Jamwal - Tunnel Excavation With Natm And Drill BLAST Method - Kakrana, UP, India

Manohar Singh Jamwal

Kakrana, UP, India

Services

Tunnel Excavation With Natm And Drill BLAST Method

Summary:

Survey , face cleaning short creating , face profile marking , face drilling as per design patron with drilling machine ,face loading face blast , gas defaming, mucking , face scaling ,bottom dressing first layer short creating ,Rock bolting as per design wire mesh fixing , lattice girder fixing at the as per required space , fore polling,final short creating bottom cleaning ,survey for face profile marking and re cycle start

Work History

FOREMAN TUNNEL

Gammon India Ltd

August 2008 - February 2010

INDIA
Responsible for one shift excavation of upstream and downstream in HRT. Method use in Up streams NATM and Downstream use in method DBM, NATM and Conventional method Full face drilling with control peripheries loading connecting and blast, defaming initial shot concrete, ramp making, mucking, scaling, wire mesh fixing, Nominal SN rock bolting with grouting of cement and resign capsules, Lattice Girder fixing with sport of SN rock bolting, fore poling, first layer shot concrete with SFRS(steel Fiber Reinforcement shot concrete ) SN Rock Bolting bottom cleaning .In loose fall zone maintained with rib erection steel plate lagging, with sport of channel runner, wall cutting, back filling with mass concrete. 7 no Niche making junction making Road maintains drain maintained, pipe line maintains, Ventilation system maintained, material arrangement for next cycle planning and all responsibility in side theTunneletc.

FOREMAN TUNNEL

KIRLOSKAR CONSTRUCTION AND ENGINEERING LIMTED

August 2006 - July 2008

INDIA
Responsible for one shift excavation of upstream and downstream in HRT. Method use in tunnel DBM, as well as conventional method of Tunnel, Full face blast with Burn cut, Pyramid cut, Vertical Wedge cut, Bottom Cut, Buster Cut, Boom cut, V-Cut change the pattern every fourth blast, due to progress.
defaming, scaling, mucking, bottom cleaning, scaling, Nominal SN 5 and 4 meter long rock bolting with grouting of cement and resign capsules shot concrete with SFRS (Steel Fiber Re enforcement shot concrete) Rib erection, steel plate lagging wall cutting runner welding, propping, mass concrete in the loose portion (Cavity) treatment. Grouting with grout pump and mi pump, junction making, itch making, road maintained, drain maintained, pipe line and ventilation system maintained, side responsibility up stream and down streams material arrangement planning for the next cycle and next 3 days DPR reporting two time to Sr. management. And one time arrange the meeting desiccation about our progress and weak points .our motto is safety and good progress

SR.HMV OPP RATER

Hindustan Construction Company LIMTED

April 2003 - July 2006

INDIA

SR. HMV OPERATOR

USB railway project, Gund Tether P.O. Banihal Distt

April 2003 - July 2006

182146.

SUPERVISOR CIVIL

NELLA CONSTRUCTION LTD

January 2001 - December 2002

ANGHI CEMENT PLANT, SANGIPURAM ROAD PROJECT, TALIKA- LAKH-APTH, BHUJ (GUJRAT)
Responsible for Material arrangement, Material shifting, Material Stocking at Crushing plant Material wash and crush, material shift at stocking yard, Batching plant, and material measurement material feeding in batching plant, in national highway Sangipuram Bhuj Gujrat, Batching plant at a Sangi cement plant Sangipuram, capacity 60 cubm/hr. Water bound Macadam road, preparation of sub grade, laying of base souling, laying wearing surface in surfacing
Method of rolling, preventation of dustnuisance, play road, surface dressing, premix methods.
Receiving the message from Sr. management and pass to the contact person as they are responsible person. So I am responsible the all batching plant work related civil.

SUPERVISOR CIVIL

RAINA CONSTRUCTION PVT LTD

August 1998 - September 2000

INDIA
Responsible for material arrangement from batching plant, material
stocking, material measurement, road structure, foundation, sub grade, high flow level,
Soiling and all work of road construction.
Material shifting, material dressing road compacting with good method fallow the order our seniors

SUPERVISOR CIVIL

JANTA BUILDER'S

April 1996 - July 1998

INGAL KATHAD JAMMU UDHAMPUR RAIL LINK PROJECT
Responsible For attendanc, open excavation, drilling, loading, blasting, mucking, dumping, filling, compacting, shuttering plane cement concrete, reinforcement cement concrete, Colbert bridges, drainage. Phase drilling, phase loading, connecting and blasting, defaming, scaling, ramp making, mucking, wire mesh fixing, wet-shot concreting, Rib erection, back-filling, grouting, four poling, drain maintenance, air pipeline, water pipeline, dewatering pipeline maintenance,
Duct pipe maintenance, wire rope fixing for hanging the duct pipe and road maintenance etc

PERSONAL DETAIL

From January 1975

09-01-1975


Languages' Known: English, Hindi, Dogri, Punjabi.
Professional: Tunneling, , Batching
Plant and Lab testing
Specialization: Tunneling
Current salary: 40,000/- PM
Salary Expectation: Negotiable

Qualifications & Certifications

civil

UNIVERSITY MEGHALYA

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×