Marian Rotaru

Macau, Guangdong, Macao

Services

Electrical Engineer

Work History

Senior Electrical Engineer Project Specialist Infrastructure Facilities Remote Desert Location

AMEC Oyu Tolgoi Rio Tinto Mining Project - Mongolia

June 2012 - July 2013

$7 Billions

Position: Senior Electrical Engineer Project Specialist Infrastructure Facilities Remote Desert Location

• As PMT Client Authorized Representative act for commit subcontractors in regards to all matters under the contract and managing day to day activities for the construction, commissioning and operation of Electrical Infrastructure Facilities.
• Managing subcontractors involved in construction, commissioning and operation of electrical HV systems, 220KV substation switchyard, 35KV HV substation, gas insulated switchgear, Diesel Power Stations, Facilities of the plant.
• Reviewing designs and single line diagrams and issue Isolation and switches procedures.
• Checking and validate SWP (standard work procedures) for HV Substations and DPS power generation facilities.
• Implementation of commissioning, energization, electrical changeover and initial operation of safe HV/MV/LV Electrical systems and DPS power generation facilities.
• Perform energization inspection for 220 KV/35KV/10.5KV/6KV substations prior Back feed Energization
• As Senior Authorised Person managing the Permit-to-Work, LOTO HV, MV Isolation lock and Switching.

Electrical/C&I PMC Site Superintendent

Initec Energia Navoi Combine Cycle Gas Turbine

February 2011 - May 2012

475 MW Project - Uzbekistan $650 Millions

Position: Electrical/C&I PMC Site Superintendent
• As PMC Authorized Representative act for commit subcontractors in regards to all matters under the contract and managing day to day activities for the execution of E & I works.
• Managing subcontractors involved in construction, commissioning of electrical and instrumentation systems in the plant, switchyard, HV drive, gas insulated switchgear, MHI Gas Turbine, HRSG and associated control systems for Combine Cycle Gas Turbine 475 MW Power Station and turnover of systems to the operation team.
• Reviewing designs and specifications prior to installation.
• Implementation of commissioning, energization, electrical changeover and initial operation of safe HV/MV/LV Electrical systems of the plant
• Perform preenergization inspection for 220 KV/6KV/400V substations prior Back feed Energization
• As Senior Authorised Person managing the Permit-to-Work, LOTO HV, MV, LV Isolation lock and Switching.

Electro Tharwat Main EPC Contractor for E

C & I Works

August 2008 - January 2011

Nubaria III Combine Cycle Gas Turbines 750 MW Project - Egypt $750 Millions

Position: Site Project Manager
• As Contractor Authorized Representative and Key Personnel act for commit contractor in regards to all matters under the contract and managing day to day activities for the execution of E & I works.
• Responsible for implementation of project execution plan, control costs, ensure smooth teamwork and client satisfaction in order to achieve the project milestone target dates and to obtain the approval of Construction Completion Certificates.
• Identify and control project risks and opportunities, ensure compliance with company HSE, QC and overall international standards, conduct project related internal/external communications, ensure timely delivery within budget.
• Represented the company in weekly progress and coordination start up meetings with the Bechtel - EEA Consultant, the Owner Egyptian Electricity Authority and the other contactors.
• Managing and monitoring of a work force of 160 engineers and technicians involved on construction/precommissioning/commissioning/start-up/energization/electrical changeover/initial operation of Combine Cycle Gas Turbines 750 MW Power Station.
• Duties involved E & I works for HV/MV/LV Substations and associated Transmission & Distribution Switchgears/Lines, Load Centres, MCC's, 500 KV Step up Transformers, GE - Gas Turbines and HV drives, HRSG, Control Room and associated control and protection systems.
• Review all engineering drawings, specifications and installation procedures prior to installation.
• Coordinate with client preenergization inspection for 500 KV/6KV/400V substations prior Back feed Energisation.
• As Senior Authorised Person managing the Permit-to-Work, LOTO HV, MV, LV Isolation lock and Switching.

Electrical Engineer Field Superintendent PMC Remote Desert Location

Crude Oil

May 2007 - July 2008

Gas and Sulphur Refinery Project Kazakhstan - TCO project Tengiz $ 5 Billions

Position: Electrical Engineer Field Superintendent PMC Remote Desert Location

• Duties involved electrical works and craft supervision for Hazardous Area Electrical Installation, MV/LV Substations and associated Distribution Switchgears, LPG Storage, handling & metering, Sulphur phorming, Oil & Gas separation, Gas Compression, HP Amine Contactor, Sweet Gas Dehydration, Propane Dehydration, Sulphur degassing & recovery, Cooling Towers, Thermal Oxidizer, Tyco Heat Tracing.
• As managing the installation, precommissioning and commissioning of Electrical systems and Heat Tracing system liaison with mechanical and piping departments and checking of isometric drawings carried out on a daily basis.
• Review/approval all drawings, specifications and installation procedures prior to installation..
• Lead the teams of 4 Electrical Subcontractors consist of more than 130 engineers and technicians.
• Managing the Permit-to-Work, LOTO Isolation lock and Safety Tagging for the Heat Tracing system.
• Fluor/Chevron TCO training courses for Permit to Work, H2S Sour Gas Environment, EER, Fall Protection and PLSC.

Electrical Superintendent PMC Remote Harsh Condition Location

PETROFAC PMC Client Group

March 2006 - April 2007

Gas Condensate Plant Integrity Upgrade Brownfield Modification Project - Russia Novy Urengoi Siberia $ 350 Millions

Position: Electrical Superintendent PMC Remote Harsh Condition Location.

• Coordinating and monitoring the Electrical Sub-Contractors involved in design, erection, pre-commissioning/commissioning/energization, NGL and gas treatment plants in high H2S Hazardous Area environment.
• Duties involved electrical works and craft supervision for MV/LV Substations and associated Transmission & Distribution Switchgears/Lines, Boiler House, Control Room, HP/LP Flares, Air Compressors, A.G.D.S, Gas Separator Units, Condensate Pump House, Methanol Pump House, Heat Tracing System.
• Review/approval all engineering drawings and installation procedures before to passing them for use.
• Approval of site design change notices and issuing of red marks and as built drawings.
• As signatory to AFC drawings liaison with design subcontractor carried out on a daily basis.
• Attending and approved the FAT for MV and LV switchboards fabricated in Russia.
• Lead the teams of 3 Subcontractors consist of more than 110 engineers and technicians.
• Managing the Permit-to-Work, LOTO Isolation lock and Safety Tagging system for the electrical distribution systems and field.

Electrical, Control and Instrumentation Superintendent PMC Black Sea location

Blue Stream Project

November 2004 - February 2006

Russia Beregovaya Gas Compressors Station for Subsea Gas pipes $ 2.5 Billions

Position: Electrical, Control and Instrumentation Superintendent PMC Black Sea location.

• Coordinating and monitoring the Electrical and Instrumentation Sub-Contractors involved in erection / pre-commissioning / commissioning/reliability and maintenance activities.
• Duties involved electrical and instrumentation work and craft supervision for GE/NP gas turbines and turbo compressors, MV/LV Substations and associated Distribution Switchgears and Fibre Optic cables, Power Centres, MCC, UPS and battery, Gas Pipes I&C, Heat Tracing System and ESD in Hazardous Area.
• Coordination of erection / pre-commissioning / commissioning of Building Services including cooling units, telecommunication systems, fire alarm and fire detection, lighting and anti-intrusion systems.
• Review/approval all engineering drawings and installation procedures before to passing them for use.
• As signatory to system control and inspection of Check sheets liaison with QA/QC department carried out on a daily basis.
• Lead the teams of 5 Subcontractors consist of 180 engineers and technicians.
• Managing the Permit-to-Work, LOTO Isolation lock and Safety Tagging System for the electrical and instrumentation fields.

Electrical, Control and Instrumentation Superintendent Remote Desert Location

SAIPEM PMC

August 2002 - October 2004

Electrical, Control and Instrumentation Construction Manager

TECHINT CIMIMONTUBI

May 2001 - August 2002

Electrical Site Manager Remote Desert Location

Balfour Kilpatrick International

August 2000 - April 2001

Cairo - Egypt Water Supply for Al-Sheikh Zayed City $ 350 Millions

Position: Electrical Site Manager Remote Desert Location.
• Managing and monitoring of a work force of 70 engineers and technicians involved on construction/commissioning/energization/reliability of Water Supply and Water Treatment for Al-Sheikh Zayed City.
• Managing the complete installation of plant equipment at Intake and Booster Pumping Stations including the provision of all necessary supervision, skilled and unskilled labour, materials, temporary power, fuel, construction equipment and appurtenances necessary for the complete and satisfactory erection, testing and commissioning of the Plant in accordance with the Specifications and requirements contained in the Contract.
• Responsibilities include supervision and testing of MV& LV distribution switchboards, MV/LV and fibre optic cables, and fire fighting system and Building Services including Headquarters building.
• Supervision of erection, testing and commissioning of SCADA and associated control system.
• Managing the safety clearance tag/isolation lock and Permit to work system.

Electrical Construction Manager

Egypt - Ayoun Moussa

March 1998 - August 2000

Electrical Commissioning - Turn-over Manager

Ansaldo Industria Ltd

January 1997 - March 1998

Cairo - Egypt Kureimat 2x600 MW Thermal Power Station Project $ 950 Millions

Position: Electrical Commissioning - Turn-over Manager.
• Responsible for turn-over of the system to El-Kureimat Power Station 2x600MW from commissioning to operation consists of the following.
• Providing input to the turn-over plan and scheduling specifying priorities for the turn-over.
• Reviewing system and signing turn-over packages for acceptance.
• Assigning commissioning personnel to perform walk downs.
• Initiating a turn-over punch list to identify any change in construction status after a system has already been turned-over to commissioning team.
• Assigning personnel from the erection team to perform walk downs.
• Obtaining all necessary approvals and required signatures to accomplish the turn-over.
• Lead a team of 40 1st and 2nd engineers and technicians involved on inspections, testing, commissioning/energization/reliability and loop checking for the following equipments.
• High voltage start-up 220/6.3kV transformer, sub-stations, switchgear and associated protective relays.
• 500/220kV transformers and associated protection panels including UPS and DC distribution panels in 500kV GIS.
• Babcock oil fired boiler, GE Turbine and BOP plant with associated control systems.
• Medium and low voltage motors.
• Motor Control Centres.
• HVAC system and MOV (motorised valves).
• Uninterruptible Power Supply System (UPS)
• Westinghouse DCS Control System.
• Managed the start-up activities for the above.
• Managed the safety tagging for the electrical and instrumentation field.

Electrical Commissioning / Start-up Engineer Remote Desert Location

Sidem - France - Jabel Dhanna U.A.E

February 1996 - August 1996

250 Millions Project

Position: Electrical Commissioning / Start-up Engineer Remote Desert Location.

• Responsible for erection, testing, pre-commissioning, commissioning and start-up/energization of Power and Desalination Plant 2x2 MGPD, MED Desalination Unit.
• Checking of wiring diagrams, commissioning and start-up of the following equipment.
• Babcock gas and oil fire boiler, fuel oil storage unloading and pumping station, gas pressure units.
• Westinghouse - ACB & MCCB with DIGITRIP RMS UNIT.
• Merlin Gerin - Transformers 11/0.4kV and RMS Unit Switchgear.
• Merlin Gerin-MCCB.
• Cutler Hammer-MCC.
• Cutler Hammer-C311 Digital Motor Protection.
• Dual DC charger and ERSKYNE UPS system.
• Lead a team of 35 employees consisting Electrical and Mechanical activities.

Electrical Erection / Commissioning Engineer

European Gas Turbine - Germany, Ajman

April 1995 - February 1996

Dubai, U.A.E.
$ 150 Millions Project

Position: Electrical Erection / Commissioning Engineer.
• Completed erection and commissioning of frame 5 and frame 6 50 MWGE Gas Turbine with MKIV Speedtronic and auxiliary plant.
• Completed erection/ commissioning/energization of 33kV GIS including SF6 circuit breakers, disconnector switches, earthing switches, electrical changeover and associated remote PLC panels.
• Lead a team of 25 employees consisting of the following activities:
o Raychem and Pfisterer plugs termination and sealing end for MV&LV 11kV cables.
o Complete installation and commissioning of a SF6 insulated 33kV - 40 KA AEG GIS.

Quality Assurance Manager

Elcomex Ltd

March 1993 - April 1995

Responsible for the policy and the principles of the company during erection of Nuclear Power Plant (2x700MW).
• Interfacing with 8 different Mechanical and Electrical Contractors on solving the construction interfacing during erection and commissioning of Nuclear Power Plant.
• Preparing QA/QC manual and procedures.
• Responsible for auditing company quality assurance program to insure specifications, codes, and standards are adhered to.
• Implement QA program during erection and commissioning of nuclear power plant.

Senior Electrical Engineer

Nuclear Power Plant Construction Cernavoda - Romania

March 1987 - March 1993

Training courses for operation of CANDU NUCLEAR POWER PLANT 2x700MV
• Training course in quality assurance, ISO 9000 series
• Review/approval of engineering drawings, calculations, documents and EPC contractors electrical selection
• Craft supervision for erection of electrical systems and equipments.
• Oversee site construction for the installation of electrical commodities, equipments and raceways system program
• Coordinate with QA relating QA records and reconciliation corrective actions if needed.
• Checking the wiring diagrams and loop checks for protection system of power plant.
• Lead a team of 40 1st and 2nd engineers and technicians involved on engineering activities and commissioning/energization of electrical system and voltage distribution network.

Dispatcher Transmission and Distribution Manager

Electric Network Company Slatina - Romania

September 1980 - March 1987

Managed a team of 150 employees 1st and 2nd engineers and technicians involved in operation of 220/110/20kV sub-stations.
• Preparing and approving of drawings for electrical normal schemes.
• Commissioning of electrical system and equipments from 220/110/20kV sub-stations.
• Managed operation of 220/110/20kV sub-stations, Transmission and Distribution network.

Qualifications & Certifications

Electrical Engineering

University of Craiova