) Co. SA
Project: Dubai Aluminium Co. (DUBAL)'s Generation Power Area / Phase II / Cooling Water System / Offshore Intake Pipework - Dubai - United Arab Emirates: Short marine project consisted of: Dredging offshore trench, installation of GRP pipes of dia 2000 mm in a pipe-line of three (3) km in length under the sea and backfilling with aggregates and natural material. The particular specialized project, involved specific equipment and machinery (floating cranes, barges and a special structure to place the pipes in a trench at the bottom of the sea).
Position held: Construction Manager, with the following responsibilities:
• Organization of floating equipment and manpower,
• Construction and preparation of the special hydraulic structure (named "horse") that was handling and placing the 24 m pipe strings at the sea bottom trench.
• Assembly of pipes on shore
• Transportation of pipe strings on barges
• Installation of pipes offshore
• Supervising Surveying works and GPS management for barges and pipes positioning
• Backfilling procedures

Head of Section for Pavement

HOCHTIEF Betonstrassenbau GmBH

April 1998 - February 1999

works, which involved placement of: Top Subgrade Course, Selected material Sub-base Course and Cement Treated Base-Course in Runways, Taxiways, Aprons, with the following responsibilities:
• Organization of machinery and labour,
• Coordination among the sections of the project,
• Overall supervision of the construction
• Monitoring and control of production
The layer works involved latest technology equipment like: Pavers, trimmers, finishers, etc.

Main Contractor

HOCHTIEF SA

Up to April 1998

Position held: Earthworks and Concrete works / Construction Engineer, with the following responsibilities:
• Site installations,
• Provisional works,
• Utilities and Buildings (Main Terminal Building, PTS tunnel, bridges, Auxiliary buildings)

Spata - Greece

October 1997 - February 1999

Construction Manager

ARAL General Construction and Designs

January 1993 - June 1996

(San Jose - Costa Rica)
A company with major activities in the construction of metallic structures, general structural works and earth moving works.
Position held: Construction Manager of several projects, with the following responsibilities:
• General follow up of projects,
• Elaboration of drawings,
• Structural analysis,
• Construction and Cost Control of projects.
Projects: Some particular projects, as following:
o Golfito's tax free zone shopping center Warehouse - Metallic / Masonry structure (Construction Manager)
o Limon's region identical middle class houses (Construction Manager)
o Monterey Residences - Luxury villas (Construction Manager)

Construction Engineer, in projects

Roth & Wong Co

February 1992 - December 1992

(San Jose - Costa Rica)
A company with major activities in the design and construction of deluxe villas and office buildings.
Projects & Position held: Construction Engineer, in projects like:
o Carriari Residences (36 deluxe villas),
o Savannath Office Buildings,
o Escazu residences,
o Paseo Colon buildings,

Monteverde Construction

March 1990 - January 1992

(San Jose - Costa Rica)
A company with major activities in earthworks, roads', pavements' and bridges' construction.
Projects & Position held: Some particular projects, as following:
o Quepo's National Highway Construction: Site Engineer following excavations, backfilling and layer works,
o Atlantic side Wastewater Drainage system: Section Engineer for excavations, pipe placing, quantity survey and cost control,
o Porto Viejo Restoration of bridge: Chief of Section for foundation in river bed, construction of piers, installation of precast segments of the bridge. Construction, quantity survey and cost control,
o Sarapiqui Hydroelectrical Dam - San Carlos: Chief of Construction section. Earthworks, excavation, blasting, aggregates' production. Volume of earthfill dam: 700,000 m3.

Qualifications & Certifications

Universidad de Costa Rica

Civil Engineering

Universidad Panamericana