Thangaraj - Governor Specialist - Mumbai, MH, India

Manikandan Thangaraj

Mumbai, MH, India

Services

Governor Specialist

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Summary:

Certificate holder for 505/505E turbine speed controls at M/s. Woodward India Pvt. Ltd,
Haryana for installation, commissioning and troubleshooting.
Major Projects Handled in Industries & Companies
Have successfully retrofitted the existing mechanical governing system with fully electronic
governing system in various turbines. This includes the selection and study of suitable control system,
programming, pipe line design according to the system requirement.
The following projects includes the control systems such as 505/505E, CPCII, TG13E etc. Apart from
these troubleshooting of Woodward speed controls in turbine/engines at various sites.
 Commissioned 13.5MW SKODA Turbine at M/s. TATA Chemicals Ltd. with Woodward 505E and
CPC II.
 Commissioned 13.5 MW English Electric Turbine (LPT-6) at M/s. Tata Chemicals ltd.,
Mithapur, with Woodward 505E Digital control and CPC II.
 Commissioned 11.5 MW Skoda turbine with Woodward 505 control (removed Trisen control)
at M/S. Prabhulingeshwar Sugar and Chemicals Ltd., Jamkhandi, Karnataka.
 Commissioned 6.3 MW BHEL Turbine at M/s. Riddhi Siddhi Gluco Biols Ltd., Gokak, with
Woodward 505 Digital control and CPC II.
 Commissioned 9.5 MW BHEL turbine at M/s. TATA Chemicals Ltd. with Woodward 505 control
and CPC II.
 Commissioned at M/S Venkateswara Power Projects for Retrofitting 8 MW Allen make turbine
with TG13E &505 controller.

Work History

Service Engineer

GOODWILL GOVERNOR SERVICES

From January 2009

Major Projects Handled in Industries & Companies
Have successfully retrofitted the existing mechanical governing system with fully electronic
governing system in various turbines. This includes the selection and study of suitable control system,
programming, pipe line design according to the system requirement.
The following projects includes the control systems such as 505/505E, CPCII, TG13E etc. Apart from these troubleshooting of Woodward speed controls in turbine/engines at various sites.


• Commissioned 13.5MW SKODA Turbine at M/s. TATA Chemicals Ltd. with Woodward 505E and
CPC II.

• Commissioned 13.5 MW English Electric Turbine (LPT-6) at M/s. Tata Chemicals ltd.,
Mithapur, with Woodward 505E Digital control and CPC II.

• Commissioned 11.5 MW Skoda turbine with Woodward 505 control (removed Trisen control) at M/S. Prabhulingeshwar Sugar and Chemicals Ltd., Jamkhandi, Karnataka.

• Commissioned 6.3 MW BHEL Turbine at M/s. Riddhi Siddhi Gluco Biols Ltd., Gokak, with
Woodward 505 Digital control and CPC II.

• Commissioned 9.5 MW BHEL turbine at M/s. TATA Chemicals Ltd. with Woodward 505 control and CPC II.

• Commissioned at M/S Venkateswara Power Projects for Retrofitting 8 MW Allen make turbine with TG13E &505 controller.


Declaration
I hereby declare that the above particulars furnished by me are true to the best of my knowledge and belief

Qualifications & Certifications

Electrical and Electronics Engineering

National Institute of Engineering and Technology

Electrical & Electronics Engineering

Thanthai Roever Institute of Polytechnic College

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×