Commissioning Telecom Engineer

Quezon City

April 2012 - March 2013

Project Name: GLOBE NEMESES Transformation Project (Globe Telecom)

* Perform site survey and site collocation.
* Responsible documentation of site survey reports such as equipment proposal & floor plan layouts.
* Install and Commission Huawei BTS3900L for indoor and Huawei BTS3900A for outdoor.
* Spectrum Analyzer and Sweep test (ANRITSU site master).
* Call NOC CM for Functionality testing after integration and alarm simulation and activation.
* Make site folder and Acceptance.

Commissioning Telecom Engineer

ETSI Technologies Inc

May 2010 - March 2012

A. Project Name: GLOBE 3G SWAP OUT & Node B Upgrades (Globe Telecom)

* Installation, Functionality Testing, Commissioning, Troubleshooting, Configuration & assist NOC during Integration, of NSN 3G Flexi WCDMA for (GLOBE TELECOM).
* 3G FLEXI WCDMA FSMB, IUB, 2nd Frequency, Dual IUB and Full IP Upgrades.
* Power Tapping (ELTEK & EMERSON Rectifiers and other brands).
* Facilitates Telecom implementation final acceptance with customer/operator representative.
* Site Survey.

B. Project Name: 2G ERICSSON (GLOBE TRX UPGRADE PHASE 16) (Globe Telecom )

* Integration of GSM 900 & 1800 ERICSSON RBS 2202, 2206, 2206v2, 2106, 2106v2, Installation, Functionality Testing, Commissioning, Troubleshooting, Configuration, Create and Install IDB and Assist BSC during 2207, 2107, 2216, 2216v2, 2116, 2116v2 and for GLOBE TELECOM.
* Conduct modular plug-ins & upgrades such as TRU's & DTRU's, Re-Commission BTS sites and install new IDB's for new configuration settings.
* Responsible in the installation of rectifiers (Emerson, Eltek, Ascom).
* Installing of BTS antenna into a self-support, guyed tower and it into proper direction in accordance to site specification.
* Experienced in the use of test equipment: Spectrum analyzer and Sweep test, (ANRITSU Site Master).
* Conduct on site intense 2G BTS troubleshooting for those problematic sites before & after integration.
* Facilitates Telecom implementation and provide site technical survey reports. Final acceptance with customer/operator representative.
* Survey the site and then makes some proposed location.
* Responsible for documentation of site folders and site data.

Telecom Installer

4FOX Technologies, Inc

November 2008 - December 2009

A. Project Name: Globe Project Gemini (Globe Telecom)
* Installation of Alcatel-Lucent IP DSLAM equipments such as RU 7324, 7330 ISAM-XD,
ISAM-FD, 7450 ESS1, ESS6, ESS7 switch, 1660 SMC, 1662 SMC (transmission).
* Power- tapping TRU (top rack unit) equipment to rectifier.
* Cabling, cable lazing, krone blocks termination, grounding.
* Fiber lay-out of patch cord, equipment to ODF (optical distribution frame) side.
* Terminate E1cable to amphenol, RJ 45 connector & UTP cable.
* Testing Rx (receiver) & Tx (transmitter) in the ODF side, optical meter.
* Installation of Fiber Guide.
* Testing of IPDSLAM such as cable continuity test, internet browsing.
* Power- tapping, cabling and site grounding. Cable lazing, krone blocks termination.
* Dial tone testing.

B. Project Name: Smart Project Replacement ODU Transmission (Smart Communications, Inc.)

* Tower works such ODU (9400 AWY) Alcatel-Lucent eqpt. Replacement, surveying sites tower, sites audit.
* 9600 LSY upgrade, replacement of card, E1 converter installation

Telecom Installer

TriBase Telecom, Inc

August 2007 - November 2007

8, Mt Banahaw St. Singson Village, Tipolo
Mandaue City, 6014 CEBU
(August 07,2007 - November 30, 2007) *PROJECT BASED ONLY*
Telecom Installer

Project Name: Globe RU Project (Globe Telecom)
* Installation of Alcatel - Lucent IPDSLAM equipment such as RU 7324, 7330 ISAM-XD, ISAM-FD
* Installation covers power tapping, Shelf-mounting, subscriber cabling.
* Testing of IPDSLAM such as cable continuity test, internet browsing
* Installation of power, cabling and site grounding.
* Test the dial tone, MSAN cabinet, UNO cabinet, Extension Cabinet


Project Name: GLOBE NEMESES Transformation Project (Globe Telecom)

Commissioning Telecom Engineer

Qualifications & Certifications

Andres Bonifacio Elem. School

MRRP National High School (now Handumanan National High School)


Carlos Hilado Memorial State College

Hotel & Restaurant Management

La Consolacion College

Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Supported Countries
Choose your country