Services

CTO ( Control Tower Operator) Anchor Handling

Summary:

Offshore Oil & Gas

Work History

Rigger / Scaffolder / HSR Rep / Franna Operator

WPF (WILSON PIPE FABRICATION)

June 2008 - September 2009

APACHE ENERGY
VARANUS ISLAND / ALPHA HARRIET PLATFORM / STAGG
POSITION Rigger / Scaffolder / HSR Rep / Franna Operator

Repair work on the Gas Processing Plant following the 2008 Explosion

RIGGING -Rigged up many very large lifts, Lge Valve Installations, New pipework, flow lines etc New Steel Erection& Installation, Basic rigging for mechanical fitters electricians etc, Upgrading, Load cell Testing and Inspections. EGT (European Gas Turbine) Core Changes

SCAFFOLDING -Erected& dismantled all types of scaffolding, Very Large Hanging Scaffolds, Spur Scaffolds Truss-out, Independent Towers, and Birdcage scaffolds a large amount of over the side(all incidents free)

CTO - Control Tower Operator

McDermott International

From October 2007

Level 2 Compliance Coordinator
Rigger / Scaffolder Leaderman

Projects Completed
Safaniya Phase 2 Pipeline Installation Saudi Arabia

Ketapang Pipeline Installation & Jacket, Topside installation Surabaya Indonesia

Kepodang Pipeline Installation & Jacket, Topside installation for PETRONAS Indonesia

Pipeline Installation in The Caspian Sea Azerbaijan for BP
Tapas Q Installation Kuantan Malaysia
Macedon Project Phase 2 NthWest Shelf (Western Australia)

ONGC Cluster Mumbai India
Macedon Project NthWest Shelf (Western Australia)
KTT Kipper Tuna Turrum Bass Strait Australia
Pluto Jacket & Topside Installation Nth West Shelf (Western Australia)

Angel Project Woodside Australia Nth West Shelf (Western Australia)

Vessels
Derrick Barge DB30
Derrick Barge 101
Pipe lay Barge PLBH Azerbaijan
North Ocean 102 (DP) Horizontal Lay Vessel
North Ocean 105 (DP) Vertical Lay Vessel
Kalinda Pipelay Barge

Level 2 Compliance Coordinator

Duties Include
Initiate RFID System & create a database
Prepare and Create Reel files for all Wire Ropes, maintain the Reel file contents as required..
Prepare inspection forms, such as Receipt inspection, Storage
inspection, Inspection prior to service, As-installation inspection,
Monthly inspection, Critical lifts inspections, Quarterly and Annual
Inspections
Assist the 3rd Party W. Rope inspectors in conducting the
Electromagnetic (E-Mag) testing of all the Critical main crane ropes, (or
Class A Ropes as per McDermott Wire Rope procedure

Prepare the Barge wire ropes inventories & report, include spare ropes,
Inspection, installation, lubrication, daily notes and Wire Rope Trends, and send all reports to the Wire Ropes Superintendent (Morgan City),
E&M Depart, Marine Base and other related department as a monthly
basis.
Keeping and maintain the inventories records, Mill Certificates and 3rd~arty Certificates for all Wire ropes, Slings, Webb Slings,
Rope Cordage, Scaffolding Materials, and other misc. working tools &
lifting...

Rigger / Scaffolder

UNITED GROUP RESOURCES

December 2006 - September 2007

B H P BILLITON
GRIFFIN VENTURE FPSO

Offshore Oil & Gas Processing & Storage Facility
POSITION Rigger / Scaffolder Permit to Work Holder
RIGGING -Rigged up many very large lifts, Lge Valve Installations, New pipework, flow lines etc, Risers to Jacket, New Steel Erection& Installation, Basic rigging for mechanical fitters electricians etc, Wire Rope change out on Favco Cranes &maintenance of, Crane Dismantling, & Upgrading, Load cell Testing and Inspections. EGT (European Gas Turbine) Core Changes
SCAFFOLDING -Erected& dismantled all types of scaffolding, Very Large Hanging Scaffolds, Spur Scaffolds Truss-out, Independent Towers, and Birdcage scaffolds over the years, topsides and a large amount of over the side(all incident free)

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?